I graduated from Fujian Resources Industrial School in 20xx in x months, "industrial enterprise electrification" professional, 20xx x months into Longyan Guangfa Decoration Company Limited work as a company builder, in the work of conscientious and responsible, on time to complete the leadership of the various tasks. Since joining the company 7 years, the company's leadership and the support and help of colleagues, in accordance with the company's requirements, strict requirements for self, and better fulfillment of my job. Through the company's learning and work, I have a greater gain in professional and technical, ideological. My work statement is as follows:
Since joining the work, abide by the company and the project department's rules and regulations, obey the leadership's work arrangements, * complete the work task, to meet the construction progress of the construction side. Maintaining the honor of the masses, the ideological demand for progress, responding to the company's call, seriously implement the company's documents and the spirit of the meeting. Work hard, work hard, conscientiously study related experimental knowledge, understanding of new building materials testing and application, and constantly enrich and improve themselves. To achieve unity of thought and action. Adhere to the quality first, safety first idea to guide my work. Do not let go of every detail of the work step. Do work seriously and rigorously, seeking truth from facts.
1. Professional knowledge, work potential and specific work
From the drawings to the drawing review, carefully check each part of the details, check the data, think about the construction steps program. Do have a map in your head. Organize drawing review. Coordinate the exchange of views with the owner, design, supervision of all parties. Into the project start, carefully understand each part of the construction details, according to the requirements of the design drawings, strict preparation of the professional construction program, the preparation of the key points of the operating instructions, supervision units to confirm the implementation. At the same time in the process of construction preparation for the team to carry out technical, safety briefing, the team to do the construction information in mind, according to the strict requirements of the construction specification.
During the construction process, do a good job team self-test, re-inspection, full-time inspection "three inspections", while doing a good job of sub-parts of the quality inspection and assessment records, hidden records and related quality assurance information. Strict control of raw materials, semi-finished products, finished materials applied to the project.
In 20xx x month just entered the company, the civil construction is not too familiar with the construction process practice is not very familiar, I will be humbly asked to teach the master, the night time first look at the drawings, and make notes; daytime with the problem to see how the workers construction, and do not know how to teach the construction workers, soon I was no longer unfamiliar with the construction process and drawings, from do not know how to read the drawings to drawings to be able to independent construction; and can be in accordance with the construction process, the construction process is no longer unfamiliar. Construction; and can be constructed according to the map on the basis of the construction, but also be able to efficiently and innovatively complete the construction tasks and coordination of a variety of processes with;
20xx x month thanks to the company's trust in me. I began to serve as a cotton beach hydroelectric power station office building decoration project constructor, how to rationally organize each team to complete the construction task is a test for me. In the work I continue to explore in practice and in the construction of this project quality and quantity and ahead of schedule to complete the work task; and got the construction side and the company's leadership to praise.
20xx 12 company appointed me Jiahua apartment 1 #, 2 #, 3 # building of water and electricity constructor, the main work are: First, pre-construction preparation, including technical preparation, material preparation, preparation of machinery, site preparation, construction organization and personnel preparation; Second, with the progress of civil construction to do a good job of the various holes reserved for the composite work of the pipe groove; Third, pipe brackets, supports for the production and corrosion treatment and proper storage; Fourth, pipe brackets, support production and anticorrosive treatment And proper storage; Fourth, accessory inspection, such as: valve installation, should be made before the strength and tightness test, for the main pipe to cut off the role of closed-circuit valves, should be made each strength and tightness test; pipeline installation; Fifth, piping system tests, such as:
Pressure test - civil building water supply piping system, fire fighting system and outdoor water supply piping network system of water pressure test must be adapted to the design requirements. When the design is not specified, the test is carried out in accordance with the design requirements. When the design is not specified, the test pressure is 1.5 times the working pressure shall not be less than 0.6Mpa.
Flooding test - filling to full water for 15min, the surface of the water dropped and then filled to observe the liquid level does not fall for 5min, indoor drainage pipe interface without leakage is qualified;
Ball test - indoor drainage standpipe and the horizontal trunk, the end of the installation should be made after the ball test! The ball diameter is not less than 2/3 of the drain pipe, through the ball rate of 100% is qualified.
Six, anti-corrosion insulation
Seven, piping system after passing the hydraulic test, pipe cleaning. And make up the internal information and organize acceptance.
20xx to be responsible for Longyan Industrial Bank office building renovation project, as a construction worker, is responsible for arranging and organizing the construction of various groups, the coordination of various groups and quality and quantity to complete the renovation, put into use,
2. work attitude and diligence and dedication
love my own work, can be correctly and seriously deal with each job, wholeheartedly into the work, conscientiously abide by the company's rules and regulations
the work, and conscientiously abide by the company's rules and regulations. Work, seriously comply with the company's rules and regulations. Effective use of working time, adhere to the post, need to work overtime to complete the work on time to ensure that the work can be completed on time. On the scene with the workers to mingle, to convince people with reason. After work also attentively participate in re-education and training, in 20xx x month participated in the Longyan Talent Training Center of business management professional learning and xx year to obtain the second level of registered construction engineer qualification certificate (electromechanical engineering).
3. work quality achievements, benefits and contributions
Before carrying out the work of personal work plan, there are primary and secondary successive and timely completion of the work, to achieve the desired results, quality and quantity of work, high work efficiency, at the same time
Learned a lot of things in the work, but also exercise the self, after unremitting efforts to make the level of work has made great progress. Progress, create a new situation for the work, for the company to make due contributions to the work.
Despite the necessary progress and achievements, there are still shortcomings in some areas. For example, there are creative ideas for work is not a lot, individual work is not perfect, which is to be improved in the future work. Strive to make the ideological awareness and work efficiency comprehensively into a new level, enrich the self-construction management experience, spare time to strengthen the study of the application of new technologies, in order to adapt to the development of the construction market environment trends, increase the management of on-site production management, technical quality management, courtesy of the construction of the management of the site, the use of advanced scientific management concepts, advanced technology and management experience and advanced management techniques at home and abroad.
The company's management concept is based on the concept of advanced scientific management, combining the advanced technology and management experience with the advanced management technology at home and abroad, and constituting the self-independent technical advantages.
It is fortunate that Longyan Guangfa Decoration Co., Ltd. recommended me to declare the title of assistant engineer, which is my encouragement and encouragement. Regardless of whether it can be assessed, I will use the engineer's requirements to strictly require themselves, work seriously to find gaps, seriously learn the strengths of others, and constantly enrich their knowledge, and constantly improve their level of technical management, so that the future work of the next level, for the company and the construction industry to pay my due contribution.
Second
I have been working since 20xx in x months, work seriously, hard work, in the guidance and help of seniors and masters, has grown into a strong business potential of the technical staff, the following is my experience:
First, a correct attitude, rigorous science
Road and bridge construction work is a very difficult industry, the wind and sun, but also to the construction industry. Industry, wind and sun, but also run around, but also need to work carefully, so there is no optimistic attitude and rigorous scientific work spirit is not. Information and budget work is not to engage in scientific research, but also absolutely can not be sloppy, "not even a fraction of a mile" is used as a metaphor for the work of information, and "a son of a mistake, the whole plate are down the rope" is used to describe the work of the budget.
Second, pay attention to the speculation, serious proof
In the information and budget work, very much in need of "pay attention to the speculation, serious proof" of the spirit of work, because it is not only the style of work of the problem, but also directly related to the quality of work. In the preparation of information and budget before, must carefully review the map, the map on the wrong place to the design, supervision units to put forward in a timely manner. Before preparing the budget, we should use the data given in the drawings, use various formulas to verify, but also use different calculation methods (e.g., positive calculation, negative calculation, etc.) to repeat the calculation, to ensure that everything is safe. Assistant engineer probationary period work summary excellent example assistant engineer probationary period work summary excellent example. In preparation for the preparation of information, we must first revisit the drawings to see whether the design drawings of the local construction process has special requirements, or there is no conflict with the current construction process, if there is a conflict, then take the principle of "from the strictest but not from the lenient" to deal with, and make a written report to the director in a timely manner. In the process I not only deepen the understanding of the original learning knowledge, but also on the previous books did not touch or contact deep knowledge has a further understanding.
Third, strict and careful, thoughtful
In the work, thinking about the problem must be strict, thoughtful, the design of the place is not mentioned, to combine the current specification and the actual situation to think, to see if there are omissions and errors. The following is a brief description of the various work:
(a), drawing review:
After receiving the drawings, you should immediately carry out the review of drawings. If the drawings are more, can be divided,
each professional designated by the person responsible for, and by the person who calculates the amount of work, the person who reviews the elevation, the person who reviews the coordinates, to achieve a clear division of labor, but also cross, each of which is carried out by two or more than the second review of the work, found that the problem should be recorded in a timely manner to summarize the person responsible for the technology to further review and then organize the report to the design, supervision units. Review of the map is mainly carried out as follows:
(1), the elevation of the review, according to each structure or structural layer of the height difference, layer thickness, longitudinal slope, horizontal slope, slope, etc. to back-calculate the elevation of each point, to see whether it is in line with the map to bring. Such as from the beginning of the road to the end of the road is consistent.
(2), the amount of review, generally in the drawing size review after the error, according to the drawing size (or corrected size of the structure) for the calculation, shall not copy the drawings in the number of works in the table of the data, the calculation should think about a variety of actual conditions.
Fourth, the internal organization
In the data organization should pay attention to the data comprehensiveness, authenticity and timeliness, in addition to pay attention to the design drawings and owners, supervision of other individual requirements. For example:
① some projects on the safety of the personality of the strict requirements, then the completion of the data in the finishing of each day's pre-shift safety activities, the construction of various projects safety technology delivery, the project's safety system and management process of this part of the data to be personalized to organize well.
② Some projects due to various reasons, change the project more, then the change of information, such as photographs, pictures, engineering negotiation records, on-site measurements, measurement records, the original design drawings, change drawings, etc. must be organized.
③ All hidden works acceptance records must be timely and perfect, not missing, or may bring serious consequences to the completion of the acceptance. Assistant engineer probationary period work summary excellent sample default classification.
V. Budget:
When making the budget, we should pay attention to the combination of the actual situation of the company and the construction site for comprehensive thinking, in order to make the most reasonable budget. For example:
① some projects, the party specified a material or equipment, then we must carefully investigate the status of the material or equipment, including the supply situation and whether the price will change.
② Some projects use a material or equipment, the company is self-picked materials, lower cost, that can be lower bidding, and vice versa is not possible.
Three
A year of work experience, deep feelings, harvest, in the leadership, colleagues' guidance and help work has started, life has entered the track. Now the work is summarized as follows:
One. Ideological progress
As a preparatory party member, no matter where you are, always adhere to the serious study of Marxism-Leninism, Mao Zedong Thought, Deng Xiaoping Theory and the important ideas of the three Represents, adhere to seeking truth from facts, and continue to improve their political and ideological awareness and level, and continue to explore and pursue, and strive to continue an upwardly mobile heart.
II. Improvement of professional knowledge and skills
Theory from life and higher than life, and ultimately restored to life, more than a year of work, I y appreciate the process of transformation. In the work I realize that I have to learn a lot of things, starting from a small place, the big picture, study hard and ask questions, timely and different requirements for the self, the work constantly summarize the lessons learned to enhance their potential at the same time, to make up for some of their own shortcomings.
III. Participate in the work of the experience
I believe that the work must be done: can suffer, can work, can dedication, can endure, so that we can have harvest, have improved. A year of work, I learned how to cope with the difficulties, how to do a good job, set up a correct outlook on life, values. This year there are many shortcomings, for example, the business process is not too clear, CAXA and other systems are not very understanding, the idea is still to be deeper to improve, these shortcomings I will work in the future to avoid the shortcomings of life, as soon as possible to improve themselves.
The above is my summary of my work over the past year, although the results are mediocre, unnoticeable, but dedicated, hard work, solidarity with the masses is my eternal pursuit, and I expect that in the future, under the leadership of colleagues care to help, can make continuous progress.