Construction project budget including project cost calculation form, material and material summary table, each division of the project budget form, each form composition and compiled into the project budget. Project budget is the final results of the project budget or construction budget documents, is the implementation of the design drawings of the important basis.
In accordance with national regulations: the capital construction project budget is along with the construction program in stages. Due to the budget system at all stages of the basis and depth of work is different, the capital construction project budget can be divided into two categories, namely: one is the proposed budget; the second is the budget. Estimates have feasibility study investment estimates and preliminary design estimates of two kinds, budget and construction design budget and construction budget.
Expanded
There are many ways to audit the project budget including comparative audit, comprehensive audit, spot check audit, etc., in the actual audit work, according to the specific circumstances of the project audit, audit is based on the extent of the size of the degree of the construction scale, construction of the coefficient of difficulty, responsible for the construction of the means and units and so on. Different audit programs audit methods are different, the final budget results and audit quality are also different.
Engineering budget preparation method, the preparation of the main two methods, respectively, is a comprehensive unit price billing method and material unit price method. Comprehensive unit price method is through a comprehensive project used up in a variety of costs, and comprehensive unit method can be divided into full cost comprehensive unit price and list of comprehensive unit price in detail; followed by material unit price method, this method of preparation and a great deal of convenience, can be well simplified to facilitate the preparation of the work, to facilitate the smooth progress of the economic analysis, even if the market price of the material is always changing, but also even if the development of the spread to solve the problem.