I. Bidding Conditions
The EPC general contract of Mazongshan Ski Resort Project has been filed in the Housing and Urban-Rural Development Bureau of Saihan District, Hohhot. The tenderee is Hohhot Metro Industry Co., Ltd. The source of funds required for the project is 65,438+000.00% of state-owned investment, 65,438+000.00% of self-raised investment, 0.00% of government investment and 0.00% of non-state-owned investment, and the planned investment of the project is 942,895,500 yuan. The project has met the bidding conditions and is now open for bidding.
Second, the project overview and bidding scope
(I) Project Name: EPC General Contract of Mazongshan Ski Resort Project
(2) Construction site: Hohhot-Saihan District-Yulin Town
(3) Contents of tender:
1, construction scale:
Mazongshan Ski Resort covers an area of 269.32 hectares, with a total snow-making area of 460,000 square meters (including 28,000 playing with snow). The total number of snow trails is 14, primary snow trails 1, intermediate snow trails 9, advanced snow trails 3 and snow trails 1. The total length is about 8.7 kilometers. The maximum passenger capacity is about 7700 people. The first snow trail: the planned snow-making area is 330,000 square meters, with a carrying capacity of 5,800 people. There are 1 first-class roads, 5 intermediate roads, 3 advanced roads, 1 snow circle roads, and an ice and snow amusement park. The transportation system plans to have three magic carpets and two cable cars. Leisure service supporting Phase I: Ski service hall with planned construction area of 6,600 square meters; Phase I infrastructure: reservoir 1 seat, with planned storage capacity of about 83,700 cubic meters, mechanical garage 1 seat, and construction area of 800 square meters; Pump house 1 seat, with a construction area of 600 square meters; Parking lot 1 car, covering an area of 28,000 square meters. Phase II Snow Trail: The planned snow-making area is 6.5438+0.3 million square meters, and the carrying capacity is 654.38+0.900 people. Plan 4 intermediate snow trails, traffic system planning 1 cable car. Leisure service in the second phase: ski service hall with planned construction area of 6000 square meters (permanent); Hotel with a building area of 22,000 square meters+Youth Travel+Research Institute; Construction area 1000 square meter service package; B&B with a building area of 1.3 million square meters. Phase II infrastructure: reservoir 1 seat, with planned storage capacity of about10.5 million cubic meters; Staff dormitory 1 building, with a building area of 4000 square meters.
The cost of construction, installation and equipment procurement in the feasibility study report of this project evaluation is 942,895,500 yuan; In which 1 period is 420,796,700 yuan; The second phase is 522,098,800 yuan.
2. Service content:
This tender is EPC general contracting, and the project contracting scope covers the design, equipment procurement, installation and construction of the first and second phases of the ski resort, including but not limited to the following contents:
(1) design phase tasks
The service scope covers all the planning and design work of Mazongshan Ski Resort Project. Including but not limited to the overall planning and design, regulatory detailed planning (municipal planning) design, overall design and general contracting management of Mazongshan ski resort; Conceptual planning and design scheme of ski resort, preliminary design of each major, construction drawing design and change design.
1. 1 mazongshan ski resort project general layout design, civil engineering and decoration, ropeway system, equipment system and its installation, foundation treatment design, slope support design, landscape design, professional design of architecture, structure, water supply and drainage, heating and ventilation, dynamic lighting and weak current, indoor fine decoration design, guiding sign design and BIM design of all building structures within the project scope.
1.2 Design of flood control and drainage channels, funa and water intake works (including water intake points, pump houses and related buildings, water supply pipelines, reservoirs, etc.). ), joint exploration and exploitation design of domestic drinking water (including design of water supply pipelines such as water intake wells and pump houses and related buildings, water supply pipelines crossing special highway lines for coal transportation, and special design of natural gas in the west).
1.3 external power supply introduction project of mazongshan ski resort project and design work of ski resort area 10kV high-voltage power supply project.
(2) Tasks in the construction stage
Phase I: Ski track project (earthwork excavation, slope protection, drainage ditch, safety net); Water intake works (regulating gates, water intake pumping stations, water intake pipelines, reservoirs, etc.). ); Flood control canal project; Snow equipment hall (earthwork excavation, foundation treatment, main structure, decoration, kitchen equipment, etc.). ); Electromechanical system; Weak current system; Ticketing system; Guiding sign; Outdoor pavement hardening; Drinking water engineering (tube well construction, pipeline engineering, pumping station civil engineering and equipment procurement and installation, etc.). ); Parking lot (earthwork excavation and filling, paving, guiding signs, parking management system, etc.). ); Supporting works (mechanical garage, boiler room, booster pump station, start-stop station, sewage treatment facilities, garbage transfer station, gas storage station, cableway control room, platform and garage, etc.). ); Auxiliary works of the site (greening, lighting, billboards, rainwater and sewage systems, integrated pipelines, etc.); Power supply projects (temporary power consumption, external power supply introduction, on-site power distribution, etc.). ); Other earthwork (earthwork excavation and filling in areas such as commercial reserved land and gas storage stations, etc.). ); Cableway project (procurement, installation and foundation construction of ropeway equipment); On-site permanent road works; Snow making system (procurement and installation of pumping station, snow making pipeline and snow making machine, special power distribution); Magic carpet (magic carpet equipment procurement, installation and foundation construction); Operate supporting equipment and equipment.
Phase II: Ski track project (earthwork excavation, slope protection, drainage ditch, safety net); Reservoir expansion; Flood control canal project; Snow equipment hall (basic treatment, main structure, decoration, feng shui installation, kitchen equipment, etc.). ); Electromechanical system; Weak current system; Ticketing system; Guiding sign; Outdoor pavement hardening; Scientific research, dormitory, hotel, hotel renovation, night lighting, parking lot (earthwork excavation and filling, paving, guiding signs, parking management system, etc.). ); Supporting works (sewage treatment equipment, ropeway control room, station platform, garage, etc.). ); Auxiliary works of the site (greening, lighting, billboards, rainwater and sewage systems, integrated pipelines, etc.); Power items (external power expansion, internal power distribution, etc.). ); Cableway project (procurement, installation and foundation construction of ropeway equipment); On-site permanent road works; Snow making system (procurement and installation of water pump, snow making pipeline, snow making machine and special power distribution); Operate supporting equipment and equipment.