Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Article 1: Overview of the project
1. Name of the project:
2. Scope of contracting of the project:
3. Location of the project
4. Date of commencement of the project: month and day of the year, subject to the notice of the Party A's entry to the site. shall prevail.
Article 2: the amount of work
tentatively set at 10,000 cubic meters, subject to the actual completion of the workload.
Article 3: single transport distance and unit price
1, transport distance: pouring mud mouth within 7.5 ~ 8 kilometers, the unit price of 7.5 yuan / m3 (this unit price is all exclusive of dumping fees, taxes, and digging, loading and leveling site fees). If the transportation distance beyond the Party in addition to compensation, the specific unit price is negotiated separately.
2, earth square volume calculation to the car square calculation.
Article 4: the specific acceptance method of the project
1, the use of signature acceptance card records as the basis for the settlement of the amount of work, but the acceptance card must be consistent with the records, the amount of car is not enough to sign the acceptance card records as a basis. If the number of manual records do not match, it is impossible to identify the cause, to record the number of less for the calculation of the number.
2, Party B, all the vehicles into the field, vehicle volume must be recognized by the party amount of party personnel as the basis for the vehicle measurement to the financial settlement group to apply for a record card, Party B with a record card first in the site mud head at the loading of mud, after the completion of the party's earth management personnel to approve the amount of vehicle loaded in the acceptance of the card signed by the party unloading the mud in a designated place by the party unloading the mud driver will be acceptance of the card handed over to the party's management personnel to confirm that all the mud trucks must comply with the site management personnel. All the mud trucks must obey the command of on-site management personnel, otherwise they will not be signed. The mud trucks without upper and lower managers' signature on the record card will not be taken as the basis of acceptance.
Article 5: Payment for the project
1, the settlement of the project is three days a knot, Party A according to the actual amount of work completed by Party B settlement, according to 100% payment of the project.
2. Party A will provide Party B with the fuel cost for the first time of the fleet, which will be deducted when the project is settled for the first time.
Article 6: Responsibility of both parties
1, Party A's responsibility:
(1) Party A is responsible for all the owner's pre-construction formalities to ensure that Party B can enter the construction site on time.
(2) Responsible for the road, urban management, traffic police and all costs arising from overloading to ensure that Party B can be transported smoothly. Otherwise, the resulting missed work will be borne by Party A, and Party B will be compensated according to the calculation of 1000 yuan per day per unit. If Party B's vehicle license is not complete the responsibility arising from the costs and Party A has nothing to do.
(3) is responsible for Party B drivers, management personnel housing costs (utilities by Party B) and parking lots (including parking fees), coordinating the various relationships and costs of the earth and dumping ground and to ensure that the earth and dumping ground for the use of Party B, so that Party B can be successful in the construction of the amount of time.
(4) Responsible for the payment of the works of Party B on time, so that Party B will not stop and wait for the work.
(5) Responsible for arranging and dealing with the loading machinery at the soil extraction site and the machinery for leveling the site at the dumping site to ensure that Party B's transportation will not be affected as a result. Otherwise, Party B will be compensated RMB 1,000 per vehicle per day for lost labor.
(6) Responsible for compensating the entrance fee of RMB1000 per vehicle, which will be deducted when Party A settles the first bill. (7) Party B's vehicles operate normally, but due to Party A's reasons within 24 hours the average number of cars pulling soil per vehicle is not enough for 12 cars, each less than one car Party A compensate Party B for the loss of 100 yuan, and vice versa, Party B compensate Party A 100 yuan.
(8) in the case of Party B does not violate this contract, Party A at least use Party B vehicles for more than a month, or 5000 yuan per vehicle compensation for Party B round-trip loss, and vice versa, Party B also bear the same responsibility for compensation.
(9) In Party B's vehicle does not violate this contract and can meet the construction requirements of Party A, Party A shall not arrange other vehicles into the construction, or Party A compensate Party B for the loss of 300,000 yuan, on the other hand, Party A can arrange other vehicles into the field, Party B shall not have objections.
2, Party B's responsibility:
(1) After the contract is signed, Party B must organize the vehicles to enter the site within the specified time according to Party A's engineering requirements, and require the first batch of vehicles of not less than 20 units (within seven days to enter the site.). , each vehicle volume in 25m3 above the front single rear double vehicles.... Otherwise, Party A can cancel this contract, and Party B will compensate Party A for the loss of 300,000 yuan of lost labor.
(2) Party B's organization of the vehicle must be fully licensed, such as the license is not complete by the relevant administrative department fines, by Party B's own responsibility, and Party A has nothing to do.
(3) If Party B's fleet is traveling on the road, the traffic accidents occurred, Party B is responsible for all the economic and legal responsibilities, and Party A has nothing to do.
(4) Party B's fleet into the field less than a week after the unexplained withdrawal, Party A will not settle the first three days of freight.
(5) In the event that the project is not completed or Party A violates this contract, Party B's vehicles shall not be transferred out of the site without Party A's consent, and if Party B unilaterally transfers the vehicles out of the site, Party A shall be compensated for the loss of RMB 1,000 yuan per day per unit.
(6) is responsible for equipping the management personnel and logistic service personnel, must ensure that the construction is 24 hours a day, can not be stopped for no reason. If found according to each unit of 1000 yuan per day to compensate for Party A's losses.
(7) is responsible for the safety of vehicles and personnel, to achieve safe construction, civilized construction, such as safety accidents, Party B is responsible for all economic and legal responsibility, and Party A has nothing to do.
Article VII: Liability for breach of contract
1, such as Party A causes Party B fleet can not be normal construction, stoppage, pending work for three consecutive days or a total of five days or more per month, from the date of exceeding the Party should compensate Party B for lost wages, 1000 yuan per day per unit, the personnel of the cost of living per person per day of 50 yuan until the project is normal (in addition to the natural disasters force majeure, except for the people).
2, Party B does not get on the car on time, resulting in Party A's project can not be completed on time or Party B stopped work without reason, Party A has the right to order Party B to compensate Party A for the loss of overdue compensation to Party A at 1000 yuan per day per unit, and depending on the circumstances of the right to dismiss Party B out.
3, Party A and Party B can not be canceled without the approval of the other party to the contract, if one party default will compensate the other party for all losses.
Article VIII, other:
(1) Both sides should cooperate with each other, do a good job in solving the coordination work, both sides should send a person responsible for site management.
(2) Both parties shall strictly abide by the implementation of the provisions of this contract, and each party shall not violate the contract. Otherwise, the defaulting party shall be responsible for compensating all economic losses and legal liabilities of the complying party, and shall pay 500,000 yuan as compensation for breach of contract.
(3) During the construction period, if there is any dispute between the two parties that cannot be resolved through negotiation, either party may file a lawsuit, the cost of which shall be borne by the defaulting party.
(4) The two sides consult to supplement and improve the outstanding matters, and this contract has the same legal effect.
(5) This contract in duplicate, A, B, each party holds a copy of the two sides signed by both parties to enter into force
(6) this contract price clearance, the natural termination of this contract.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
Transportation Contract Part 2Excavation and Transportation of Flat Earthwork Agreement
Party A (the contracting party):
Party B (the transporting party):
According to the "People's Republic of China **** and the State of China Contract Law" and relevant laws and regulations and other regulations, and in conjunction with the specific circumstances of the project for the purpose of defining the rights, obligations and liabilities of the two parties in the contracting of the project to ensure the full completion of the project task, in a voluntary, equal, mutually beneficial and fair manner. In the voluntary, equality and mutual benefit and fair and reasonable and honesty and credit principle, in line with the principle of mutual benefit and reciprocity, the A and B sides agreed to sign this agreement through friendly consultation, I hope that the A and B sides abide by each other to implement.
Article I. Project Overview
I. Project Location: Zhuhai City, Gaolan Harbor
Second, the scope of the project: digging, transportation, unloading of soil and stone square
Third, the number of projects: about 10 million square, the duration of the tentative period of one year
Fourth, the project distance and unit price: from the digging to the end of the transport unloading mud within the range of 4 kilometers. Party B to calculate the excavation and transportation price per car party, after tax price of RMB 7.8 yuan party billing to the Party A settlement of freight, Party A to ensure that the Party B fleet driving smooth roads, over the contract to drive 4 kilometers after the number of transport routes traveled more than 0.5 kilometers, that is, according to the average price of transport car party transport calculations and freight, a single price with the price of the field for the corresponding price fluctuations.
Article II project period
According to the two sides to see the site of the consultation party B recognized the contract signed by the party A issued a notice of entry into the field of operation from the date of party B within three to five working days of the organization of the operation of the means of transport and excavation tools to party B into the field of the start of the day shall be 365 sunny days can start working days to complete the project, in the event of unforeseen or force majeure, the duration of the work will be postponed.
Article III of the project settlement and payment
1, machinery entry fee, Party B is responsible for the organization of excavators, vehicles and other machinery to the site, Party A is responsible for pre-payment of towing costs per
excavator towing machine is about 1,000 to 1,500 yuan, the vehicle is 500 yuan per unit.
2, Party B every day before 10:00 a.m. to Party A to hand over the transport settlement once, each time with Party A to provide the use of mud head mud tail
valid signature card or IC card as a basis for the settlement, Party B according to Party B the actual number of loaded cars loaded with the distance from the combination of the unit price of the settlement of 100%, Party A to the 10-day period of time every day, each car deducted 200 yuan of transportation until the deduction of the full 20xx yuan. A car to do the contract bond, the contract expires in full refund.
3, the settlement time for the daily settlement of a settlement, Party A according to the account number of the bank provided by Party B in the form of transfer or cash
form of payment to Party B, such as Party A did not pay on time to Party B, Party B has the right to unilaterally stop the work to Party A to recover the money, and can unilaterally terminate the agreement and require Party A to pay off the outstanding amount of money for the project, and to pursue the compensation of Party A to Party B for each excavator 1000 yuan per day, per truck. 1000RMB per day and 500RMB per day for each transportation truck until Party A pays off the project.
4, Party B's vehicle in the route specified by the traffic police, road traffic police car, Party A should be in twenty-four hours
take the car back to the use of Party B, otherwise, should be compensated for the detained vehicle 500 yuan per day.
Article 4: Responsibilities of Party A and Party B
(a), Party A's responsibility
1, Party A's appointed representative of Party A's rights, responsible for coordinating and communicating with Party B, and in the signing of the contract to provide the work
project-related information to Party B backup.
2, Party A is responsible for entering the site to start the certificate and Party B digging, transport vehicle fuel supply (after settlement of the fuel costs deducted back), send supervision
management company personnel direct on-site supervision, quality inspection, with the coordination of Party B towing team in the implementation of the project during the implementation of the
a variety of situations on-site communication with the Party B personnel to deal with in a timely manner.
3, Party A is responsible for and timely organization of Party B's engineering transport volume, engineering volume acceptance confirmation for settlement procedures, such as Party A
Party A did not according to a reasonable amount of engineering transport for Party B transport, Party A must be paid in full for Party B all the costs incurred by the work of the vehicle scheduling.
4. Party A shall pay the project settlement in time according to the agreed period.
5, Party A is responsible for rationalizing the relationship between the surrounding and to ensure that the normal weather conditions of Party B start work up to 21 hours a day, such as transportation,
traffic police, municipal government, environmental protection, forestry, village committees, neighborhood committees, land, urban management, to ensure that the road is smooth, the responsibility of the Party B vehicle does not violate the cost of the circumstances occurring by the Party A is responsible for.
(B), Party B's responsibility
1, Party B within 5 days of the organization of valid certificates of more than 15-50 dump trucks diarrhea transporters into the field, the trunk capacity of up to (20 square cars), the car is in good condition, excavating hooker according to the number of Party B vehicles to control the number of their own engineering site to meet the actual needs of construction, and backup mechanical equipment table and transport vehicles three certificates copies of the relevant formalities to the A party for review and approval. For the record, and according to the work schedule reasonable deployment of vehicles and hooks.
2, Party B obey Party A production arrangements to ensure that the project is completed on time.
3, Party B's own production staff arrangements and management of their own production, food and lodging at their own expense.
4, Party B is responsible for employees (including drivers) for construction safety technology and civilized construction education, and the villagers have disputes with the first time to report to Party A to coordinate and deal with.
(1), the implementation of the state, Guangdong Province, Zhuhai City, the current production of civilized construction, strict evaluation standards, to comply with the safety regulations formulated by the Party.
(2), Party B to comply with the relevant provisions of the project construction safety production management and current management regulations, in strict accordance with the safety standards for the organization of construction at any time to accept the supervision of safety inspections, personnel construction supervision and inspection in accordance with the law. Take the necessary safety measures to eliminate potential accidents, the responsibility for accidents caused by improper safety measures and the costs incurred by Party B are fully responsible for.
(3), Party B should be its managers at the site, in the production of personnel for safety education and safety supervision. Pay attention to safety in the construction process, to ensure the safety of personnel and property. Party B must complete the project as scheduled, such as not in Party A without the consent of Party A shall not be transferred from the machinery to leave the field or retreat, Party A has the right to refuse to pay the corresponding outstanding project payments.
(4), Party B fleet accommodation provided by Party A free of charge, resulting in water and electricity costs, food, management by Party B is responsible for their own processing.
Article V. The term of this agreement is from January to January.
Article 6 This Agreement shall be signed by both parties in the spirit of friendly cooperation. Supplementary agreement and this agreement have
the same legal effect.
Article VII of this Agreement in two copies, A and B each party to sign a copy, with the same legal effect, this Agreement to the two sides to strictly
strictly abide by the implementation. Carrying coal matters, after friendly consultation, the two sides signed the 20xx coal transportation contract terms, as follows:
I. Transportation ship specification
Party B deployed ****** to carry Party A coal.
Second, the commissioned volume
Party A full commissioned Party B to carry the northern port launching coal about 1.4 million tons a year.
Third, the responsibility
1, Party A should provide a safe harbor, a safe berth in the loading and unloading of the two ports, according to the type of ship to prepare for a full supply of goods.
2. Party B shall inform Party A of the ship's dynamics and ship's position on a daily basis, and Party A shall inform Party A in advance of the equipment maintenance plan.
3. Any party proposes to change or increase the loading and unloading ports must obtain the consent of the other party.
IV. Transportation Plan
1. Party A shall arrange the monthly transportation plan in a balanced way within the contract year. Party A shall propose the transportation plan for the next month to Party B before the 25th day of each month.
2. Party A shall notify Party B of the transportation plan for the next voyage three days before the unloading of each voyage. If there is any objection to the transportation plan, Party A shall be notified two days in advance, and both parties shall consult for modification.
V. Measurement and handover
1, measurement according to the Ministry of Transportation, "Domestic Waterway Cargo Transportation Rules", to the ship's water feet as a measurement method.
2, handover Party A shall not refuse to accept the goods at the port of discharge due to the quality and quantity of the goods.
Sixth, freight and demurrage
1, tariffs by the base price and efficiency linkage adjustment price consists of the base price of the contract period unchanged, linkage adjustment according to the actual loading and unloading time to determine.
2. Benchmark price: North (Qinhuangdao, Tianjin, Huanghua, Jingtang, Jinzhou) to Yangtze River ports **** yuan / ton.
3. Efficiency linkage adjustment is determined according to the ship's voyage loading and unloading time. Loading and unloading two ports totaling 144 hours. Over 60,000 yuan / day.
4, the actual loading and unloading time, loading port: from the ship arrived at the port of loading designated anchorage, until after loading to complete the handover formalities, if the ship directly to the pier, to docking good pier from time to time. Unloading: from the time the ship arrives at the anchorage of the port of unloading to the completion of the handover formalities, or if the ship is directly docked at the wharf, it will be counted from the time of docking at the wharf.
VII. Mooring
1. Party B's ship loads at a safe berth in the loading port; unloads at a safe berth in the owner's terminal belonging to Party A. In the process of loading and unloading, Party B's ship will not be able to load or unload due to reasons other than Party B's reasons. In the loading and unloading process, if Party B needs to move the berth in the middle of the loading and unloading process for reasons of Party B, Party B's consent shall be obtained.
2, the cost of moving berths, the ship every additional berth from berth to berth, berth to anchorage or anchorage to berth moving, Party A to Party B to pay the dry costs of 20000 yuan.
Eight, settlement
Voyage cargo unloading is completed Party B issued a formal water transport invoice to Party A, Party A received a formal invoice within half a month after the payment of the relevant costs
Nine, insurance
Party A is responsible for the transportation of goods insurance, Party B is responsible for the ship's insurance, if one party does not handle the losses caused by the party not to deal with the full amount of the party to bear.
X. Dispute Resolution
Any dispute arising from or in connection with this contract, the first two sides to negotiate amicably, the consultation fails, it should be submitted to the location of the maritime court of the Party to litigate.
XI, the duration of the contract
Since January 1, 20xx at 0:00 to December 31, 20xx at 24:00 the ship to complete the loading voyage.
Party A's representative: Party B's representative:
Date: Date:
Contract of Transportation Part 4Party A: ____________________________________ Address: ____________ Postal Code: ____________ Telephone: ____________ Legal representative: ____________ Position: ____________ Party B: ____________________________________ Address: ____________ Postal code: ____________ Phone: ____________ Legal representative: ____________ Position: ____________ According to the "Chinese People's *** and State Contract Law" and the requirements of the maritime transportation management regulations, ________ (referred to as Party A) to ________ Transportation and Maritime Transportation Bureau (referred to as Party B), plans to consign ________ goods, Party B agrees to carry, and hereby sign this contract, *** together to comply with. Mutual control, the specific terms negotiated by the two sides are as follows:
I. Transportation method: Party B deployed ____ tonnage ship a (ship lifting equipment), at the request of Party A from ____ port to ____ port, according to the current provisions of the chartered ship transportation.
II. Cargo concentration: Party A shall concentrate the ____ cargo at ____ port within ____ days according to the time specified by Party B. After the cargo has been collected, Party B shall send a ship for shipment within 5 days.
Third, ship loading time: Party A contacted the arrival port agreed to arrange for unloading, after Party B implemented and ready to receive the set of goods (open set date specified by Party B). Loading operation time, since the ship arrived at the port has been docked at ____ hours to finish loading the goods.
Fourth, the delivery period: the ship will deliver the goods to the destination port within ____ hours from the time when the loading is completed and the formalities are completed. Otherwise, the ship shall bear the cost of delay according to relevant regulations.
V. Sailing contact: Party B will notify Party A to get ready for unloading after the ship has finished loading and sailing. If you need to navigate, also notify Party A to send pilot on time to navigate, the cost is borne by ____ party.
Sixth, unloading time: Party A ensures that Party B's ship arrives at ____ harbor anchorage, and unloads the goods within ____ hours from the time of anchoring. Otherwise, Party A will deliver delayed payment ____ per ton hour to Party B according to the time exceeded. In the process of loading and unloading goods, the time of loading and unloading operation affected by weather can be deducted according to the actual time affected by visas between Party A and Party B's ship.
VII, the quality of transportation: Party B loading, Party A should be sent to supervise the loading, guide the work in accordance with the rules of operation, after loading the ship sealing the cabin, Party A can send escort (free of charge a person) with the ship escort. Party B to ensure that the original original shipment, in addition to the loss of the ship's security conditions, the quantity and quality of the goods delivered by Party A is responsible for their own.
VIII, transport costs: according to the state regulations of water transport goods first-class tariff rate to the ship's deadweight tonnage of cargo freight ____ yuan, the empty cost of 50% of the freight rate ____, the ship's freight rate of ____ yuan, a time to collect.
IX. Expense Settlement: After this contract is signed by both parties, Party A shall first pay Party B the prepaid transportation expense ____. Party B in the ship after unloading, with transportation cost vouchers and Party A one-time settlement, more refund less compensation.
X. By-laws: Party A and Party B each hold one original and one copy of this contract. And registered with the Administration for Industry and Commerce for the record, if there are any outstanding issues, in accordance with the "Chinese People's *** and State Contract Law" and the relevant provisions of the State.
Party A: ________________________ Representative: ______________________ ____ ____ month ____ day
Party B: ________________________ Representative: ______________________ ____ ____ month ____ day
Transportation Contract Part 5Name of Party A (employer):
Name of legal representative (principal person in charge):
Name of Party B (laborer): Gender:
Year of birth:
Residential address:
Contact information:
Name of the employer: ______________________ Representative: ____ ____ month ____ day
Party B: ______________________ Representative. p> Contact:
Resident Identity Card No.:
A, B and the two sides in accordance with the "Chinese People's **** and the State Labor Law", "Chinese People's **** and the State Labor Contract Law," and other laws and regulations, on the basis of equal and voluntary, consensus, sign this contract, in order to **** together to comply with.
First, the contract period
Article 1 The term of this labor contract for a year, from the date of the year to the end of the month of the year. The probationary period shall be months, starting from the month of January to the month of January.
Second, the work task
Article B is responsible for the license plate number for the car driving work.
Article B should cherish the company's vehicles, pay attention to the usual maintenance of the vehicle, often check the main parts of the vehicle. Regular weekly inspection and maintenance to maintain the life of the components to ensure safe driving.
Article 4 Party B should clean the vehicle every day to keep the vehicle clean (including inside, outside and engine clean).
Article V before leaving the car, to routinely check the vehicle's water, electricity, oil, lights, brake system, tires and other parts of the performance is normal; found abnormal, to immediately add or repair. Back to the car, to check the amount of oil, found less than a grid of oil, should be immediately refueled.
Article 6 Party B found that the vehicle has faults, should be immediately overhauled; can not be overhauled, should be immediately reported to the supervisor, put forward specific maintenance advice (including maintenance projects and roughly the funds required, etc.).
Article VII Party B should always check the validity of all kinds of documents of the vehicle, and make sure that the documents are complete when traveling.
Third, working hours and rest and vacation
Article 8 Due to the special nature of the work, Party B needs to maneuver. By mutual agreement, Party B to implement irregular working hours.
Article IX Party B in the contract period in accordance with national regulations on vacation.
Fourth, labor compensation
Article 10 Party A pay Party B wages in monetary terms on a monthly basis, the monthly wage of yuan. Among them, the probationary period wage is yuan.
V. Social insurance Article 11 Party A in the contract shall be in accordance with the relevant provisions of the state and the local government for Party B for social insurance, of which the unit should be paid by Party A to pay the part of the individual should be paid by Party B to pay the part of the Party A to pay from Party B's wages withheld on behalf of the payment.
Article 12 The treatment of Party B's work-related injuries shall be carried out in accordance with the relevant provisions of the state and local governments.
Article 13 The medical treatment for Party B's illness or non-work-related injury shall be implemented according to the relevant provisions of the state and local government and Party A.
Article 14 The medical treatment for Party B shall be implemented according to the relevant provisions of the state and local government.
Article 14 The funeral grant, one-time death grant or relief fee for dependent immediate family members, pension or regular living allowance for dependent immediate family members of Party B who died on or off duty shall be implemented according to the relevant provisions of the state and local governments.
Sixth, labor discipline and rewards and punishments
Article 15 without approval, not allowed to go out privately, not allowed to send the vehicle to the factory for maintenance.
Article 16 out of the car or out of the car back to park the vehicle, must pay attention to choose the location and position of parking, not in the "no parking section" or "dangerous section" parking. When Party B leaves the vehicle, it should lock the safety lock to prevent the vehicle from being stolen. Article 17 Party B should pay attention to rest in the evening, not allowed to drive fatigue. Drinking and driving is strictly prohibited.
Article 18 Party B must obey the traffic rules, civilized driving, no dangerous driving (including speeding, climbing, following, fighting, racing, etc.).
Article 19 Party B due to violations or incomplete documents were fined, the cost will not be reimbursed; such as the use of the car people insisted on doing, then Party B and the use of the car people *** with the burden.
The part of the compensation cost that exceeds the amount of the insurance company's claim due to Party B's violation of the law shall be borne by Party B. The other consequences caused by the violation of the law shall be borne by Party B itself. Any other consequences caused by the violation of the law will be the responsibility of Party B.
Article 20 During the working hours, if Party B is not sent to the car, it should wait for the car at the workplace designated by Party A at any time, and should not go out without authorization; if it comes back to the car, it should report to the supervisor immediately.
Article 21 Party B must carry a cell phone, keep in touch with Party A at any time.
Article 22 Party B after work, should be parked in the appropriate place for safekeeping, not allowed to use the car.
Article 23 Party B without the approval of the leadership of Party A, shall not be driving the vehicle to others to drive or practice driving; strictly prohibit the vehicle to the unlicensed personnel driving. No one shall use Party A's vehicle to learn to drive.
Article 24 Party B violates the above provisions, in accordance with Party A's relevant labor rules and regulations for punishment, "10,000 kilometers of driving safety awards" with reference to the Tongchuan Power Supply Bureau driver safety driving awards related to the implementation of the assessment methods.
Party A:
Party B:
Date
Transportation Contract Part 6Commissioned by (hereinafter referred to as Party A): Wuxi Huaguang Boiler Co.
I. Transportation content:
1, the name of the goods: weight:
2, to the place of arrival:
3, the total price of transportation (including the transport of goods insurance premiums): _______ Upper case:
II. 1, transported to pay 3% for the warranty, depending on the consignee unit of equipment payment in proportion to the synchronization of payment. Third, transportation requirements: 1, each batch of goods before shipment, Party B to Party A to issue a product shipping documents (in five couplets), and then to Party A warehouse to pick up the goods, pick up after the completion of the third in the product shipping documents (finished goods library) sign. 2, Party B with the car with the first two copies of the product shipment, which the consignment unit unit to the consignment unit for acceptance, the return of the bill of lading by the consignment unit to return to the signing of the acceptance. After all the goods under this contract are shipped, the freight charges will be settled with the return receipt. 3, Party B received a notice of transportation to Party A, must be within half a working day to Party A to issue a shipping order and at the latest within two days to Party A's designated warehouse loading shipment, and timely notification of the consignee unit to do a good job of receiving and unloading the car ready to work. If Party B is late for loading and shipping, it must get Party A's consent, otherwise it has to pay 500 RMB/day penalty to Party A. If Party A doesn't agree with Party B's delayed loading and shipping, Party B must load and ship the goods on the next day. Otherwise, Party A has the right to withdraw the shipment order of the goods and organize the shipment of the goods by itself, and the transportation cost incurred will be deducted from the total price of Party B's transportation. If the delayed shipment caused by Party B causes complaints from the consignee unit, resulting in damage to Party A's credibility and economic loss, Party A may pursue Party B's responsibility, Party B will bear the corresponding economic compensation, and Party A has the right to terminate the transportation contract between the two parties. 4, the loss of goods in the transportation process, damage to the Party B bear the responsibility for compensation. 5, Party B in the transportation of the contract for the carriage of equipment to the insurance company to insure the price of the equipment ___ million 100% of the transportation of all insurance, insurance zone for Party A warehouse to the contract specified arrival place of the delivery of the 10 days after the end. 6, in the process of transportation and loading and unloading, Party B occurred in the environmental safety accidents are Party B's own responsibility. This contract is in triplicate, Party A deposited two, Party B deposited a copy of the two sides signed and sealed into force. Party A: Party B: Representative: Representative: 20 months Party A: (hereinafter referred to as Party A) Party B: (hereinafter referred to as Party B) In accordance with the "Chinese People's Republic of China **** and the State of the contract law" and the relevant laws and regulations, the A and B adhering to the rules in accordance with the law, fair and just, Honest and trustworthy, the principle of mutual benefit and reciprocity, after full consultation, Party B is willing to undertake the small rice village road hardening project gravel and cement transportation, in order to be safe in the transportation process, on time, according to the quality, according to the amount of transportation tasks, specially entered into the following contract terms. I. Cooperation 1, Party A provides gravel and cement to Party B for transportation. 2, Party B cooperate with Party A to gravel, cement and other materials to the designated location. Second, the freight cost of each project point Third, freight settlement 1, Party B with Party A's "Wangmu County Village-level Public Welfare Construction Matters of Financial Scholarship Project Material Receipt" and "Wangmu County Village-level Public Welfare Construction Matters of Financial Scholarship Project Material Delivery List" and Party A for freight settlement. 2, Party A according to "Wangmu County village-level public welfare construction of a proposed financial subsidies for the project material application form" and "Wangmu County village-level public welfare construction of a proposed project material delivery list" after checking the transportation of a variety of materials according to the unit price of all the goods in the project acceptance of the settlement of the whole within one month all clear all the freight charges. Fourth, the rights and responsibilities of Party A and Party B 1, Party A issued the "Wangmu County Village-level Public Welfare Construction Matters of financial subsidies for the project material application form" and entrusted the representative and Party B to the gravel quarry or cement plant to load and ship the materials. 2. Party A and Party B should adhere to the loading moderation, and do people, car safety. 3, Party B should comply with traffic rules, orderly loading to prevent accidents. 4. Party B shall be responsible for all safety responsibilities during the transportation of materials in the whole project. V. Other 1. This contract is valid for 2 months. 2, the contract in quadruplicate, A and B each party, the town project office to retain a copy of the bottom of the county comprehensive reform office. Party A (official seal): _________ Party B (official seal): _________ Legal Representative (Signature): _________ Legal Representative (Signature): _________ _________ ____ ____ _________ ____ _________ Date