Jinhua City Jinxi Sewage Treatment Plant
It is located in the land south of Jindian Village-Hudaxi (Luobu Town)
Total project investment: 83.41 million yuan, and the project construction period is about 2 years.
Scale: Daily treatment of 20,000 tons of domestic and industrial sewage
Engineering technology: The project adopts the A2/O process plan
Structures: According to the process flow, within the factory On both sides of the east-west trunk road are respectively arranged water inlet channels, coarse grates, water inlet pump rooms, fine grates, cyclonic grit chambers, water distribution wells, primary sedimentation tanks and A2/O tanks, secondary sedimentation tanks, and filters. pool, disinfection pool; at the same time, the power distribution room and fan room are arranged on the north side of the A2/O pool, the sludge concentration and dehydration machine room and the mud storage room are arranged on the north side of the factory (north of the primary sedimentation tank), and the biological deodorization tower is Located in the south of the mud storage tank (west side of the primary sedimentation tank)
Executive standards: First-class standard A standard for water pollutant discharge standards in the "Pollutant Discharge Standard for Urban Sewage Treatment Plants" (GB18918-2002) . After intensive treatment in "constructed wetlands", the water quality can reach the GB/T18921-2002 "Urban Wastewater Recycling - Water Quality for Landscape Environment" water standards for ornamental landscape environments.
Discharge method: Use the pressure pipe (DN1000) drawn from the sewage plant and lay it along Houda Creek for about 1.5km to the downstream of Qujiang River (the intersection of Houda Creek and Qu
jiang River the following).