For the follow-up of foreign trade orders, does not belong to the three-phase inspection is

Tip check

1 ⒈ comprehensive preparation and understanding of the order information (customer orders, production processes, final confirmation of samples, fabric / accessory sample card, confirmation or correction information, special circumstances can carry customer samples), to confirm that all the information available between the production process details are uniform and exhaustive. The instructions are not clear matters reflected in detail to the relevant technical department and business department, in order to confirm in a timely manner.

Peake must ensure that the company and outside the processing plant between all the requirements and information detailed and clear, consistent! (It is better to have textual proof)

3. Know as much as possible in advance about the production and operation status of each processing plant, and fully assess the strengths/weaknesses of the factory, so as to achieve the root of the knowledge.

Sung Singing order taker's words and behavior, attitude are on behalf of the company, so with the business units to deal with the corresponding business process, we must grasp the basic principles, pay attention to the words and behavior of the appropriate manner, the attitude is not humble. Strictly prohibit any subjective or objective reasons for the customer (or the customer's company order followers) have excessive words and behavior. Handling the business process can not arbitrarily exceed the authority to take a position, there are problems in a timely manner to consult the company's decision.

Be careful to fully estimate the potential occurrence of problems in advance, accordingly strengthen the work, improve and refine the preliminary work to reduce or even eliminate the possibility of their occurrence. Not to find the problem for the purpose, in advance to fully prevent, repeat the work of discovery, timely handling of the problem and summarize the experience of the future work of the way and further improve the rules is the fundamental way.

6. Order followers and the person in charge of the order (operator) to maintain close contact, for the sake of the interests of both parties, more communication with each other, to minimize the problem.

Production inspection

⒈ fabric / accessories to the factory, urge the factory in the shortest possible time according to the delivery note detailed inventory, and signed by the factory. If there is a short code / less phenomenon to personally participate in the inventory and confirmation.

Peake, if the factory has not played samples in the early stage, must arrange for its speed to play the pre-production samples to confirm, and the test results will be notified in writing to the person in charge of the factory and the factory's technical section. Special circumstances must be handed over to the company or customer confirmation, rectification and error-free before production.

3. Proofreading of the factory cutting samples before its version of the length of the confirmation, detailed records of the confirmation of the single consumption by the factory manager to sign the confirmation, and notification of the opening of the cutting.

⒋根据双方确认后的单耗要与工厂***同核对面/辅料的溢缺值,并将具体数据以书面形式通知公司。 If there is a shortage of materials, the factory should be informed of the shortage of materials in a timely manner. If there is a surplus, we must inform the factory to return to our company after the end of the big goods, and urge them to use sparingly, to eliminate waste phenomenon.

Be careful with the initial production must be each workshop, each process of high standards for semi-finished product inspection, if there is a problem to reflect the factory in charge and the appropriate management personnel, and supervision, to assist the factory to implement the rectification.

Selection of the first piece of finished products from each workshop, to its size, workmanship, style, technology to carry out a comprehensive and detailed inspection. Issue an inspection report (large production of early/mid/late) and corrective comments, signed by the person in charge of the processing plant to confirm the factory to stay a copy of their own to keep a copy and fax the company.

Borrow every day to record, summarize the work, make tomorrow's work program. According to the big goods delivery schedule listed in advance production schedule, daily detailed records of the factory cutting progress, production progress, finished goods, the number of machines in production, and according to the production schedule to implement the progress and supervise the factory. Production progress is reported to the company at all times.

Supervises and assists the factory in the fulfillment of production and quality requests made by the customer's order taker or by the company's inspection visits to the factory and reports back to the company on the fulfillment of these requests.

μ μ Finished products into the finishing shop, need to be ready to check the actual workers ironing, packaging and other quality, and from time to time sampling test packaged finished products, to do there is a problem early discovery, early treatment. Do our best to ensure the quality and delivery of large goods.

Sneakers After the packaging of the big goods, we should check the cutting details with the packing list, and check whether each color and each number is consistent. If there is any problem, we must find out the reason and solve it accordingly in time