How to write the acceptance application report

Question 1: How to write an application for acceptance (Model application for acceptance of environmental protection for the completion of a construction project)

Letter on application for acceptance of environmental protection for the completion of the ××× construction project

××× Environmental Protection Bureau:

In accordance with the approval of your bureau

××× construction project

Environmental Impact

(report,

report, or environmental impact registration form (document number)). p>

Report

or Environmental Impact Registration Form (Document No.), the main project of the ×× project (project name) constructed by our organization at ××××× (location)

has been completed, and the main contents include:

......

, (state whether it is consistent with the EIA document and its approval). The main contents include:

, (state whether it is consistent with the EIA document and its approval), the pollution control facilities supporting the project have been completed,

and the pollution control and ecological protection measures have been implemented.

(and

agreed by your bureau to carry out trial production operation).

}

Report

{

Table

}

)

or fill out the construction completion of environmental protection acceptance application registration card. It is hereby submitted to your bureau for approval

of the environmental protection acceptance of the completion of the construction project.

Annexes

:

1

, construction project completion of environmental protection acceptance monitoring (investigation) report (table);

2

, construction project completion of environmental protection acceptance application report (table, registration card);

Question 2: How to write a report on the application for acceptance of the clinic I've seen this format. Probably means:

XXX Health Bureau: I have what nature of the clinic in what address a clinic, what is the size of the area, how big the scale, the structure of the practitioners (age, title, time of practice), in accordance with what standards, we clinic what transformation, is now complete, please leadership or what is responsible for acceptance of the work to guide.

Applicant:

Year Month

Question 3: How to write the content of the completion data of the project completion acceptance application report According to the "Chinese People's Republic of China" (Ministry of Construction) (Interim Provisions for the Acceptance of the Completion of Building Construction and Municipal Infrastructure Projects) the completion of the project acceptance should be carried out in accordance with the following procedures: (a) after the completion of the project, the construction unit to the construction unit to submit Project completion report, apply for project completion and acceptance. Supervision of the project, the project completion report shall be signed by the supervising engineer. (B) the construction unit receives the project completion report, the project meets the requirements for completion and acceptance, the organization of investigation, design, construction, supervision and other units and other relevant aspects of the experts to form an acceptance group, to develop acceptance programs. (C) The construction unit should be in the project completion and acceptance of seven working days before the acceptance of the time, place and acceptance of the acceptance of the group list notified in writing responsible for supervising the project quality supervision agencies. (D) the construction unit to organize the project completion and acceptance. 1. construction, survey, design, construction, supervision units to report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for engineering construction in all aspects of construction; 2. review of construction, survey, design, construction, supervision units of the project files; 3. field inspection of the quality of the project; 4. engineering survey, design, construction, quality of equipment installation and management of the links to make a comprehensive evaluation, the formation of the acceptance of the acceptance of the project. Make a comprehensive evaluation, the formation of the acceptance group signed by the project completion acceptance opinion. Participate in the construction, survey, design, construction, supervision and other parties involved in the acceptance of the completion of the project can not form a unanimous opinion, should be negotiated to put forward solutions, to be unanimous, and then re-organize the acceptance of the completion of the project. Article VII of the project completion inspection and acceptance, the construction unit shall promptly put forward the project completion acceptance report. Acceptance report on the completion of the project mainly includes an overview of the project, the construction unit to implement the basic construction procedures, engineering survey, design, construction, supervision and other aspects of the evaluation, project completion and acceptance of time, procedures, content and organization, project completion and acceptance of the views. Engineering completion acceptance report should also be accompanied by the following documents: (a) construction permit. (B) construction drawings and design documents review comments. (C) the provisions of Article 5 (b), (c), (d), (i), (j) the documents specified. (D) Acceptance of the project completion and acceptance opinions signed by the acceptance team. (E) municipal infrastructure projects should be accompanied by quality testing and functional test data. (F) The construction unit signed the project quality warranty. (VII) statutes, regulations and other relevant documents. Article VIII is responsible for supervising the project quality supervision agency shall be responsible for the completion of the project acceptance of the organization, acceptance procedures, implementation of acceptance criteria for on-site supervision, found to be in violation of the provisions of the quality management of construction projects, ordered to correct, and will be the completion of the project acceptance of the supervision of the project as an important part of the project quality supervision report. Article 9 The construction unit shall, within 15 days from the date of acceptance of the completion of the project, in accordance with the provisions of the "Interim Measures for the Administration of the Completion and Acceptance of Building Construction Projects and Municipal Infrastructure Projects", to the local people above the county level where the project is located *** construction administrative department for the record.

Question 4: How to write the review comments on the application form for the project completion acceptance report conforms to the design and specification requirements. Agree to acceptance

Question 5: How to write the hospital application acceptance report Write what you received (several copies), what unit to send, when received, call the delivery person to sign

Question 6: How to apply for environmental acceptance report? Give a format, don't let me go somewhere else under, don't form Hello, this construction project completion of environmental protection acceptance application to the right to approve your project EIA report submitted to the environmental protection department, in addition, the EIA law provides that the preparation of the EIA report of the project in the completion of the acceptance of the submission of the application report, acceptance of the monitoring (investigation) report; other preparation of the report form needs to be submitted to the application form and the monitoring (investigation) form; fill out the registration form to submit the acceptance of the registration card. Now give you the approximate format and content of the application report, the inadequacy of please add. During the construction process, the project strictly implements the requirements of EIA documents and EIA approvals, and implements the "three-simultaneous" system to ensure that environmental protection facilities are designed, constructed and put into operation at the same time as the project. The environmental protection facilities and pollutant emissions of the project have been monitored by XXXXXXXX Environmental Protection Monitoring Station in accordance with the relevant technical specifications, and all the indicators meet the emission standards. Environmental Monitoring Report File No.: XXXXXXXX

Through a period of trial operation, debugging a variety of equipment, is now running under stable conditions, environmental protection facilities are running well, the production load has reached the relevant requirements, the decision to formally put into production.

Now to your unit to carry out the construction project completion of environmental protection acceptance application, hope to be approved.

Application unit: XXXXXXXXXX (official seal)

Contact: XXX

X year X month X

Question 7: how to write a comprehensive acceptance of the real estate project application report (a) After the completion of the project, the construction unit to the construction unit to submit the project completion report to apply for the completion of the project acceptance. Supervision of the implementation of the project, the completion of the project report shall be signed by the superintendent engineer. (B) the construction unit to receive the project completion report, the project meets the requirements for completion and acceptance, the organization of investigation, design, construction, supervision and other units and other relevant aspects of the experts to form an acceptance group to develop acceptance program. (C) The construction unit should be in the project completion and acceptance of seven working days before the acceptance of the time, place and acceptance of the acceptance of the group list notified in writing responsible for supervising the project quality supervision agencies. (D) the construction unit to organize the project completion and acceptance. 1. construction, survey, design, construction, supervision units to report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for engineering construction in all aspects of construction; 2. review of construction, survey, design, construction, supervision units of the project files; 3. field inspection of the quality of the project; 4. engineering survey, design, construction, quality of equipment installation and management of the links to make a comprehensive evaluation, the formation of the acceptance of the acceptance of the project. Make a comprehensive evaluation, the formation of the acceptance group signed by the project completion acceptance opinion. Participate in the construction, survey, design, construction, supervision and other parties involved in the acceptance of the completion of the project can not form a unanimous opinion, should be negotiated to put forward solutions, to be unanimous, and then re-organize the acceptance of the completion of the project. Project completion inspection and acceptance, the construction unit shall promptly submit the project completion inspection report. Acceptance report on the completion of the project mainly includes an overview of the project, the construction unit to implement the basic construction procedures, engineering survey, design, construction, supervision and other aspects of the evaluation, project completion and acceptance of time, procedures, content and organization, project completion and acceptance of the views. Engineering completion acceptance report should also be accompanied by the following documents: (a) construction permit. (B) construction drawings and design documents review comments. (C) the provisions of Article 5 (b), (c), (d), (i), (j) the documents specified. (D) Acceptance of the project completion and acceptance opinions signed by the acceptance team. (E) municipal infrastructure projects should be accompanied by quality testing and functional test data. (F) The construction unit signed the project quality warranty. (G) regulations, rules and other relevant documents. The construction unit shall, within 15 days from the date of completion and acceptance of the project, in accordance with the "building construction and municipal infrastructure projects completion acceptance of the interim measures for the record management," the provisions of the project to the local people above the county level *** construction administrative department for the record

Question 8: How to write the application for the acceptance of the foundation? I have a foundation acceptance application report form here, if you need, you can give me an e-mail, I send you a reference, thank you.

Question 9: How to write an acceptance report! Acceptance report format

1, the basis for construction

Briefly explain the project feasibility study report approval or plan task book and approved units and approval number, approved construction investment and project estimates (including revised estimates), the construction scale and production capacity, the main contents of the construction project package agreement.

2, project overview

(1) the preliminary work and implementation of the project;

(2) design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units;

(3) each single. On behalf of, write, the start and completion date of the project;

(4) the completion of the workload and electrification: the youngest three two. Two order five three, five zero zero six formed production capacity (detailed description of the reasons for the construction period in advance or delayed and production capacity and the original plan of the reasons for the discrepancy between the original plan, as well as the construction of the countermeasures taken to ensure the implementation of the original plan).

3, the initial inspection and test run

The initial inspection time and the main conclusions of the initial inspection and test run (should be accompanied by the initial inspection report and test run of the main test indexes, test run time is generally 3-6 months).

4, the completion of the final account overview

Estimates (revised estimates), budget execution and preliminary final accounts, and investment analysis of communications construction projects.

5, the organization of engineering and technical files

The construction of the project in the major records, the completion of the project data, hidden works with the acceptance of the data, design documents and drawings, supervision documents, the main equipment and technical information and the construction of the project to and from the file of documents, etc. to organize the situation.

6, economic and technical analysis

(1) the main technical indicators of test values and conclusions;

(2) the analysis of project quality, the quality of construction accidents occurring in the treatment of the situation after the description;

(3) the analysis of the construction cost and the main economic indicators, as well as the use of new technologies, new equipment, new materials, new technologies to obtain the benefits of the investment;

(4) analysis of investment benefits, the formation of fixed assets as a proportion of investment, direct corporate income, analysis of the years of return on investment, break-even analysis.

7, the situation of preparatory work for commissioning

The organizational structure of the operation and management department, the production staffing situation. Training and the establishment of the operation of the rules and regulations of the situation.

8, the treatment of finishing works.

9, the preliminary views of the project put into operation.

10, engineering construction experience, lessons learned and suggestions for future work.