Flood prevention and flood control inspection notice

Flood prevention and flood control inspection of the notice sample (Selected 6)

In life, the contact and use of the notice more and more people, the higher unit to the lower unit of a certain work on the layout, requirements, opinions and so on often conveyed in the form of a notice. I believe that writing a notice is a headache for many people, the following is my collection of flood prevention and flood control inspection of the notice sample (selected 6), I hope to be able to help you.

Notice of Flood Prevention and Flood Control Inspection 1

The project supervision agencies and the Business Department:

According to the Shuozhou City Weather Station forecast, from July 22 to July 26, most of the city has rainfall, and locally there is heavy rainfall. In accordance with the requirements of the Municipal Construction Bureau, the project supervision agencies and the Ministry of Business should be combined with the actual situation of the site arrangements to supervise the construction unit to do a good job in the construction site safety and flood control work, the relevant matters are notified as follows:

First, the supervision of the construction unit to strictly implement the duty system, strengthen the emergency response preparedness, improve the emergency plan, the implementation of emergency supplies and equipment.

Second, for the deep foundation pit and high support touch and other dangerous sub-parts of the project to be checked one by one to ensure that the project does not have any accident.

Third, lightning grounding facilities in place.

Fourth, for lifting operations, work at height, edge work, earthwork should have sufficient safety facilities to ensure that the work, such as any safety and quality hazards, immediately stop, if necessary, require the suspension of work.

V. Check the construction site drainage facilities, equipment, personnel are properly arranged.

For the above points of each project supervision organization supervisory staff to implement immediately, and to ensure that twenty-four communication, to ensure the safety of life and property.

Flood prevention and flood control inspection notice 2

The construction project department:

According to the latest weather forecast issued by the Inner Mongolia Meteorological Bureau, the city area of heavy rain, heavy rainstorms will soon come, very easy to cause natural disasters, anti-Taiwan flood prevention notice. In order to ensure the absolute safety of my project manager's personnel and property, to ensure the safety and smooth progress of the project, so that the project smoothly through the flood season, the rainy season to minimize the impact on construction. According to the requirements of the higher authorities, the project manager is required to do a good job during the rainy season, flood control, flood control work to make specific arrangements for the layout:

a. Requirements for the project department to set up a flood control and flood control leading group, responsible for the organization of the flood control and flood control comprehensive work. Flood control leading group office in the project department of the Ministry of Safety, the Ministry of Safety is responsible for the collection of daily weather forecast information, and the weather forecast will notify the members of the flood control team. When the higher authorities concerned issued flood warning information, coordinate the relevant departments and units to do a good job of flood warning response work, the implementation of the higher leadership departments related to flood control emergency measures.

Second, highlight the key points, increase the efforts to eliminate dangerous situations. Requirements of the construction project department must attach great importance to strictly strengthen the preventive work, we must quickly on the disaster prone points one by one, the site construction site to map out the situation, have a focus on de-risking, de-risking work. To focus on:

1, large machinery and equipment parking location to be reinforced;

2, the site of the drainage system dredging;

3, the site of the material, temporary electricity to be covered and so on.

Third, strengthen the responsibility, adhere to the duty inspection system. The project department flood leading group to strictly implement the day and night duty system, during the rainy season flood season to adhere to the 24-hour site inspection duty system, the team members should stick to their posts, shall not leave their posts without authorization, at any time to maintain a state of vigilance, observation should be careful, especially on the dangerous sections to pay close attention to the discovery of possible dangers to be immediately reported to the project manager. For extreme weather changes, do a good job "before the rain, rain, rain," check the work, in the event of danger, quickly start the emergency plan, immediately organize rescue and relief, to prevent the expansion of the accident, minimize the loss, to ensure the personal safety of the personnel and the safety of property.

Fourth, the addition of flood control facilities, ready for flood emergency supplies. The project department should ensure that the flood control work smoothly under the premise of prevention, do prevention first, prepare sufficient flood control materials and equipment, to ensure that the timely supply of flood control materials in place, the flood control of all personnel to carry out flood safety education, so that it recognizes the importance of flood control and flood prevention and the hazards of the work.

I hope that the construction project department to receive this notice, immediately take action to do a good job of flood prevention, flood control work and put into practice.

Notice of flood prevention and flood control inspection 3

Each city (state) Agriculture (Agriculture and animal husbandry, animal husbandry, animal husbandry) Bureau (Committee):

Since the flood, many places in our province have occurred in varying degrees of flooding, especially in mountainous areas around the basin, earthquake-affected areas are prone to secondary disasters. 24, Aba Prefecture, Maoshan County, folding the town of Xinmao village of the sudden collapse of a mountain high level, flood mitigation to all parts of the work of the alarm bells. Alarm bells. In this regard, the party group of the Office attaches great importance to all places to pay close attention to the rain, flood, disaster and people's situation, and do a good job in a timely manner in disaster prevention and relief and disaster reporting. Now on the relevant matters are notified as follows:

First, the full implementation of flood control and disaster mitigation responsibilities

Each city (state) agricultural departments should attach great importance to the flood control and disaster mitigation work to re-deploy and then implement the responsibility of the implementation of the layers. To check again the implementation of flood control and drought responsibilities, emergency plan development and emergency measures to prepare, to ensure that all disaster prevention measures in place. To further mobilize the mobilization, strengthen the emergency duty, in the event of a disaster, to be the first time to carry out disaster relief work.

Two, stepped up to carry out flood guidance services

To guide the flood-prone areas to do a good job of planting structure adjustment, the implementation of disaster prevention and mitigation technology measures; stepped up the inspection of facilities agriculture, livestock and poultry sheds to check and repair once again to ensure that the rain of the farm, the sewage drainage line smooth, to guide the scale of the farms to deal with manure in a timely manner to avoid the spread of pollution; to guide the localities to deal with feces, to avoid the spread of pollution, and to avoid the spread of the feces, to avoid the spread of the feces. The company's main goal is to provide the best possible service to its customers, and to provide the best possible service to its customers in the future.

Three, strengthen the disaster information scheduling and reporting

Strengthen the coordination with the meteorological department, forwarding meteorological warning information, do a good job of prevention. Adhere to the combination of daily scheduling and emergency scheduling, and actively do a good job of early warning and emergency response, in accordance with the requirements of the "Natural Disasters Express" and the provisions of the statute of limitations, content and other norms, the collection and organization of the disaster information, so that before the disaster there is a pre-disaster, the first time after the disaster there is a response to the end of the production of the disaster relief has been summed up. Strengthen the communication with the local defense finger, emergency, disaster reduction and other departments, the implementation of departmental linkage and regional collaboration mechanism, adhere to the unified leadership, and grasp the joint consultation, information **** enjoy the work.

Fourth, make every effort to do a good job of agricultural production recovery

Effectively strengthen the prevention and control of animal diseases, do a good job of immunization and disinfection and harmless treatment of dead animals and poultry, and timely disposal of outbreaks of epidemics, and at the same time, to strengthen the circulation of quarantine supervision, to prevent the inflow of sick and dead animals and poultry into the market. Actively coordinate with the relevant departments to ensure the smooth transfer of agricultural materials and transportation of agricultural products. Actively coordinate with the agricultural insurance sector, as soon as possible to verify the damage, the implementation of insurance compensation. Organize and mobilize the masses to do a good job of production self-help, minimize disaster losses, and help restore and rebuild.

Please cities (states) according to the requirements of the annex, the summary report since June flood disaster occurred, the disaster report must contain the process of disaster, disaster damage, production self-help measures taken and difficulties, on June 26 (Monday) 12:00 am before the report to the contact person mailbox (disaster report and form, can be attached 1-2 photos).

Notice of Flood Prevention and Flood Control Inspection4

All sub-branches, project managers, the company's departments and offices:

The recent persistent widespread rainfall weather triggered a number of floods, mudslides and other natural disasters, a serious threat to the construction site of the project, the safety of personnel and equipment.July 4, due to heavy rainfall caused landslides caused by the Xiluodu Hydropower Station Leibo reservoir area road reconstruction project construction three Bidding Section Project one person died. In order to put an end to such safety accidents, to protect the safety of people and property, now on the strengthening of the construction site flood prevention and flood control safety work notice as follows:

First, strengthen the leadership, strengthen the awareness of preventive measures.

Each sub-branch, the project manager of the construction department responsible for (project manager), the chief engineer and the security department must attach great importance to flood prevention, flood control, safety work. To firmly establish the idea of preparedness, timely study and solve the project, the region's flood prevention and flood control work problems, targeted to improve the flood prevention and flood control system, the establishment of an inspection mechanism for the tunnel mouth, high roadbed slopes, high and deep road graben, half-filled and half-dug embankments, deep foundation pits, bridges near the water area equipment, materials, warehouses, construction sites and other key sectors, key parts of the key inspection, the drainage is not smooth, Hidden dangers such as changes in the mountain, protrusions, loose rocks, etc. should be arranged immediately to detect and remove hidden dangers in time. To carry out flood control and flood emergency rescue drills and publicity and education work, strengthen the staff awareness of production safety, to ensure that the flood control and flood prevention measures to the implementation of the solid work of flood control, flood control and safety.

Second, sound institutions, the implementation of flood control responsibilities.

The company set up a "Road Tunnel Group Engineering Co., Ltd. flood control, flood safety leading group", by the executive vice president Jiang Wanguang is the leader of the administrative department manager ZengMinYing, operation and development manager LiXiaoBin, financial assets manager ZhuLing, engineering ChenXiHan for the members, set up an office in the Project Management (Engineering) Department. Chen Xihan is responsible for the daily work.

The subsidiaries, project managers must establish a leading group for flood prevention and flood control work, with the main person in charge of the project as the leader, the chief engineer, the person in charge of production as the deputy leader, the head of each department and the head of the team as members. The main responsibilities are: to understand the weather forecast, take effective measures to deal with floods, geological disasters; develop flood control and flood management system and emergency rescue plan, in the event of disaster organization, implementation of rescue, disaster relief, and quickly report to the head office and local government.

Third, to eliminate hidden dangers, the establishment of emergency mechanisms:

The construction sector should be in strict accordance with the "Construction Law", "Building Construction Safety Inspection Standards" and other laws and regulations and standards and norms of the 's requirements, according to the weather and climate change, and reasonable arrangements for the construction progress and process, to ensure that the construction safety. Supervision and inspection of major, major and general sources of danger within the jurisdiction, especially the explosives depot, oil depot, work at height, high slopes, deep foundation pits and other major sources of danger to strengthen the monitoring and observation, the strict implementation of the special program and operating procedures, if necessary, to send a person on duty, the establishment of a perfect record of observation of the sources of danger, to prevent injuries from explosions, fires, falls from height, burial, object strikes and other injuries. Conduct hidden danger investigation on temporary power lines, mixing stations, prefabrication yards, steel processing yards, lifting operations and other large sources of danger to prevent lightning, electrocution and other injuries, and find hidden dangers should be supervised and thoroughly rectified, leaving no dead ends. Operators and mechanical equipment, transportation equipment and other general sources of risk to strengthen management, improve personnel and equipment management system, is strictly prohibited to go down to the river to bathe, laundry, play and engage in other operations to prevent drowning, property damage and other injuries.

Fourth, the establishment of emergency rescue mechanism, to deal with emergencies:

The sub-branches, project managers flood control work leading group should be set up to flood emergency rescue mechanism, develop and improve the flood emergency rescue plan. To regularly carry out planning seminars, revisions, drills and professional training for emergency personnel; the implementation of rescue teams and materials, such as sacks, shovels, life jackets, lifebuoys, safety ropes, safety belts, etc.; should be guaranteed at all times to ensure the smooth flow of information to improve the ability to combat, once the danger can be quickly rushed to the scene in the shortest possible time, the scientific organization of the rescue to prevent the effective rescue in a timely manner, infallible.

V. Coordination and communication to ensure safe production:

Before the flood season, each branch, the project manager should strengthen the coordination and communication with the government, the owner, the supervision department, obedience to the management, unified command; keep in touch with the local firefighting, public security, medical, meteorological and other departments and the implementation of a person responsible for contact and communication, to ensure that The rescue and relief work is accurate, timely and smooth, strengthen the site safety management, to prevent the occurrence of nuisance disasters.

Notice of Flood Control Inspection 5

All units, the entire field of cadres and workers and their families:

The rainy season is approaching, in order to effectively do a good job of flood control and prevention of geologic hazards, maintenance and protection of the field of people's lives and properties, combined with the actual situation of the field, the experimental field to formulate the "Teaching Experimental Field of the China Agricultural University 20xx Flood Control Work Preliminary Plan," is now issued the pre-prepared plan, please Please follow the implementation.

After receiving this notice, all units must seriously grasp the flood safety hazards of mapping and rectification; improve all types of flood control plans and work programs; do a good job of key areas of geological disaster defense; do a good job of the family area, especially the bungalow population living in the area of the key parts of the precautionary measures; do a good job of the reserves of emergency supplies and emergency team construction work, to further enhance the flood control emergency response capacity; once found The first step is to make sure that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation, and that you have a good understanding of the situation.

All cadres, workers and their families in the rainy season, it is recommended to minimize the outing, and actively take protective measures to ensure the daily production, life and personal travel safety; pay attention to slippery roads, to ensure traffic safety; living in the bungalows of the workers and their families to do a good job of housing safety precautions; travel in the event of thunderstorms pay attention to the lightning lightning protection against electricity; go out and pay attention to the feet, found that the rain hit the swirl of the place, please take a detour; the rain is not a good idea. place, please take a detour; try not to get close to the street lamp poles, to prevent leakage, electrocution accidents.

Flood prevention and flood control inspection notice 6

Companies, departments and offices:

20xx flood season has arrived, in order to ensure that the group's mining enterprises, ground enterprises and other units of the safety of the flood, by the group leadership research, is now on the group's 20xx flood safety work arrangements and deployment are as follows:

First, set up a leading group of flood prevention and flood control. Each unit hand for the first responsible person, must attach great importance to the flood control work, the formation of flood rescue commando, must be a sound organization, responsibilities, tasks clear, command and order. The key positions of the duty officer's phone to stay open 24 hours, pay attention to watch the weather forecast, found problems reported in a timely manner, and properly dealt with, especially in the presence of gusty winds, heavy rain, high temperatures and other unusual weather, can do a good job of preventing and combating disasters, to ensure that the Group's safe flooding.

Second, the development of emergency plans for flood control. Each unit should be based on the previous year's water conditions and flood control experience, combined with the actual production this year, the development of 20xx flood emergency plan, the careful deployment of the work of the flood season, to do early planning, early arrangements, early preparation, to ensure that nothing goes wrong.

Third, the implementation of flood control materials. All units should be prepared to wire, woven bags, shovels, pouting, raincoats, rain shoes, flashlights and other materials, so as to be prepared.

;