? Engineer is a profession that relies on skill and has always been highly respected. Due to the requirement of professionalism and proficiency in their profession, freshers are required to start as encouragement engineers. Writing an excellent job summary can help you a lot. Here are six engineering assistant engineer job summaries for you to help you. More engineering assistant engineer job summary please pay attention to the engineer job summary column!
Engineering Assistant Engineer work summary of aTurn of the moment I to the unit has been working for two years, this is an important part of my life journey. Looking back on the past two years, experienced from a fresh university graduate students, to step into the society of the staff of this environment and role change and adaptation, to thank the leadership and colleagues of my training and care. In the leadership of the care, in the help of colleagues, through their own efforts, in all aspects have made some progress, better to complete their own work. Now the thought, work situation is briefly summarized.
A , constantly strengthen the study, and further improve their overall quality. In the past two years, we have carefully studied Hu Jintao's speech at the Deng Xiaoping birth centenary conference, Hu Jintao's important speech on July 1, the Fourth Plenary Session of the Sixteenth Central Committee on the strengthening of the party's governing capacity decision, etc., to further improve their own theoretical level and political quality, to ensure that their ideological consistency with the party and thorough action to the party comrades.
Second, to do their best, better fulfill their job responsibilities. Everything to work first, obey the leadership arrangements, and strive to familiarize themselves with the work environment and content in as short a period of time as possible, and conscientiously complete each task assigned by the leadership; their own work is not a very long time, their own quality and level of business from the actual requirements of the work there is still a big gap, but I was able to overcome the difficulties, and strive to learn, correct attitude, and actively to other comrades to teach and learn, can be practical, conscientious, and the actual requirements of the work. And learning, can be down-to-earth, conscientiously do their jobs, adhere to the theory and practice, learning to use. Not only to be able to work buried head to forget to work, but also to be able to go back to the time, every detail of the work of checking and checking, the work of the experience to summarize and analyze, always put the interests of the company in the first place.
In these two years of work in contact with many new things, many new problems, but also learned a lot of new knowledge, new experience, so that their ideological understanding and working ability to have a new improvement and further improve, but there are still certain problems and shortcomings. First, the work of the initiative to the leadership to report to the more, for the leadership to pay attention to think of ways less. Secondly, the professional knowledge is not detailed enough, not real enough, not enough, not enough to master, so that the work is passive. Third, to deal with some working relationships can not be handy. In the future work, to further enhance, and strive to improve their own quality, timely correction and make up for their own shortcomings and defects, better adapted to the needs of the work.
Engineering Assistant Engineer work summary of the secondChi-gap flow of years, as a flash star frost change. Stepped into the design institute has been more than a year, more than a year of work, I have just stepped into the workplace of the freshness, but also feel the designer's hard work and labor. In the first half of the year, I tried my best to adapt to the new working environment, and in the second half of the year, I focused on cultivating my own good study habits and serious and practical attitude towards learning, and made unremitting efforts for the first time to be employed as an assistant engineer. Under the enthusiastic support and help of the leaders and the old boss, I seriously do a good job in the design work, and actively complete the tasks assigned by the Institute. I have a lot of thoughts and feelings about their own business and design work, now will be more than a year's work to do a brief report:
One, political thinking:
In this more than a year's design work, I y appreciate the engineer's work of the trivial and heavy, from the design of the program to the completion of the acceptance of the completion of each link can not be I can't slack off in every aspect. In the design process, I continue to learn and reflect, progress in learning, growth in reflection, so that I can become a good engineer one day in the future. Design purpose is clear, attitude is correct, study the business, diligent and hardworking. Passionate about his career, solidarity with colleagues, open-mindedness to seek advice, and abide by labor discipline. Participated in the Wenchuan Earthquake Relief Donation Activity to enhance the collectivism of the whole hospital staff. Strengthen the cultivation and improvement of their own quality, starting from themselves. The specificity of the profession of engineers determines the inevitability of our people-oriented, safety first.
Second, the business ability:
Between work, through the talk and exchange with several old engineers, in a relatively short period of time on the architectural design and structural design has a preliminary understanding, and secondly, in the old master of the leadership of the new version of the specification, we studied 08, and at the same time, also to us for the design of the method of guidance and Security awareness of psychological counseling for some fresh graduates due to the design of only subsidiary classes of buildings and produce inferiority complex, worry, disappointment and other psychological guidance, stimulate our self-confidence, cultivate our design enthusiasm and initiative.
I feel y: the director inspired my sense of ownership, and gradually cultivated my ability to boldly take responsibility for the project, so that we, a group of fresh graduates enhance the sense of responsibility for the work of the Institute and take the initiative to participate in the management of the awareness of the formation of a unity, willingness to work, the work of the design team responsible for driving the members of the Institute of the **** with the progress. In addition, the director also taught us, in the process of dealing with the A party to ? Words must be behavior, behavior must be fruitful? , people-oriented, integrity first.
In 2008, the new version of the norms under the tide of reform, I and all engineers together into the new version of the norms of the wave of learning. Since the implementation of the new specification, the old masters in the process of reviewing the drawings, and actively cultivate our ability to independent learning, the spirit of scientific inquiry, no longer will be the design specification filler taught to us, but to let us through the way of independent inquiry to raise questions, analyze the problem, find out the problem, solve the problem, draw conclusions, validate the conclusions, and apply the conclusions to solve the problem. Focusing on process cultivation and summarizing key points in reviewing drawings has improved our interest in learning and cultivated our creative spirit. Serious design, and humbly seek advice.
As a young designer, in order to improve their own design level, I insisted on often looking at the architectural specifications atlas, often from the Internet to find some excellent architectural design drawings to study. Usually I seriously and humbly consult the experienced boss, learn from their experience and the kind of serious and responsible attitude to the project, and constantly improve their own design level, to understand the design art. Lu Xun said: ? A thousand readers have a thousand Hamlets. I have to say, a thousand designers, there will be a thousand design styles, each style, has its unique and charismatic glittering side, and I would like to be a hard-working bee, can learn from the best, and strive to design excellent works!
Three, work performance:
In Jingzhou Jingzhou Architectural Design Institute's works:
Jingzhou City Inspection Yuan facade renovation program, Qu Yuan Road and South Ring Road facade renovation program, Jingzhou City Senmao Forestry Co., Ltd. office building program, Jingzhou City detachment of the Armed Police City Squadron two squadron facade renovation program, Chen Kun, a private house programs Ltd, Jingzhou Leprosy Hospital Medical Office Building, Jingzhou Tobacco Monopoly Bureau Cafeteria Building, Jingzhou Genesis Transgenic Technology Ltd, Jingzhou Genesis Transgenic Technology Ltd, Jingzhou Genesis Transgenic Technology Ltd, Jingzhou Genesis Transgenic Technology Ltd, Jingzhou Genesis Transgenic Technology Ltd, Jingzhou Highway Hotel Elevator Renovation Building, Hau Zuoming Private House, Jingjian Garage Architecture, Liu Qingde private house program, Jingzhou City Funeral Hall gate plaque building structure, Jingzhou City, Taihu Lake private house building, Jingzhou City, Yingnan Village relocation of residents in the residential area of the private house program, Zhang Liuzhu private house program?
In Xiangfan City, the second architectural design institute works:
Longzhong Management Committee Guangde Temple two bridges (vehicular bridges, pedestrian bridges) building structure, Xiangfan Children's Welfare Institute planning program (revised part), Xiangfan First People's Hospital old inpatient surgical building renovation program (structural reinforcement of the construction drawings, the pump room building structure), Zaoyang Wudian Erlang Industrial Park (cleanup and polishing workshop, Material storehouse, finished product storehouse, casting workshop) building construction plan and gate enclosure wall accessory building structure, Xiangcheng District Shengli Street China Railway Bureau Residential Area Planning Program, Xiangfan Wanzhou Electric Group Co. Staff building structure, Xiangfan City Taipingdian financial building structure part, Xiangfan City, the new street commercial and residential building construction program part, Xiangfan College Academic Exchange Center Longzhong Hotel gate building structure, Xiangfan City, JiuFeng real estate high-rise commercial and residential building construction program part, Xiangfan City, the Mengda Decoration Company, the business building construction program part?
This year in the leadership and colleagues of the attentive care and guidance, through my own learning and study, the theoretical knowledge learned from books against the actual work, with theoretical knowledge to deepen the understanding of the actual work, with the actual verification of the theoretical knowledge learned, and strive to quickly accumulate design experience, so that they are faster and better into the work.
Fourth, the direction of future efforts:
① Improve their own design level, listen more, think more, do more, more exchanges, and continue to work hard.
② often learn from the old engineers, can learn more knowledge in the master, to be able to stand alone;
③ often look at the specification of the atlas, in practice, constantly enrich their own experience and skills.
④ Improve your design quality and professional ethics.
⑤ Active efforts to prepare for the examination: registered structural engineers, second level registered construction engineers, first level construction engineers, registered cost engineers, registered supervision engineers, focusing on the first three. In the future, I will further strengthen technical learning, work solidly, give full play to my personal strengths, and make more contributions to the institution. Design experience is a little by little accumulation. Progressing a little bit every day is a process of continuous improvement. There is no best, only better. If you want to go faster, you can't go faster. You must make step-by-step progress and continuous improvement.
Design work, is a constant new, never-ending work. A spring, an autumn, let me put a design ambition into a fire for the cause of construction, the most precious love of their own dedication to the structural design of the building, I believe that today I have a bud in my heart, tomorrow will be able to bloom gorgeous flowers.
This year, is my rapid growth with sweat for a full year. But this is just a beginning,? The road is long and far away, I will seek up and down?
Summary of the work of the Assistant Engineer Engineering IIITime flies, since June 20XX graduated from Hebei University of Science and Technology so far has been more than a year, my major is the process equipment and control engineering (formerly chemical machinery) professional. In this more than a year's work, for a college student out of school soon, a lot of harvest, not only to get the school's theoretical knowledge and practical combination of learning opportunities, but also to make me just enter the community to engage in professional skills work more rigorous.
I came to XX company in November 20XX, with a sense of affinity for machinery and equipment, in the company's colleagues to support the help and close cooperation, I here to further deepen the understanding of mechanical equipment. With the deepening of the degree of understanding of the production equipment, while the company plans to carry out the transformation of the current production line, in the process of transformation by the trust and cultivation of the leadership of the plant, I gradually embarked on practical work, from the production line of simple parts of the production line equipment to the installation of equipment in accordance with the equipment drawings, the whole process allows me to realize that only the theory is implemented into practice, to be able to understand the structure and operation of the equipment thoroughly. The whole process made me realize that only by putting theory into practice can I thoroughly understand the structure and operation of the equipment. After a period of practice exercise my professional skills have been recognized by the leadership of the plant, I began to participate in some of the equipment transformation, which is also my own in-depth learning stage, so that I y realize the importance of science, rigorous work attitude.
At the end of 20XX, the transformation of the production line is almost over, the company leadership initiative to build two new production lines, I was assigned by the factory, into the construction of the new production line, which has never been in contact with the overall construction of the construction of the project is a challenge to me is also to make me get exercise to improve the opportunity. I strictly in accordance with the production line drawings of the construction process to monitor, record and do a good job of coordinating the work, and constantly to the various projects to learn from the professionals, the production line construction materials, scientific quantities, rational planning of piping layout, and now the production line has begun to plan for the installation of equipment, I believe that in the completion of the production line construction, I will be synchronized with the enhancement of the harvest.
Here more than a year of work, very grateful to the company and the leadership of the plant to provide me with a lot of learning, exercise platform, but at present I still have a lot of shortcomings, need to learn a lot of places, I will continue to hone their own practice, and further deepen the learning of professional skills.
Summary of the work of the assistant engineer engineering fourIn June 20XX, I graduated from a university material molding and control engineering, after graduation, I went to work for the company, since joining the work, I have been strict requirements for their own work, and strive to improve their own ability, for the work I just participated in the I am aware of the lack of their own experience, in order to strengthen the skills and knowledge of the learning, and to do a good job in this job. I have just joined the work, I am aware of my lack of experience, in order to strengthen the skills and knowledge of learning at the same time, down-to-earth and do a good job, to guard against arrogance, and strive to master more knowledge earlier, as well as in their own workplaces to achieve excellent results. Only in this way can I make myself a competent and insider on the work, can actually do the work for the craft service, for the company's stable and continuous production to ensure that the better service to the company, the following is my more than a year since the work of a brief summary:
First, pay attention to their own cultivation, and to strengthen the political ideology and moral qualities.
First, adhere to the serious study of Marxism-Leninism, Mao Zedong Thought, Deng Xiaoping Theory and ? Three Represents? and other important ideas, adhere to the seeking truth from facts, and constantly improve their political and ideological awareness and level, and constantly explore and pursue; secondly, in the ideological positive demand for progress, keep up with the pace of the times, to understand the latest developments in society, and strive to improve their own political theory and cultivation. In the work of hard-working, proactive, down-to-earth style, not shirking responsibilities, and seek efficiency. Attention to investigation and research in the work, diligent thinking, clear thinking, in the face of right and wrong and principles to do unambiguous. Have a strong sense of the overall situation and organizational concepts, thinking and action with the Central Committee of the Party always keep the same.
Second, learn professional knowledge, improve job skills.
At the beginning of the work, I found that the professional knowledge learned in the school with the actual work is very different and the gap, in order to change the role as soon as possible, to adapt to the requirements of the work, I strive to learn professional knowledge, and strive to improve their job skills, and seriously study the unit's rules and regulations, and bear in mind, and always remind themselves to strictly abide by.
Whether at work or in life, I have always believed that a ploughing, a harvest, so I have been working hard, constantly trying to learn, constantly working hard, work commitment, on-time attendance, effective use of working time, and stick to the post. Today's society is in the stage of rapid development, in order to stand in today's society, to adapt to the needs of the times, only to continue to learn, constantly update their knowledge, while strengthening the theoretical learning, especially on the new technologies, new theories, and constantly realistic and innovative, in the actual work of the exercise and growth, accumulation of work experience, develop work capacity, and strive for greater achievements. In the usual process of getting along with everyone, see everyone's rigorous and serious attitude towards work, but also appreciate the power of the team, a person can only integrate into the group in order to play to the extreme.
Work, pay attention to details, seize the key, which is the core of technical work. For welding work, I am well aware that the weld is directly related to the quality of the product, a little defect will cause huge problems, as small as a porosity, even a crack, will have serious consequences for the safety, in this regard, I am strict with myself, first of all, start from the process, in strict accordance with the national norms and standards, and strive to learn new knowledge and new concepts, and do a good job in their own field and their own work, on the one hand. On the one hand, to strengthen the knowledge and ability to enhance, so as to be able to take on more responsibility and work, on the other hand, to strengthen and other areas of coordination, improve work efficiency, to ensure the quality of work, and constantly summarize, look for gaps, and constantly improve, and strive to innovate.
Three, find their own position, do their own work.
Through this more than a year of work, study. I think in the mind, the first is the mind, followed by the ability. Attitude determines everything, ability can be cultivated. I have always believed that work should not be a task or a burden, it should be a kind of fun, a kind of enjoyment, and only if you are interested in it, thoroughly in love with it, you can fully appreciate the joy of it. I love my work and will do my best for it without reservation. It can be said, know how to enjoy the work, you know how to succeed, during the period to come not a little reluctance.
Since joining the work, I am mainly engaged in the preparation of welding process, involving boilers, containers and nuclear power products such as the preparation of welding process, welding process testing, assessment and related WPS, PQR and other technical documents preparation work, as the saying goes: ? As the saying goes: "A skillful woman can't cook without rice". As the saying goes: "A clever woman can't cook without rice", a quality qualified product must have good technical support for the company's existing welding equipment, pipe tube plate welding machine, with pole surfacing welding machine, narrow gap submerged arc welding machine and saddle automatic welding machine, etc., based on the product drawings, select the optimal welding process. In the preparation process, through the learning and summarizing, learning and digesting, from the internal structure of the product to the overall assembly, from the process of blind spots to the technical processing, from the pot to the high plus and then to the nuclear power products, I am well aware of the lack of knowledge, for this reason in the ordinary life of my special to strengthen the standards and technical difficulties in dealing with the method of learning, but also pay special attention to masters and colleagues to listen to more ideas and suggestions.
Four, summarize and improve, and constantly improve themselves.
In the past work, in the leadership of the care and support of colleagues and help, after continuous efforts, I adapt to the rhythm of work, with a certain degree of technical work ability, but there are still many shortcomings, in the future work of their own to strengthen the learning, to overcome the shortcomings, and strive for their own professional and technical level can be constantly improved. Through specific participation in the work so that I have a deeper understanding of the technical work, rigorous, pragmatic, can not afford to be sloppy so that I realize that this is the most basic requirements of technical work. Theory comes from practice, and theory guides practice. In the future work and study, I will put the interests of the company and the quality of the product in the first place, by summarizing the study, learning and understanding of advanced welding technology at home and abroad, through the reduction of costs and efficiency, and more to learn from the same industry in the excellent ideas and technology, followed by frequent service to the workshop site, through the actual problem, to ensure the quality of the product, and to improve the company's overall competitiveness.
? Dedication to the soul? is the truth of my life to be practiced, ? To build products with character? is the direction of my future progress, to find their own position, physically, starting from themselves. Only their own heart to dig, brave to try, through continuous summarization, digestion and absorption, to be able to accumulate more knowledge and experience for their own better work, in the future work, take the long and make up for the shortcomings, and strive to open up their own horizons, to enhance the quality of their overall ability to overcome their own shortcomings, and strive to become a learning, innovative, professional talents, and strive to have a better job in their own positions.
Engineering Assistant Engineer Work Summary Part VTime flies, from graduation to work to now immediately after a year's time. In this nearly a year of work in the process I not only deepen the understanding of the original knowledge of learning, but also on the previous books did not touch or contact not deep knowledge has a further understanding. Since the work, in the unit under the careful cultivation and teaching of the leadership, through their own continuous efforts, both in thought, learning or work, have made great progress and great gains, is summarized as follows:
First, the ideological , adhere to the serious study of Marxism-Leninism, Mao Zedong Thought, Deng Xiaoping Theory and ? Three Represents? Important Thought, adhere to seek truth from facts, and constantly improve their political and ideological awareness and level, and constantly explore and pursue.
Second, learning , since joining the work I have been strict with themselves, take their work seriously, their own very good for their own position, although came to Xinjiang this piece of work far away from home, the conditions are very difficult, but for our young people, is not lost as an exercise in self-experimentation, the challenge of self-opportunity. Theory from life above life should be restored back to life, in such a place as Xinjiang, there are many good things worth discovering, it is worthwhile for us to study the place. I always keep in mind that I have to work in the work of continuous learning, the theory and practical work well combined together. In the work of the continuous change of self, timely and different requirements for themselves, in the work of the continuous summary of experience, to enhance their ability to work at the same time, in the work of the continuous learning, but also in the work of the gradual growth.
Three, the work , the first task after arriving in Xinjiang is to be arranged to the site of the aggregate work area, follow the site of the staff to work together, and then it was arranged to the electrician class to follow the exercise. During this period has been conscientious with the site of the master electrician work, listen to the master electrician's arrangements, very good to help the master electrician to complete the work of the task at the same time, I was also formally arranged to the aggregate area as a technician. In order to be able to enter the shortest possible time to the state of the technician so that in the future work can be better to complete the job, in the spare time to work around the collection of information, and in many ways to the seniors to inquire about the production of the aggregate area, the production operation, machinery and equipment.
From the beginning of the official notice to stay in the aggregate area as a technician, I know my own burden is very heavy, I always remember the words? To give others a bowl of water, you have to have a bucket of water? Because I know to become a qualified technician is not an easy thing, as a technician not only to be able to deal with the field office, but more importantly, to be able to solve the problems that arise on the scene, the scene of the operation and maintenance of machinery and equipment to do a good understanding. In order to improve production efficiency, we have to come to do a good job in the maintenance of machinery and equipment, and his premise is to deal with the problems of machinery and equipment in advance, to solve the problem in the absence of line. This requires the technician to be able to find the problem, so as to solve the problem in a timely manner, in order to achieve the maintenance of machinery and equipment does not affect the normal production tasks.
At present, my project department should be the owner's request and in my aggregate work area supplemented by a stone powder production section, is currently in the intense construction stage. As a direct participant in the production and operation of stone powder, we are actively preparing for the installation of stone powder equipment. As the technician of the section, I have the responsibility and obligation to make full preparation for the smooth installation of the equipment. In order to complete the installation and debugging of the equipment, I am actively working with the equipment supplier, in order to complete the task smoothly, quality and quantity. During the installation of the equipment, let me feel y, a set of production equipment can be successfully put into production in the link, it is necessary to do the preliminary work is how complex, I am fortunate to be able to participate in which is really my honor, during this period I paid a lot, but I also harvest a lot of, I enjoy it.
Through nearly a year of work time, I am more and more clear about the operation of the site, more and more familiar with the machinery and equipment, and colleagues are more and more close to the site, in the first half of the time has been gradually integrated with the aggregates area of the work of the Assistant Engineer Summary of the five. In addition to the construction of the artificial aggregate production link has an overall understanding of the understanding of this system at the same time, but also gradually improve their own understanding of this equipment and automatic control, in Xinjiang during this period of time my personal work ability has improved, which is inseparable from the leadership's concern and the help of colleagues around me, I will continue to work hard in the future, make persistent efforts. I will continue to work hard in the future, keep up the good work, strict requirements for themselves, and constantly realistic and innovative, and constantly refine themselves, do my best to do a good job, and strive to achieve greater results.
Engineering Assistant Engineer Work Summary Part VII joined the work in 1996, was engaged in meter calibration, electricity inspection and other work, is now the deputy director of the Department of Operations, responsible for line loss management, measurement management, electricity inspection and other work. In a few years of practical work, I am learning, hard work, book knowledge and practical work combined, the level of professional and technical level has improved significantly, now I will report on my personal work as follows:
First, to strengthen the management of standardized equipment, to ensure the accuracy of the transmission of the quantitative value. We often say that the measurement meter is the power enterprise business activities in the ? The first step is to make sure that you have the right balance of power. The standardized measuring equipment is calibrated to the standard of the power plant, which is the most important part of the power plant. The standardized measurement equipment is calibrated to the scale. The tool, the power enterprise has extraordinary importance. I **** have 19 sets of standard equipment, in order to ensure the stable and healthy operation of these devices, I presided over the establishment of a standard measurement equipment accounts, clear management, regular inspection, to avoid overdue service. The performance of the portable single-phase meter calibration station is not very stable, we are maintained by the manufacturer once a year, from time to time with other standards to do comparisons, problems solved in a timely manner, so as not to cause serious consequences. xx year, we **** sent 12 sets of standard equipment, due to the work in place, effective measures, sent to the inspection of the qualification rate of 100%, well received by the leadership of the Institute of Electricity and Research praise.
Two, good meter management, safeguard the legitimate rights and interests of both sides of the electricity supply and use. Through the business census, we established a meter account, the measurement of the meter into the standardized management. We have determined the meter calibration workflow, by specializing in the implementation of dynamic management of the account to ensure that the account is consistent with the actual. Meter in the calibration before checking the ledger, registration work records, calibration by the microcomputer automatically record the error information, calibration by specialists to change the meter ledger; if you need to change the meter will be issued by the "measuring device replacement record", and according to the actual situation issued by the "metering device back to fill the power report". The consequences of doing so, effectively curbing the individual through the meter to do articles, for personal gain of bad behavior. In order to ensure the quality of meter calibration, we implement the meter calibration life-long responsibility system, as long as the meter is determined to be man-made adjustments unqualified error, regardless of how long, should be held accountable for calibration of the responsibility of the person, will not be tolerated. xx year, we *** calibrated meter 4741, current transformer 4814, exceeding the planned task 56.7%, for the Bureau to reduce the loss of energy saving to provide technical support.
Three, pay close attention to bus balance management, eliminate the blind spot of line loss management.
In order to ensure the accuracy of the station metering device, xx July, we will station metering meter all replaced by multi-function electronic meter, and in accordance with the provisions of the metering regulations quarterly on-site calibration, to ensure that the meter stable operation. Through this work, the bus balance rate has been greatly reduced, and the balance rate of MiBei and BanDong stations has been reduced from more than 1.5% to less than 0.5%, which is particularly effective. In order to timely and accurately understand the balance of the station, we set up a special person every day are concerned about the balance of each station and weekly accounting, as long as a station is found for two consecutive days the balance rate of more than 0.5%, will immediately go to the scene to find out the reasons; the measurement of the station reported failures, we ensure that the personnel in place in 12 hours to solve the problem at the fastest possible speed. xx year, we **** change the table 46, the scene calibration 146 times, dealing with station metering faults 3, to ensure that the Bureau's annual bus balance rate within 0.5%. In order to complete the power supply pointer, to ensure economic benefits, the replacement of electronic meter work we set off in the early hours of the morning, try to work in the low period of electricity consumption, the first to open my bureau? Zero point project? The first of its kind.
Four, pay attention to site management, fully cooperate with the work of loss reduction. Every positioning or acceptance, I ask team members to be seriously responsible, not limited to making records, but to really participate in, the gatekeeper strict gatekeeper. xx September, in the four treasure leather plastic limited company 1000kva capacity increase project acceptance, we carefully check the wiring, found the manufacturer's measurement of the wiring error, prevented a serious measurement of the accident occurred. For other field work, whether it is electricity census, or focus on the investigation of certain lines, platforms, or the investigation of the load of the public distribution substation, I insist on seeking truth from facts, and strive to investigate the real first-hand information, to provide a reliable basis for the leadership of the decision-making. In addition, I will also be on-site investigation as their own in-depth grassroots, contact with the first line of a rare opportunity, through the site investigation, for the power supply comrades to solve practical problems, but also enrich their own experience, to supplement the lack of knowledge. xx year, we *** investigation line 30, 8 Taiwan, correcting the wrong wiring 11.
Fifth, optimize the reactive power configuration, to provide technical support for the loss reduction work. Reactive power management is an important part of line loss management, for reactive power management, I'm not satisfied with the power supply center to report a few tables, fill in a few figures, but wholeheartedly into this work. On the one hand, I went to Beisha, Dongyang and Dabu Village to correct the wiring of reactive power meters, help the power supply offices to measure the reactive power status of users, determine the reactive power compensation program for users, and inspect the effect of reactive power compensation; on the other hand, I consulted the relevant data and learned the latest developments of reactive power compensation, and constantly supplemented my own mind in order to seek a practicable working method for the work of reactive power compensation in my office. Through unremitting efforts, the power supply comrades and many users of the work of the understanding of the work continues to improve, last year **** increased the amount of reactive power compensation of nearly 10,000kvar.