Hemodialysis room building layout requirements
There must be three channels: patient channel (including elevator and safety channel), dirt channel (special recycling garbage and medical waste), clean channel (medical staff and goods channel). Sub-clean area, semi-contaminated area, contaminated area. According to the new sop, the treatment room is set in the clean area, and there must be a buffer room from the clean area to the contaminated area. Warehouses are divided into wet and dry, sterile and sterilized warehouses. Each area must have ventilation equipment and air sterilization equipment. The hemodialysis room must have a backup power supply. Reserve the water machine room, the water machine room area is 1.5 times the water treatment system