Engineering construction responsibility letter model

Engineering construction responsibility letter model

Engineering construction responsibility letter model, a project is usually a relatively large project, in the project personal safety is the most important, so usually sign the engineering construction responsibility letter, in the signing of the responsibility letter before it is best to understand the responsibility letter, the following I organized the engineering construction responsibility letter model.

In order to improve the level of safety management of building construction enterprises, conscientiously implement the "safety first, prevention first, comprehensive management" policy, according to the county government on the safety of production requirements, to further rationalize the construction system safety management work mechanism, to strengthen safety management, the implementation of safety responsibility, from the source to the construction of the building, and to improve the safety management of the building. Management, the implementation of safety responsibilities, from the source to prevent and reduce the occurrence of various types of safety accidents, according to the "Work Safety Law", "Construction Safety Management Regulations" and "Shandong Province Work Safety Regulations", combined with the actual housing and urban-rural construction bureau and construction companies identified XX annual production safety target responsibility, clear the following production safety responsibility objectives.

First, the responsibility of the target

(a), the production safety control indicators

1, construction companies within the year, there are no fatal accidents, a serious injury of more than 3 people or a direct economic loss of more than 30,000 yuan of various types of safety production accidents.

2, the various types of hidden accidents at all levels of inspection and rectification rate of 100% on schedule.

3, the construction company's annual creation of municipal safety and civilization site reached more than 30%.

4, the construction site according to the "construction safety inspection standards" inspection score of 70 points or more (including 70 points).

(2), the basic management of safety production

1, the construction company set up a corporate officer for the leader, deputy in charge of the deputy leader of the construction safety leadership group.

2, the construction company is the first person responsible for production safety, must be responsible for the enterprise's production safety, implementation of laws, regulations and provisions of production safety, the establishment of a sound production safety management organization, according to the provisions of the full production safety management personnel, at least once a quarterly meeting of the production safety topics, research, to solve the production safety management work in the new trends, new problems, the implementation of safety precautions, the meeting should be recorded. Safety precautions, the meeting should be recorded.

3, the implementation of production safety target responsibility system, and all departments at all levels signed the "building construction safety target management responsibility", clear work responsibilities and the corresponding responsible person.

4, improve and perfect the building construction safety management rules and regulations and "emergency rescue plan for building construction safety accidents", clear positions within the department and the corresponding responsible person.

5, the enterprise should have a plan to carry out safety inspections of the building construction site.

6, when a safety accident occurs in construction, the main person in charge of the construction enterprise should quickly go to the scene, (application form) to organize rescue, and report the accident situation to the Housing and Urban-Rural Development Bureau in a timely manner to assist the Housing and Urban-Rural Development Bureau and the relevant departments to seriously investigate, and do a good job in a timely manner in the aftermath of the work, and shall not be hidden, concealment, and delayed reporting.

7, in accordance with the provisions of the supervision of the issuance of wages to employees (migrant workers), to put an end to the arrears of wages to employees (migrant workers) and the petitions triggered.

8, actively organize and carry out production safety publicity, education and training, especially to strengthen the special operators, new or change the type of work of migrant workers education and training.

Second, production safety inspection and assessment

1, quarterly inspection: Housing and Urban-Rural Development Bureau of the quarterly implementation of the construction of construction projects. Inspection results, as one of the basis for the quarterly assessment and evaluation of enterprise safety production management.

2, temporary inspection and random sampling: in the middle of the quarterly production safety inspection, housing and urban-rural construction bureau will be irregular, irregular implementation of the inspection of the enterprise construction projects, the results of the inspection, credited to the quarterly assessment of enterprise production safety management evaluation, but also one of the bases for the quarterly assessment and evaluation.

3, the annual comprehensive evaluation: according to the four quarters of the safety inspection, temporary inspection, random sampling results, the end of the year on the enterprise annual safety production management level to do a comprehensive scientific evaluation, notification of the results of the assessment.

Third, incentives and penalties

Housing and Urban-Rural Development Bureau of the full completion of the responsibility of the goal of the person in charge of the enterprise to give recognition and rewards; on the completion of the responsibility of the goal of the cancellation of the enterprise and the person in charge of the selection of the qualification of the first, its notification of criticism, and in accordance with the relevant provisions of the economic penalties; on the management of the mismanagement, resulting in personal injury and death of the safety of production The company's management of the accident, according to the relevant provisions, seriously investigate the responsible units and responsible persons of the relevant responsibility.

Signature of the person in charge of the Housing and Urban-Rural Development Bureau of Linyi County:

Signature of the person in charge of the building construction enterprise:

xx xx xx month xx day

Engineering Construction Responsibility Letter Model 2

In order to ensure that the project is carried out smoothly and all the engineering construction personnel in the construction process of personal and property safety, and to make clear that the safety responsibility of each construction personnel, especially the construction personnel. Require all construction personnel to sign the construction safety responsibility of the project.

A production work safety related

1, construction personnel in the construction must strictly abide by the "building installation workers safety and technical regulations" in the provisions of the safety of construction, prohibited unauthorized operation, unauthorized command of the right to refuse to carry out.

2, special operations must implement the national "special operators safety and technical training and assessment of management regulations", strictly licensed to work.

3, work at height. Operators should wear rubber-soled shoes, wear a good helmet, fasten the safety belt, fasten the safety hook, and the correct use of personal protective equipment; work at height, are not allowed to throw up or down materials and tools and other objects; rainy days and more than five winds prohibit outdoor work at height, such as erecting and dismantling the scaffolding, tree work.

4, pit and groove work. To pay attention to the stability of the soil wall, found that there are cracks and tendency to collapse, the personnel should be immediately withdrawn and promptly reported to the relevant management personnel to deal with; large tree transplantation, it is strictly prohibited to start digging seedlings without supporting the tree firmly, digging out the bottom of the head and torso is strictly prohibited to reach under the soil platform, the wind reaches the fourth level, it should be immediately stopped digging out the bottom.

5, lifting, lifting operations. Lifting and hoisting operators must strictly abide by the "ten not to hang" provisions, is strictly prohibited unauthorized, unlicensed operation.

6, electricity, fire safety. Construction site is strictly prohibited the use of bare wire power; construction and transmission lines (especially high-voltage lines), electrical equipment to maintain a safe distance; strictly prohibit people who do not understand the electrical, unauthorized operation, use and repair of wires, electrical appliances; gas cutting, welding must strictly comply with the "ten not burn" provisions; welders, gas welders engaged in the installation of electrical equipment and electricity, gas welding Cutting operations, there should be an operator's license and fire permit; oxygen cylinders, acetylene cylinders work at a distance of not less than 5m, two bottles and the distance between the open fire operation of not less than 10m; construction projects are prohibited oxygen cylinders, acetylene bottles stored, prohibit the use of liquefied petroleum gas "cylinders"; unauthorized use of unauthorized sheds, temporary construction of the use of electric stoves, alcohol stoves and other sources of open flame, as well as gasoline, diesel and other power generation equipment, strictly prevent unauthorized use of electric stoves, alcohol stoves and other power generation equipment. Diesel and other power generation equipment, to prevent fire accidents and gas poisoning accidents; construction site is strictly prohibited smoking and littering of flammable items; all on-site power distribution box systems are using leakage protector, and each circuit needs to be used for electricity calculations using qualified products.

7, machinery, equipment operation safety. Operators must be in accordance with the provisions of the "fixed machine and fixed person" and licensed to operate; strictly prohibit people who do not understand the mechanical equipment, unauthorized operation, use and repair of machinery and equipment; machinery and equipment before stopping the operation of the inspection is strictly prohibited, moving or transferring, is strictly prohibited from touching the rotating machinery and equipment, cutting, extrusion and other parts.

8, in and out of the site and go out. Construction personnel to enter the site must wear helmets and passes or work permits, and comply with the relevant provisions of the gate; from the site to go out must ask the project management, agreed by the project manager before going out, or all the consequences of the construction personnel to bear.

Second, life and rest safety-related

1, transportation safety. Motorists and other construction workers must strictly abide by the "Road Traffic Safety Law", the traffic code of conduct and foreign local traffic safety laws and regulations, whether driving, riding, cycling out or walking out to comply with traffic laws and regulations, pay attention to safety; prohibit the serious violation of drunken driving.

2, property safety. Construction workers should take care of their own personal belongings, when leaving the dormitory must be the door, windows locked, when you go to bed must be the door and windows locked, lost, by the construction workers to bear the loss; the tools and equipment, to be properly stored and protected, after use to be returned in a timely manner to the treasury, due to the lack of proper storage or timely return damaged or lost, by the construction workers to bear the responsibility for compensation; is strictly prohibited in any form and for any reason! It is strictly prohibited in any form and for any reason, private take, private sale of any items on the construction site or warehouse.

3, the construction personnel should comply with the construction site of the relevant national and local laws and regulations, to achieve civilized construction, is strictly prohibited in the site gangs, fights and brawls; violation of this article and the above articles of the construction personnel, depending on the severity of the situation to be punished.

4. It is prohibited to buy food and drinks sold by local people in the construction site or camp area.

3. Social Environment Risk

1. Equatorial Guinea is a relatively stable society, and the construction workers shall not violate local laws and regulations for any reason; they shall not clash with the local government and public officials during the construction process or when they go out to do business.

I hereby confirm that I have accepted the pre-work safety education in the Project Manager Department of Malabo National Park in Equatorial Guinea on January, 2012. For the project manager, the general manager of the company and the manager of the project manager signed the following project construction project management objectives and responsibilities:

The first part of the management objectives

First, the economic indicators

1, revenue: 10,000 yuan;

2, to achieve Profit: 10,000 yuan, the profit rate of %;

3, paid management fees: 10,000 yuan, paid management fee rate of %.

Second, the operation and management objectives

1, the construction period

to meet the owner's schedule requirements.

2, quality

(1) unit project acceptance of a pass rate of 100%;

(2) the quality of this project to achieve the provincial (Ministry) excellent engineering goals;

3, through the standard certification work

(1) through the standard of the external audit no Serious unqualified items;

(2) Occupational health monitoring rate of 100%, the annual new occupational cases ≤ 0.15%;

(3) on the environmental pollution control rate of 100%; noise, sewage, air pollutant emissions to meet the standard rate of 100%; solid waste prevention and control of environmental pollution rate of 100%; more than 80% of the construction of the dust concentration test rate of wells and alleys

4, safety management:

(1) no workplace accidents;

(2) elimination of major traffic, equipment, fire, electrocution, explosions, and poisoning accidents;

(3) 100 million yuan of construction output value of the rate of serious injuries ≤ 1, the rate of minor injuries ≤ 5 people;

5, Cost control: the proportion of costs and expenses to operating income within %, of which:

(1) labor costs accounted for the proportion of operating income within %;

(2) the proportion of material costs accounted for the proportion of operating income within %;

(3) the proportion of machinery costs accounted for the proportion of operating income within %;

(4) other direct costs accounted for the proportion of operating income within %;

(4) the proportion of other direct costs accounted for the proportion of operating income within %;

(5) the proportion of other direct costs accounted for the proportion of operating income within %. (4) the proportion of other direct costs in the operating income within %;

Among them: the project manager's life and production of temporary facilities costs control within 10,000 yuan.

(5) the project management department management costs control within 10,000 yuan;

Among them: business hospitality costs control within 10,000 yuan.

Part II Responsibilities, Rights and Benefits of the Project Manager

I. Project Manager's Responsibilities:

(a) To fulfill all the obligations and responsibilities of the company in the contract signed between the company and the owner unit to ensure that the overall objectives of the project is realized to ensure that it meets the satisfaction of the owner. (ii) To fulfill all the obligations and responsibilities of the company in the contract signed between the company and the owner to ensure the realization of the overall objectives of the project and to ensure the satisfaction of the owner.

(2) conscientiously carry out the implementation of the state and the local government of the relevant laws, regulations and policies, the strict implementation of the Group and the company's management system, correctly deal with the relationship between the state, business, personal interests, and to do legitimate business.

(3) Strictly implement the group company's system on material and equipment procurement, engineering or labor subcontracting bidding management, selection of engineering or labor subcontracting team, fund management, safety management and other aspects.

1, bulk material procurement bidding must be strictly implemented Twenty-three Metallurgical Office issued [XX] No. 19 on the issuance of "Twenty-three Metallurgical Construction Group Limited bidding supervision and management methods (for trial implementation)" and Twenty-three Metallurgical Supervision and Inspection issued [2011] No. 1 on the issuance of "Twenty-three Metallurgical Construction Group Limited bidding supervision and management methods of the implementation of the Rules".

First, the procurement activities of bulk material procurement contracts with an estimated price of more than 200,000 yuan must go through the bidding process. It is prohibited to reduce the whole to zero, and all those who meet the bidding conditions must be tendered.

Second, the bidding process must have the following written information: invitation for bids, bidding to determine the written report of the market survey, the bidder's tender, bid evaluation meeting minutes, bid evaluator evaluation comments, bid evaluation results, the project manager to select the winning unit of the written decision.

Third, all bidding activities of the project management department must be reported to the company's bidding supervision center supervision, approval in the company before signing the procurement contract. The bidding activities of the provincial projects with contract estimation value of 1 million yuan and above or the bidding activities of the out-of-province projects with contract estimation value of more than 5 million yuan will be evaluated and supervised by the bidding supervision center of the group company involved in the organization.

Fourth, the bidding process must establish accounts, prepare catalogs, and form written files.

The scope of application of bidding for bulk material purchases, bidding methods, bid opening, bid evaluation, bidding, bidding supervision, and bidding supervision are carried out in accordance with the specific requirements of the Management Measures and its implementing regulations. If there is any modification, it will be implemented according to the new documents

2, engineering subcontracting (including labor) must strictly implement the "XXIII Metallurgical Office [XX] No. 19 on the issuance of" XXIII Metallurgical Construction Group Limited bidding supervision and management methods (tentative) "and" XXIII Metallurgical Supervision and Inspection [2011] No. 1 on the issuance of" XXIII Metallurgical Construction Group Limited bidding supervision and management methods implementation rules" and "XXIII Metallurgical Construction Group Limited bidding supervision and management methods implementation rules". Measures for Implementing Rules" and "Regulations on Subcontracting and Labor Subcontracting for Construction Projects of Eosan Metallurgical Works".

First, project subcontracting (including labor): where the estimated contract price of the unit work (sub-parts of the project) is 100,000 yuan and above, and the estimated contract price of the labor subcontracting contract is 100,000 yuan and above, the bidding procedure must be implemented, and it is prohibited to divide the whole into parts.

Second, the bidding process must have the following written information: invitation for bids, bidding to determine the project budget analysis information and market research written report, bidder's tender, bid evaluation meeting minutes, bid evaluator evaluation comments, bid evaluation results, the project manager to select the winning unit of the written decision.

Third, the project manager of all engineering (labor) subcontracting bidding activities must be reported to the company and the company's bidding supervision center for approval before signing the project (labor) subcontracts. The bidding activities of the provincial engineering projects with contract estimation value of 1 million yuan and above or the bidding activities of the extra-provincial engineering projects with contract estimation value of 5 million yuan and above are evaluated and supervised by the bidding supervision center of the group company.

Fourth, the bidding process of engineering (labor) subcontracting must establish accounts, prepare catalogs, and form written files.

The scope of application of the bidding business, bidding methods, bid opening, bid evaluation, bid determination, bidding supervision of the project (labor) subcontracting is carried out according to the specific requirements of the management approach and its implementation rules.

3, engineering (labor) subcontracting team selection: must choose the appropriate qualification (labor) subcontracting team.

First, the selection of engineering (labor) subcontracting team must be in line with the Group's "on the project subcontracting and labor subcontracting. Provisions", can only choose to have the appropriate qualifications of engineering (labor) subcontracting unit. It is prohibited to subcontract by natural persons.

Secondly, the labor personnel of the engineering (labor) subcontracting unit must be licensed, and the rate of licensed special types of work is 100%.

4, comply with the centralized management system of funds

First, the strict implementation of the Group's Cai Fa [2011] No. 13 on the issuance of the "Twenty-three Metallurgical Construction Group Co., Ltd. funds centralized management implementation rules" notice and the company's centralized management of the funds of the relevant documents, the project management department from the owner side of the project progress payments, The project manager's project progress payment, settlement payment, work schedule award (or rush award) and other funds must be remitted to the centralized management bank account designated by the company.

Secondly, the company will allocate the funds to the special account for fund payment according to the validated plan of the project management department for the month, and it is strictly prohibited for the project management department to pay directly on the special account for fund collection.

Third, strictly comply with the company on the project management department in the main account other than the establishment of the special account for the receipt of funds, the implementation of the balance of the limited real-time pooling management system, the payment of special account acceptance of the company's limit management system.

5, strengthen safety management:

Project construction process safety production management strictly implement the "Twenty-three Metallurgical Construction Group Limited project safety management manual" provisions, and effectively grasp the work of production safety.

(d) Preside over the preparation of project management implementation rules, and systematic management of project objectives.

(v) Carry out dynamic management of resources, establish various professional management systems and organize their implementation.

(F) the distribution of benefits within the scope of authorization.

(VII) should do a good job in a timely manner with the owner of the monthly volume of signing the reply, engineering changes to adjust the project completion and acceptance of the report, completion of the settlement and subcontracting business of the various settlement work.

(H) accept the company audit, deal with the aftermath of the dissolution of the project management department.

(ix) In accordance with the requirements of the Group Company's "Guidelines on the Implementation of Comprehensive Budget Management for Engineering Projects", the implementation of comprehensive budget management for engineering projects, budgeting, assessment surface reaches 100%.

(J) is responsible for the preparation of various types of plans and statements, true, timely and accurate according to the system management and the relevant provisions of the report to the relevant departments of the company.

(xi) submitted to the Labor Insurance Fund: the full amount of the project special labor insurance fund to the company, this cost is not included in the scope of the management fee submitted, special accounting special submission.

(xii) total wages as the basis for the submission of costs, including old-age insurance premiums, industrial injury insurance premiums, medical insurance premiums, housing fund, unemployment insurance premiums, maternity insurance premiums, labor union funds*** 7, according to the provisions of the company to calculate and submit.

(xiii) Complete the task of submitting all funds according to the regulations, and return the project funds advanced by the company on schedule.

(xiv) in situ extension of the construction project or the development of new projects, its bidding needs to be submitted to the company for approval to determine the implementation of this project during the period of the development of business million dollars.

(xv) do a good job of collecting risk collateral. Monthly in the salary deducted as part of the risk of security deposit or according to the provisions of the company to pay a separate risk of security deposit million dollars.

(xvi) Other duties ____.

Second, the power of the project manager

(a) participate in the project bidding, bidding and contract signing.

(ii) Preside over the work of the project manager department.

(C) production command rights: the project manager has the right in accordance with the authorization of the legal representative, according to the project at any time, such as human, financial, material and other resources changes in the situation of the command and scheduling, for the construction of the organizational design and network plan, in order to ensure that the overall objective remains unchanged under the premise of optimization and and adjustment.

(d) Personnel rights: project team members appointment, rewards and punishments, assessment, dismissal of the right to recommend; other personnel (except the company directly assigned personnel) the right to decide the use of; the right to participate in the selection of labor subcontracting team with the appropriate qualifications.

(E) financial management rights: within the scope of the company's authorization of the input and use of project funds.

1, within the scope of the company's authorization, the right to arrange for the expenditure of the target cost;

2, within the scope of the company's authorization, to the company's proposal for the project within the staff's salary level, distribution methods, distribution principles and specific programs;

3, within the scope of the company's authorization, the implementation of piecework wages, flat rate wages, job wages and to determine the distribution of bonuses (including the duration of the prize) Programs;

(F) technical measures and technical programs for the preparation and validation of the relevant provisions of the coherence process.

(7) within the scope of the company's authorization, organize or participate in the procurement of equipment, supplies and materials, select the type of machinery and equipment, quantity, and time of entry, acceptance of purchased equipment and materials in accordance with quality standards, inspection.

(viii) Coordinate internal and external relations related to the project within the scope of the company's authorization.

(ix) Other powers granted by the legal representative _______.

Other team members perform their duties according to the division of labor of the project manager.

Third, the interests of the project manager

1, according to the "Twenty-three Metallurgical Construction Group on the sub, branch of the project department owned by the wage guidance" of the provisions of the project salary treatment.

2, enjoy quality engineering awards. The project reaches the target of provincial (ministerial) excellence, and the project manager enjoys the quality engineering award according to the current regulations of the Group.

3, enjoy the management goal of honoring the award.

4, enjoy the business development award.

5, enjoy the excess profit award.

6. Other ________ rewards stipulated by the company.

Other team members enjoy the corresponding benefits according to the division of labor of the project manager.

Part III Awards and Penalties

In accordance with the results of the assessment, the company to give the project manager and its project team members to honor the awards and penalties, awards and penalties are clearly as follows:

First, the target incentives

(a) target Calculation of rewards

1, the determination of the base of the award:

The base of the award = the amount of profits and fees paid x the percentage of the award

2, the award time coefficient = the actual number of months of work / effective duration (total number of months)

3, the principle of determining the coefficient of the job: project manager job coefficient for "1 "; other members of the project team's job coefficient of 0.5 to 0.8, by the project manager based on the performance of the team members to the company made a proposal to the company confirmed.

4, the target award calculation formula: target cash award = award base * job coefficient * time coefficient of service

(B) the time of the target award realization:

1, by the company's audit, assessment and confirmation of the completion of the objectives, while the project manager to the owner side of the funds recovered and the profits and fees paid to the company are 80% Above, give cash 70%;

2, the project settlement is completed, all the recovery of project funds, project debt clearance is completed and then cash the remaining 30%.

Second, the excess profit reward:

1, the target profit fee = operating income × the proportion of the corresponding profit fee submitted

2, excess profit = actual profit fee - target profit fee

Excess profit award according to the company's current approach to the allocation of the project manager team members.

Third, the penalties

1, the project manager did not complete the target responsibility of the target profit and fees submitted to the target, the project manager and his management team members of the risk of collateral against the payment of the shortfall;

2, the project manager if a loss occurs, in accordance with the "Twenty-three Metallurgical Construction Group Limited internal management accountability measures" relevant provisions. Management Accountability Measures" of the relevant provisions of the project manager and the relevant responsible person to deal with:

3, the occurrence of construction quality accidents, safety fatalities, serious injuries, major man-made mechanical accidents are punished in accordance with the relevant management methods;

4, handover of information is not filed in a timely manner deduction of the project manager, the technical person in charge of the target cash prize of 10,000 yuan to 50,000 yuan;

5, Materials and supplies, engineering or labor subcontracting bidding management system is not effective in the implementation of deductions target cash prize 1 to 50,000 yuan.

Fourth, the project manager cash prize formula

1, target cash prize = target award + excess profit award + business development award + quality engineering awards - safety, quality fines - other penalties - bonuses issued

2, personal income tax by the project manager team members to bear.

Part IV Supplementary Provisions

1, this responsibility is regularly assessed by the company's project target management assessment committee.

2, this statement of responsibility by the legal person or authorized representative and the project manager signed, stamped and effective, the project delivery and acceptance, settlement of payments, the warranty period expires, the target responsibility rewards after the expiration.