1. Quality meeting system
1.1 Daily production meeting review
1.2 Weekly quality meeting
1.3 Monthly quality inspection and evaluation
At the end of each month, by the project quality and safety manager to organize the owner, the management company, the quality of the subcontractor and the technical responsible person of the project in progress to carry out physical quality inspection, followed by the labor unit, subcontractors write a summary report of the quality of this month to the project divisional quality manager, and then summarized by the quality manager to the "monthly" in order to "quality check. After the quality inspection, the labor units and subcontractors will write a summary report on the quality of the works in progress for the month to the quality manager of each district of the project, and then the quality manager will summarize the report and send it in the form of Monthly Quality Management Briefing to the owner, the management company, and the relevant leaders of the project management department, each department and each labor unit and subcontractor. Briefing on the quality of good labor units, subcontractors should be praised, the need to rectify the part should be clear rectification date, and in the next week's regular meeting of the quality of item-by-item check whether to rectify thoroughly.
1.4 Quality Consultation System
2. Material Quality Management System
2.1 Construction Material Grading Management
2.2 Construction Material Submission System
2.3 Construction Material Inspection System
Two, Construction Process Quality Management System
1.1 Construction Personnel Training and Assessment System
3. Inspection and test of process
The inspection and test of process should be in accordance with the provisions of the identified quality defects process should be dealt with in a timely manner in accordance with the unqualified control procedures. Reinforcing steel construction quality inspection
Concrete construction quality inspection
Reinforcing steel size inspection
Concrete slump test
Three, quality testing equipment control
The establishment of metrologist is responsible for the management of inspection, measurement and testing equipment, and the establishment of measuring instruments management account. Into the project inspection, measurement and test equipment, must list and check the status of the list of the project manager's metrologist, subject to supervision and inspection. Unchecked inspection, measurement and test equipment shall not be used.
Four, three inspection system and inspection and acceptance system
Five, the problem of accountability system
Six, quality
1.1.Measurement works
2.Reinforcing steel works
3.Template works