I'm a freshly minted university graduates, graduated from Xi'an University of Petroleum in 20--years, majoring in material molding and control engineering, graduated from the technical group of the Inner Mongolia Project Department of the Hebei Huabeisi Petroleum Engineering and Construction Co. To 20 - August work has been a year, in this short one-year period of time I learned a lot of school can not learn the knowledge, broaden the horizons, improve the level of professional and technical skills and work ability.
First, participate in the project
In this year, I participated in the Guangdong Daya Bay 800,000 tons of polyethylene project, oil extraction plant to stay eighteen transfer station (Phase II) renovation project, the second station renovation project, the road 70 joint station reconstruction and expansion project, as well as the current construction of the North China Oilfield Erlian Branch of the 53 wells group too test mining ground project. Just arrived at the unit to work in the South China Sea Petrochemical Project Department in Daya Bay, Guangdong Province, the South China Sea Petrochemical Project is a joint venture construction project by Sinopec and foreign companies, in the South China Sea Petrochemical Project, I took part in the 1014 block of the organization of the technical information and translation of drawings, and later on in the 1012 block of the work is responsible for the anticorrosive heat preservation and elimination of tailing project work. After returning to Renqiu, I participated in the renovation project of Oil Extraction Plant No. 3 Stay 18 Transfer Station (Phase II) and the renovation project of Li-II Station. The projects of Stay 18 and Li-II Station are old station renovation projects, and there are many dangerous places in the station where fires are connected with each other, together with the complexity of local relations, which caused great inconvenience to the construction. Under the guidance of Zhang Zengjie of our technical team, I was mainly responsible for the organization of technical data of these two projects. In March this year, I participated in the road 70 joint station reconstruction and expansion project, road 70 joint station is located in - - township and - - township junction, north of the Guyang River, the contents of this expansion are: the construction of additional outgoing system and dewatering system, the construction of additional water injection and sewage treatment system.
The project I am currently taking part in is the Tai 53 Well Group Trial Recovery Ground Project, in which I am mainly responsible for the construction of the in-station process, the off-station single wells and the civil engineering part of the project. Uriastai oilfield is located 7km north of Dongwuqi, Xilingol League, Inner Mongolia Autonomous Region, about 50km away from Mongolia and about 165km away from Arshan oilfield base, which belongs to the Uriastai depression at the northeast end of Manit depression in Erlian Basin. The ground project of Tai 53 well group test mining consists of four parts: metering and oil pulling station, natural gas compression, off-site system, and Ar-Yilian pressure regulating station. There is one new metering and oil pulling station, located in the north side of Tai 53 wells, in which there is one 9-head metering skid, two separators, two heat exchangers, one natural gas dryer, two oil removers, two hot water pumps, one water injection pump, four 40m3 elevated oil tanks, and one 10m3 water return tank. In addition, there is also a separator operation room, a duty room, a hot water pump room, an electric distribution room, a maintenance room, a water pump room, and a store room, Laboratory and other plants;
The off-site system has 9 oil wells and 4 injection wells construction; too 27 injection pump house expansion project and 3 injection wells test mining ground works; natural gas compression part is located in the Urias too oil field too 53 wells north of the middle within the metering and pulling oil station. The unit is to receive the test recovery associated gas from the primary production separator, associated gas into the unit, through the dew point control skid block separation dehydration, dealkynization. Then part of the natural gas goes to the gas generator for fuel, and part of it goes to the natural gas compressor to be pressurized to 25MPa, and then goes to the molecular sieve dehydration device for dehydration. After pressurization and drying, the natural gas is loaded into CNG high-pressure trailer and transported to AYL, which is used as fuel for the heating furnace after pressure regulation; AYL regulating station accepts CNG compressed natural gas from Tai 53 metering and oil pulling station, and enters into the regulating skid through the unloading port, and then goes to the heating furnace as fuel after two heat exchanges and two levels of throttling.
Second, the improvement of professional knowledge
I am studying material forming and control engineering, which is the former welding equipment and technology. In the school only learned some theoretical knowledge, few opportunities to practice, site is a good place for me to learn and practice. After arriving at the site, I found that the theoretical knowledge I learned in school was too superficial, and it was very difficult to practice, so I asked the master workers to teach me humbly at the site, and I asked if I didn't understand anything, and after one year's work practice, I increased my professional knowledge, improved my practical ability, and combined theory and practice very well. In Nanhai petrochemical project, the official language is English, in order to be able to better complete the work, use the noon time and evening time to learn professional vocabulary and practice speaking, as far as possible and foreigners on the construction site to communicate, through the study and exchange of my English level has improved greatly, especially the level of speaking. Make full use of the spare time has systematically learn the oilfield production, management theory knowledge, learn from the teacher, in-depth site construction line, pay attention to the accumulation of experience in practice and absorb the lessons, soon adapted to the work, and strive to complete their own work.
Third, the experience of participating in the work
Previously I heard that the oil construction work is tired, workers are very hard to come to the site after feeling the workers. Hard, in the Erlian area workers with four special to describe, especially hard, special work, special dedication, special patience. Workers have three seasons a year outside the construction, can not take care of their parents, wives and children, they work hard, never a complaint, this selfless spirit of dedication is what I must learn. I learned how to face difficulties, how to be a human being, and how to set up a correct outlook on life and values from the exchanges with the workers. Whether in Nanhai Petrochemical or in the oil extraction three plants and Erlian area, the requirements for the quality of the project are getting higher and higher, and the technicians have to be strict, especially in the management of the low old bad problems and mandatory provisions. Through a year of work and study I feel that as a technician must be careful, serious, every step of the work, to be familiar with the process, to be familiar with the drawings, to be more familiar with the norms, but also to continue to learn and engineering-related, and professional-related knowledge, with knowledge to arm themselves.
Fourth, the company's recommendations
With the development of society, people's demand for quality is getting higher and higher, quality is a solid foundation for the survival and development of an enterprise. The improvement of quality depends on the improvement of the overall quality of workers and technical management level, in order to be able to face more fierce competition, cultivate high-quality, high-level professional technicians and managers is the focus of the company.
The past work, in the care of the leadership and comrades support and help, after continuous efforts, I adapted to this kind of work, with a certain degree of technical work ability, but there are still some shortcomings, in the future work, I want to strengthen learning, overcome shortcomings, and strive to improve their professional and technical level can continue to improve. At the same time, I clearly recognize that, in order to adapt to the new situation of the development of oilfield construction, the future also need to constantly strengthen the theoretical learning, especially new technologies, new theories, hard work, in the actual work of exercise and growth, and continue to accumulate work experience, improve the business capacity and level of work, for the development of the company to make their own new and greater contribution.
Engineer technical work summary report 范文2
I know nothing about the balancing machine from a layman into a familiar with the principle of balancing machine familiar with a variety of products of the company's professional and technical personnel, but also in the management of the department and the communication with the people I also have a deeper understanding, I know that I have made these advances and company leadership training is inseparable. I know that the progress I made and the company's leadership training is inseparable. Without their tireless teaching and time and time again to give the opportunity I will not make progress today, looking forward to - year is a year of opportunities and challenges, I will unite around the company's leadership core, hard work, hard work, for the company to a higher level of development to make their own contribution.
Looking back at the beginning of the year, although in the year - the company achieved gratifying results, but the company's leadership is not complacent, but for the year - a higher goal. I also after a short period of adjustment immediately into their roles, then in accordance with the instructions of the leadership, I am responsible for the management of the R & D Department and the electrical workshop production management work. I firstly designated the details of the departmental work scope, and clarified the work tasks of the whole department. And each member of the department in the whole department's work in the scope of responsibility for the provisions and has been issued in writing to their hands, I made the department members of the structure of the composition of the map, clear subordinate relationship. I think in the completion of the company's department to the task at the same time to establish a disciplined, centripetal force of the team to better serve the company is the leadership more hope that I can do. At the beginning of ---- my department staff has undergone great changes, the first is Li Xin's departure According to the instructions of the company's leadership, I quickly adjusted the structure of the department, will be mainly responsible for the original electrical production of Dong Jianjun to take over the research and development work of Li Xin, will be the original only involved in the electrical production of Xu Jianwen arranged to be responsible for the production of production management and participate in the production of the position, in my organization of Li Xin's work back up, I found that the one machine Microcontroller program can not work properly, I use other methods to find Li Xin to get back to the program can be used, and to complete the Li Xin is responsible for a Dong project in April, Dong Jianjun left the company, affecting the first micro-motor automatic balancing machine part of the preparation, in order to ensure that the equipment exhibits, I worked overtime continuously, the May Day holiday is not an exception, and finally realized the equipment exhibits before the goal of a smooth action.
At this time, the leadership of the company also continued to provide me with new technical personnel to supplement the work of the department. In the new personnel can not be fully competent stage, in order to complete the production task, I am often multi-tasking, from the design of electrical diagrams, to guide and participate in the completion of power distribution and then the new plc program and touch screen program writing, equipment factory debugging are completed by me alone. Many times in order not to delay the progress of the project I use their spare time to work overtime. I have been working overtime until very late at night without a car, so I paid for a taxi to go home.
Engineer Technical Summary Report 3
Into the company has been nearly half a year, in the company's leadership of the strong leadership as well as care for the support of individuals in the 20 - year has made considerable progress. I am in the process of work, better to complete the 20--year annual work objectives. Now the 20 - year personal work situation is summarized as follows:
First, the annual work situation
1, familiar with the company's rules and regulations
I entered the company in 20 - year - month, in order to faster and better integrated into the company's team for the work of the future to pave the way for the company's rules and regulations, and familiar with the company's corporate culture. I am familiar with the company's corporate culture. Through understanding and familiarization, I am proud of entering the company's team, and at the same time, I also feel the pressure on myself. In the future work, I will take the company's rules and regulations as a guideline, strict requirements for themselves, integrity and self-discipline, in the case of adherence to the principle of innovation, faster and better to complete the work task.
2, familiar with the structure of the project, the site
As a civil engineer, familiar with and understand the site is quite favorable to the future work. In order to better carry out the work in the future, I have been to the scene many times, the scene of the arrangement to do a deeper understanding. After grasping the first-hand site information, I consult the relevant technical information, the structure of the project to study the situation, to analyze the future construction of the major difficulties, the foundation of the project form of analysis, through the study and analysis, I do more objective prediction of the actual situation of the project construction management for the next step in the preparation of the program to provide a reliable basis.
3, participate in the engineering department management system modification
In order to facilitate the future management of the engineering department, I combined with the company's requirements and the actual situation of the engineering department, and reference to the Boai and other well-known real estate companies of the relevant system, the preparation of modifications to the Ministry of Engineering Engineering management of the rules and regulations, the preparation of the system is conducive to the clarification of the duties of each position, for the protection of engineering management. The preparation of the system is conducive to clarifying the responsibilities of each position and providing a guarantee for project management. Through this preparation, I have a further understanding of the project development of other professions, but also to make their next step work more clearly.
4, analyze the 20 - year weather conditions
In order to complete the 20 - year company's project development tasks, and to make a scientific and realistic 20 - year engineering department's work and project construction progress plan, I analyze the 20 - year weather conditions throughout the year, combined with the Wuzhi County's weather conditions throughout the year, the 20 - year weather forecasts, while the weather conditions and the project progress. At the same time the weather conditions and the progress of the project combined with each other, the progress of the project to make reasonable adjustments, grasp the construction of a good season, to avoid large-scale construction in the rainy season, and do a good job in the rainy season and the construction of the high temperature season and safety protection measures.
Second, there are shortcomings and improvement measures
20 - year is about to pass with the wind, looking back on their own work in the company for nearly half a year, although the workload is relatively large, but the flash point is not much, many of the work is not as good as it should be, summed up the inadequacies of the following points:
1, the lack of communication, can not make full use of resources
2, lack of planning
In the work process, especially the construction phase of project development, due to the lack of planning, the purpose of the work is not clear enough, the primary and secondary contradictions are not clear, and often achieve twice the result with half the effort, the leadership is not satisfied with not to mention that, they also have a stomach of grievances. In the future work process, I have to seriously develop a work plan, do things to strengthen the understanding of the purpose, clear primary and secondary contradictions, and strive to achieve twice the result with half the effort.
3, the professional face of the narrow
As a modern talent, he should be a multi-functional, so that the talent to meet the times and the company's needs. Their own professional narrow, not enough knowledge of other real estate professionals, especially marketing planning and laws and regulations, which limits their own development. In the future work process, I will strengthen other professional learning, make full use of the company's resources, improve the subjective initiative, and strive to become a multi-talented composite talent.
Engineer Technical Summary Report 4
I have been engaged in professional and technical work and technical management, in the work, I always adhere to the combination of theory and practice, active, proactive in-depth engineering and construction of the first line, adhere to the modest, down-to-earth, hard-working work guidelines, and has accumulated a wealth of practical experience, and has achieved certain work results. A certain degree of work achievements, recognized by the majority of workers, unit leaders and construction units. Now summarize this year's work.
During this period, I have been through a number of key projects construction, completed a number of industrial, civil projects electrical engineering installation, commissioning, system start-up and operation work, the preparation of a large number of construction organization design, construction program, the system commissioning program, the construction, installation process of technical management, production management has a more comprehensive and systematic understanding. Years of hard work in the construction line, from the breadth and depth of the great expansion of their professional and technical knowledge, improve management capabilities.
First, the electrical commissioning work
Participated in the commissioning of various types of electrical equipment and system commissioning work. Including: power generation system, power distribution system, AC and DC speed control system, program control system and so on. From the preparation of the commissioning program, power supply program, system start-up program, to the unit pieces of debugging, system debugging implementation. This work from start to finish, enhance their own system concept and the ability to grasp the overall situation. Electrical commissioning work is a very high technical content of the types of work, is the project from the design, product to equipment installation and other aspects of the quality of the inspection, is a key step in the construction process.
We overcame the incomplete information, no other experience to draw on and other difficulties, seriously study the performance of the equipment, to develop a practical debugging program and the smooth implementation. By the Party and the foreign technical experts of the praise and affirmation. It is at this stage, I really have a deep perceptual understanding of the electrical installation and commissioning project, the first professional knowledge applied to practice, and realize the first combination of theory and practice. It is also at this stage, I initially have the ability to independently organize and implement and ultimately complete the construction task.
Second, the technical quality management
Co-operation with the branch director of the engineer to organize the implementation of the technical quality management system, construction acceptance of technical specifications, operating procedures, safety and technical regulations issued by the higher level of the technical provisions of the timely resolution of the implementation of the problems that exist; organization of the preparation of a number of projects, construction design and technical programs, to participate in the branch and organize the technical staff to participate in major conferences organized by the company, the technical staff to participate in the conference. Technical staff to participate in the preparation of construction organization design of major projects organized by the company.
Third, quality inspection work
organization, participate in the branch of the quality inspection, and organization of a number of projects quality assessment work; in the construction project to actively carry out technological innovation and rationalization of the proposed activities, the organization of the "four new" technology to promote the application of; presided over the preparation and implementation of the branch of the winter, Rainy season construction measures, so that the branch of the construction project of the seasonal construction of safe and orderly; in the company under the leadership of the Ministry of Technology, vigorously carry out technical training, improve the quality of skilled workers, to ensure the technical level of the construction team.
In short, in the leadership of the support, help, in the engineering and technical experts, seniors training, I have made certain achievements in different jobs. Achievements have become the past, I am facing challenges from the new century, new technologies, new issues. In the face of challenges, I y realize my own shortcomings, the gap is huge. I must, as always, study hard, work hard, and constantly increase knowledge, improve ability, for the development of enterprises, for the progress of society to do their part.
Engineer technical work summary report sample 5
A construction
1, the railroad. From March in the first half of the year to November in the second half of the year, the construction task is almost a continuous blockade throughout the year, the weight of the task, the intensity of the construction is the company's history has never been, the leaders of the overall deployment, the leaders, the vast majority of employees, despite the fatigue, thousands of miles of war, continuous combat, and successfully completed more than 1,000 staff and civilian workers from -- to -- the thousands of miles of large-scale transfers, the next time to complete the blockade of the task of safety and on time, for the group company to win the reputation of the group again! The company has won a reputation for the group again.
2, highway. - - tunnel construction, to - - May entered the offensive stage, has overcome the poor geological conditions, serious financial constraints and other difficulties, in - - October 18, 13 days ahead of the triumphant completion of the opening, by the owners and supervisors unanimously praised. - - Expressway clearly requires the project to schedule, rational organization of production, layers of guarantees to the person, detailed decomposition to the work process, the work shift, to ensure that the project period to be completed.
Second, the development work to accumulate strength, thick and thin
-- years although personal resume some of our development projects fell through, but we have accumulated experience, exercise the team, all developers diligently practicing the basics of information processing, bidding quotes, tender preparation level and other aspects of the ability to have a great deal of improvement. The quality of development personnel has been significantly improved, the development investment has increased from weak to strong, and the development system has gradually realized professionalization and standardized management. "Instead of envying the fishermen, it is better to retreat and knot the net" to the mountain flowers when "we will usher in a bright spring.
Third, the construction of corporate culture, outstanding achievements, learning atmosphere is increasingly strong
"Corporate Culture Guidebook" as the standard, to carry out the "corporate culture month" as a carrier, vigorously carry out the construction of corporate culture activities, to create a positive spirit throughout the company, to cultivate the spirit of teamwork and promote The enterprise spirit of "truth-seeking and innovation, the pursuit of excellence", advocating innovation, striving for first-class, self-transcendence consciousness, so that the spirit of enterprise has become a guide to action for all employees. Through effective cultural inculcation, cultural dissemination and strong ideological work, the majority of employees on the corporate culture from understanding, obedience to the transformation of conscious awareness and action, effectively promoting the improvement of the overall work of the enterprise. Through the implementation of "project standardization management", further standardize the construction site management and construction work procedures, and vigorously carry out the creation of "civilized site", "civilized resident", "Civilized office" and a series of activities, and grasp the pilot, select a typical, to take the lead, to promote the company-wide, to create a good atmosphere for creating a safe and civilized site. Achieved: hardening of roads in the work area, accurate material marking, machinery management in an orderly manner, the construction process, the construction staff dressed neatly, licensed, standardized operation, the entire construction site in order, and played a role in establishing a new image of the window of the enterprise.
Fourth, the realization of safety and quality, construction progress win-win
This year, the implementation of the responsibility package, in-depth implementation of the "two rob, three to create a" labor competition, ahead of the quality and quantity of the construction tasks completed. Safety work adhere to the principle of pre-control, pre-emptive, and further strengthen the construction of seven mechanisms of safety management, deepening the safety management system of responsibility at all levels. This year's annual safety production is stable, without any accidents, in --- blockade construction, --- station renovation and --- speed construction more than 70 large-scale blockade construction period, we are safe time and again on time, and to achieve the "one thing is not out, a person is not injured, a chapter is not violated, a point is not delayed," the good results, especially --- speed switching in the fork, the up and down line normal 160 kilometers. Especially - speed switching, up and down the main line under the normal 160 kilometers of speed construction, did not occur in a case affecting the train of the red band appeared, by the - Bureau of praise, the full implementation of the goal of safety work. By the end of December, the realization of safe production - - days.
Quality work is the key link of the construction enterprise, but also the eternal theme of the enterprise. With the enterprise concept of "not to compete with the first-class, is backward", careful construction, shaping the fine. - - frame structure has achieved good results in the direction of the top, high and low zero deviation, was highly evaluated by the leadership, - - speed switching construction quality has been repeatedly praised by the - - Bureau, for the enterprise to establish an image, improve the credibility of the competition in the market has laid a good foundation. This year to sub-projects 719, of which 719 good; division project 178, of which 178 good; unit project 53 pieces, of which 53 good, good rate of 100, the acceptance of the project 10, good rate of 100.
Fifth, comprehensively promote the responsibility of cost management, the implementation of the contracting budget for capital control.
In accordance with the comprehensive budget plan formulated at the beginning of the year, focusing on control, implementation to ensure the realization of the indicators. From the company to the project department to form a set of systematic network system, special people responsible for, focus on control. Strong push comprehensive budget management, grasp the cost process control. Newly opened projects have been prepared for the construction budget and responsibility cost budget, forming a
first calculated after dry, project profit and loss beforehand, the whole staff to control the cost of a good atmosphere. Really do before the dry budget, dry in the accounting, dry after the final account. Through standardized management, project costs have been effectively controlled. This year, due to heavy construction tasks, construction points, funds are very tight, but we strengthen the control of funds to ensure that the project requires much-needed funds. This is the result of our deepening management and strengthening cost control.
Achievements can only explain the past, the past has become history, we attach importance to the past, can enhance our sense of pride and self-confidence, but never complacent, stubborn. At present, we are facing new opportunities and challenges. We believe that, under the correct leadership of the new group of companies, in the company's concerted efforts of the majority of employees, there is no difficulty that can not be overcome, there is no work that can not be done; we also believe that we also see the company's future is how beautiful, the company's tomorrow is how vibrant.
When the lights, *** enjoy family happiness and warmth, can have seen the lights that stay up all night; when happy, share the joy of generous remuneration, can have seen the construction line in the construction of the hard-working people. In each construction battlefield, from railroads to highways, from bridges to tunnels, everywhere sprinkled with all the employees of the company's hard sweat, and left a solid footprint.
Engineer technical work summary report model 5 Related articles :
★ Engineer professional and technical personal work summary model 5
★ Engineer personal work summary model 5
★ Engineer year-end work summary model 5
★ Engineer end of the year summary report
★ Engineer end of the year work summary report 5
★ Technical work summary of the latest model 5
★ Engineer personal work summary report 10
★ 2020 engineer work summary model 5
★ Technician personal work summary model 5
★ Engineer year-end summary of the work of the model 5
★ Engineer work summary of excellent The first time I saw this, it was a very good idea to have it on the website.