How to deal with severe water on road surface

How to deal with the serious water on the road? Methods are as follows:

Road surface water solutions:

One, Jiaozhou City, Yangzhou Road sewage pipe renovation project

In accordance with the requirements of the sponge city, the renovation and upgrading of the road drainage pipe, the new sewage main collection of sewage along the way to achieve rainwater and sewage diversion to improve the collection rate of rainwater and sewage in the city, and effectively prevent the accumulation of water on the road.

Qingdao, Shandong Province, Jiaozhou City, Yangzhou Road, most of the sections in the construction of the initial period did not do the soft foundation treatment, resulting in uneven settlement of the road, every rainstorm is prone to waterlogging, on the enterprise transportation and residents caused great inconvenience. Jiaozhou City Construction Bureau decided to vigorously implement the road smooth project, plans to implement the upgrading of roads and sewage pipes.

The renovation project uses the integrated prefabricated pumping station of South China Pump Industry to collect and elevate the rainwater and sewage on the road. Put into use, rainwater and sewage collection rate of more than 80%, greatly improving the beauty and cleanliness of the environment in Jiaozhou City, to provide residents with a better transportation environment.

Two, Heyuan Shengli Bridge rain sewage collection project

In order to prevent the new Shengli Bridge and Dongjiang East Road due to the accumulation of water affecting the road traffic, resulting in vehicle stalling, traffic congestion and other problems occur, improve the efficiency of rain sewage collection and discharge of the construction of the highway drainage system is an indispensable measure.

Huanan pump industry in the project demand for two sets of integrated sewage lifting pumping station solutions. The solution overcomes the problems of small installation area, high water table and manual real-time monitoring; the use of buried installation and anti-floating sinkhole; the use of intelligent monitoring system and remote management and control is to provide owners with unattended and remote control convenience.

The completion of the project means that the road from the root to avoid the occurrence of urban road waterlogging problems, to ensure the safety of the public travel, accelerate the development and construction of Jiangdong New District, improve the urban transportation planning skeleton road network.

Legal basis:

"The Chinese people*** and the State Road Traffic Safety Law" Article 3 Road traffic safety work, shall follow the management of the law, the principle of convenience to the public, to ensure that the road traffic in an orderly, safe and smooth.