Laboratory technician 2023 work plan template (selected 5)

How to write a work plan, many people write a work plan for the first time without much experience, then here I give you to organize the laboratory technician 2023 work plan template (selected 5) need to come and see it!

Part I: laboratory technician 2023 work plan

20_ years of laboratory in the hospital under the correct leadership of the leadership of the department of all staff *** with the efforts of the laboratory actively participate in the hospital organization of political activities and business learning, improve their own ideological understanding and service skills, improve the quality of the inspection team, set up a wholeheartedly for the people to serve the people's thinking, think of the patient's thoughts, urgent The patient's urgency, around the development of the hospital, and actively carry out all the work, the successful completion of the various tasks in 20_, now the 20_ years of work of the Laboratory Department is summarized below.

First, the basic situation

1, personnel: Laboratory 20_ years of new recruitment of two test personnel, currently **** 15 staff. Among them, 2 blood collection nurses, another 2 test personnel are not yet certified.

2, the administrative composition of the Department: now contains the Laboratory, Blood Transfusion, Pathology. At present, the laboratory under the clinical examination room, biochemical room, immunization room, microbiology room, prenatal screening room, HIV primary screening laboratory. In the case of fewer staff, more laboratories, work under pressure, in addition to completing the daily outpatient, inpatient routine testing work, but also completed the region's early childhood teachers and kindergarten students physical examination work and the region's women's two cancers screening and other inspection projects work.

Second, medical ethics and quality of care

The department has a strong sense of responsibility and dedication, enthusiastic treatment of every patient who comes to the examination, to do the patient's urgency, think of the patient's thoughts, wholeheartedly

for the patient's service. In order to ensure the quality of work, the staff of the Department of our efforts to complete the daily test work and various types of instruments daily calibration, quality control and other work to ensure that the test results are accurate and reliable.

In the work of the specimen does not meet the test requirements, patiently explain to the patient, and the patient to explain the reasons, to obtain the patient's recognition, re-retention of the specimen. On the work of the problems found in a timely manner to correct, and maintain close contact with the departments. The staff of our department strictly abide by the discipline, no late, no early departure, no crosstalk, no absenteeism, no major medical errors. At work, we pay attention to a variety of knowledge learning and accumulation, and constantly improve the comprehensive quality and working ability.

Third, the construction of the department

20_ years I introduced two medical testing undergraduates, to make up for the shortcomings of the department, is conducive to the optimization of the test process and improve the quality of service. In the first half of the year, our department sent a rural personnel, the second half of the year to send a further training personnel.

Fourth, the completion of the work

1, ___ years in the hospital under the unified deployment of my department, in the daily quality and quantity to complete a variety of daily routine work, and actively participate in the creation of three hospitals.

2, as of the end of December ___, the Department **** test specimens ___, compared with the same period last year increased by %. As the workload continues to rise, members of the department arrived early, delayed the end of work, serious testing, to ensure that the results of each day on time to send out, the patient service attitude has improved significantly; laboratory workload, more links, the slightest negligence in the work will cause great work hazards and will lead to misdiagnosis and misdiagnosis of the clinician, so the work of the staff of the department are strict implementation of the system of checking, including the patient's information

<

3, do a good job of maintenance and maintenance of the experimental instruments, the emergence of various types of failure, serious study, actively respond to the problem in a timely manner on their own or under the remote guidance of engineers to solve the problem, to ensure that all types of instruments of the Department of the normal operation, so as to ensure that the timeliness of the test results.

4, focusing on the quality of testing to ensure the accuracy of test results. Standardized clinical testing indoor quality control, while actively participating in the provincial clinical center, the Ministry of Health Clinical Center of the inter-room quality evaluation activities in the clinical examination, immunology, biochemistry, microbiology and blood transfusion and other professional project evaluation, have achieved good results, fully demonstrating the accuracy of the experimental program of the Department of the laboratory and with the province and the country's laboratories among the comparability.

5, strengthen the communication with clinical. In order to better serve patients and clinical, our staff actively communicate with the relevant departments. Problems found in the work, the main to contact the relevant departments of the medical staff, and actively coordinate to deal with a variety of problems arising in the work. At the same time actively with external units such as ___ Hospital, ___ Hospital and cooperation of independent laboratories to coordinate and deal with related issues.

6, the department's level of service continues to improve. All work to test the quality of the core, to avoid the occurrence of errors and accidents, insist that our medical staff have a high degree of service consciousness, and make every effort to improve the patient-centered service work. For the masses of hot and difficult issues, combined with the actual situation of the department to seriously study and solve, win the trust of patients.

Article 2: Laboratory technician 2023 work plan

20__ year is about to pass, thanks to the company to provide us with a platform for growth, so that I continue to learn in the work, continuous progress, slowly enhance their own quality and talent. Looking back, the company accompanied me through a very important stage of life, so that I know a lot. Here I would like to thank the company's leadership most heartfelt, with your assistance to make me more at ease in the work, but also because of your help, in order to make me in the company's development to a higher level.

In the past year, my main job is responsible for all incoming materials for environmental testing, followed by assisting the incoming inspection inspector for material inspection. In the work, closely around the company's central work, against the relevant standards, strict self-discipline, better completion of the work tasks. In style to comply with the rules and discipline, solidarity with colleagues, pragmatic, optimistic and progressive, always maintain a rigorous and serious work attitude and meticulous work style, diligence, hard work and do a good job of every job. In the incoming ROHS test and assist the incoming material inspector work seriously, positive attitude, thunder and lightning, the courage to take on the heavy burden, dare to be responsible, regardless of personal gain or loss, conscientious, hard-working and complete every job. At the same time to assist in feeding work, he insisted on working while studying, but also learned a lot of knowledge from, so that their overall quality level continues to improve. Always adhere to strict requirements for themselves, hard work, always bear in mind the company's system, wholeheartedly for the purpose of the company's services. In their own ordinary and ordinary jobs, and strive to do their own work and leadership arrangements for each task.

In general, a year, the strict implementation of the company's rules and regulations, better fulfillment of the duties as a ROHS tester professional and technical positions, but also better completed the work of the year.

With the implementation of the company's systems, it can be expected that our work will be more heavy, the requirements are higher, the need to master the knowledge is also higher and wider. To this end, I will work more diligently, study hard, and strive to improve the quality of culture and a variety of work skills, for the company to make due contributions. Fully aware of people's strengths, use people's strengths, gather people's strengths, show people's strengths to give full play to their subjectivity and work enthusiasm, improve their overall quality, so that their ability to work stronger and more perfect. I fully realize that I am not only a ROHS tester, but also an implementer of ROHS directives. In the subsequent work I will work for their own development of new goals and efforts, that is, to step up learning, better enrich themselves to meet the challenges of the new period with a full state of mind. To improve my future work to do the following points of the plan:

First, in their own jobs to better fulfill the duties of the tester's professional and technical positions, so that all employees to understand why our company to implement the ROHS Directive, the implementation of the ROHS Directive on what we have the benefit of.

Second, seriously collect all information and data, comprehensive and accurate understanding and master all aspects of the work carried out, analyze the main problems of the work, summarize the work experience, and timely report to the leadership, so that the leadership as far as possible to comprehensively and accurately understand and grasp the actual situation of the recent work, in order to solve the problem to make rapid and correct decision-making.

Third, in the work of a clear programmatic work ideas, good work methods and work efficiency, on time or in advance to complete the work assigned by the leadership.

Fourth, to seriously study the work-related professional knowledge and related theoretical knowledge. In the learning method to do in the focus to find the focus, and combined with their own in the actual work of dealing with a variety of abnormalities, targeted learning, and constantly improve their office capacity.

Fifth, the leadership assigned to each task, to prioritize, rationalize time, on time, quality and quantity to complete each task.

Six, strict requirements for their own style, can comply with the rules and regulations, solidarity with colleagues, pragmatic, optimistic, always maintain a rigorous and serious work attitude and meticulous work style, always do honestly, diligently do things.

In the next year there will be more opportunities and competition waiting for me, I also secretly in my heart for their own drums. To stand firm in the competition. Down-to-earth work, the eyes can not be limited to the small circle around themselves, to focus on the big picture, focus on the future development. I will also learn from other colleagues, to complement each other's strengths and weaknesses, and exchange good work experience, *** with progress, and strive to achieve better results in the next year.

Part III: laboratory technician 2023 work plan

First, the purpose

According to the company's quality policy and quality objectives, develop and organize the implementation of the department's quality management plans and objectives, organize subordinates to carry out the standardization system to improve, maintain, and the standard management of the product, the product quality accidents, and so on; organization of subordinates to carry out the raw and auxiliary materials, finished products and the production process inspection, detection Organize subordinates to carry out raw and auxiliary materials, finished products and production process inspection, testing, etc., to ensure the fairness, accuracy and timeliness of the test results, control testing costs, improve efficiency and quality of service, in order to meet the needs of the company's various departments business and customer needs.

Second, the organizational structure

Due to the gradual expansion of the company's scale, more and more rich products, the volume of business will also be more and more, the focus of the work will change accordingly, in order to adapt to the current needs of the production, the temporary organizational structure is shown in Figure 1 below, and the subsequent need to increase the number of inspectors

I hope to increase the quality of the inspectors required to be a bit higher, and then the existing quality control inspectors and then training can only be done to prevent defective shipments. To prevent the shipment of defective products, but not

The plan will be in the late development of the organization needs, the quality of the Department of Quality also need to establish the supplier quality management, shipping inspection, etc. Therefore, the quality management is increasingly need to be systematic. Therefore, the quality management work more and more need to systematize, standardize.

Third, personnel planning

The number of people planned for 5:

1, IQC inspection of incoming material from the current number of 2 people to 5 people. And set up a special IQC feed inspection team.

2, IQC incoming material defective batch number target of 94%, in order to achieve this goal, the need for a professional SQM engineers for the management of the supplier's counseling, and this person also served as IQC team leader.

3, in order to enhance the quality of the Department of data analysis to improve the ability to improve the company's ISO program, the need to add a quality clerk, and this person also served as a clerical control

4, in order to reduce the quality of product development in the existence of hidden dangers, to enhance the quality of the process of control ability to reduce the bad complaints, to deal with the abnormalities in the process of outsourcing the production of the quality of the supervisor is directly responsible for.

5, each stationed in the factory needs to be configured with a full range of skills stationed supervisor and two quality inspectors, in order to achieve the goal of monitoring the quality of the stationed

Fourth, the regional planning

With the company's growing, the company's quality management system is more and more perfect, the quality of the Department of the increasing number of personnel, the existing quality of the Department of the work of the region can not be adapted to the needs of the day-to-day development, so the quality of the Department needs to be more and more perfect. Development needs, so the quality of the Department needs a relatively independent, able to accommodate a sufficient number of personnel work area.

V. Departmental responsibilities

In order to implement the quality management system, to promote the company's product quality management and quality improvement activities, to ensure that the customer to provide satisfactory products and high quality service, in order to achieve the company's interests, the following responsibilities:

1, the implementation of the company's quality policy, and constantly improve the company's quality assurance system documents to ensure that the ISO9001: 20__ quality management system can continue to operate and effectively implement the quality management system. Quality management system can continue to run and effective implementation.

2, according to the company's quality objectives, supervise the departments to establish the relevant quality objectives, is responsible for the assessment of the quality management work of the departments, and according to the actual performance and order situation organization review, planning.

3, responsible for the company's various quality management system development and implementation, organization and promotion of various quality improvement activities.

4, the establishment of quality management responsibility system, the implementation of the relevant departments (people), the establishment and improvement of the quality assessment system approach, the implementation of each process to strictly control, so that everyone has the responsibility, everything has a basis, the operation has standards, layers of supervision.

5, the development of the department's assessment system, the organization and implementation of performance management; and to provide the quality of statistical data, with the Ministry of Administration of the performance assessment process supervision of the various departments.

6, with the business of customer complaint handling, leading the analysis of the cause of the anomaly and will improve the practical implementation of measures to verify, reduce internal and external customer complaints, and continuously improve customer satisfaction.

7, responsible for the preparation of annual, quarterly and monthly product quality statistical reports, the establishment and standardization of the original inspection records, statistical reports, quality statistics audit procedures, product quality indicators for statistics, analysis and assessment, and proposed measures to improve product quality.

8, responsible for regular quality reporting. Regular oral or written reports in production meetings, for major quality accidents, the organization of thematic analysis will focus on reporting, special emergency situation to the upper level.

9, in accordance with the quality of accident handling regulations are responsible for the investigation and handling of quality accidents in the company.

10, responsible for related documents, records, information management, to ensure that the product realization process of traceability.

11, and other departments related to the coordination of work management.

12, to complete the superiors temporarily assigned tasks.

Part IV: laboratory technician 2023 work plan

20__ years, our quality management office will be based on the company's annual work points, closely around the company's "reform, development, quality, efficiency" of the overall requirements, and seriously do a good job in the management of the quality system, and actively develop quality management activities to ensure that the company's staff education and training quality management system sustained, effective and efficient. Education and training quality management system continues to operate effectively.

First, strengthen the management of the department, and strive to improve the overall quality and management level of departmental personnel

This year will be based on the overall arrangement of the company's learning program, seriously organize the department's staff to skills learning, so that departmental personnel can be in-depth company's routes, policies, policies, pay attention to current events, and keep abreast of the times. And combined with the characteristics of the department's work and practical experience, and constantly strengthen the sense of service, quality awareness, while improving the level of management, seriously study the quality system documents, in-depth study of new ways and means of quality management, and constantly improve the overall quality, and strive to promote the quality of my department's quality management work to a new level.

Second, increase the implementation of the quality system, and further strengthen the quality awareness of all staff

This year, the Quality Management Office will carry out a variety of quality management activities, the controlled departments to further strengthen the system documents and learning guidance, and require the controlled departments and sub-contractors to the personnel belonging to the centralized study on a regular basis, the new introduction of personnel, transfer personnel in a timely manner for quality training. The controlled departments and subcontractors are also required to conduct regular centralized learning for their personnel and timely quality training for newly introduced personnel and personnel changing jobs. Through various forms of publicity, efforts to make the controlled departments and personnel can timely and accurately grasp the revised documents after the external audit, the new part and even the entire system document content and features, strictly according to the document requirements to carry out their daily work, and further strengthen the quality consciousness of the whole staff, to ensure that the company's quality system is sustained, effective operation.

Third, seriously organize internal audits and management reviews, strict implementation of quality management

According to the provisions of the company's internal quality audit procedures and management review procedures, this year, the Department plans to arrange two internal audits and a management review of the work of the Quality Management Office will be from the quality of the activities of the organization, to carry out the form, the content and the audit, review process of all aspects of standardization. Strict implementation of document requirements and quality management. The focus of the internal audit is to audit the compliance of the system documents and implementation of training, check the filling of quality management records and the correction of non-conformities, and check the effectiveness and continuity of the quality system operation. At the same time, it assists the relevant functional departments to carry out assessment work on the services provided by subcontractors. When non-conformities and defects are found in the internal audit, corrections will be supervised in a timely manner. In the management review, the effectiveness of the quality system operation will be analyzed and evaluated, the problems emerged in the internal audit will be studied and improved, and the causes of non-conformities and defects in the system operation will be analyzed. And will summarize the experience through the management review work, for the next year to carry out quality management work to provide reference.

Fourth, do a good job in the preparatory work, promote quality management staff

This year, the Office of Quality Management will be based on the requirements of managers, and strive to promote quality management staff work. First, seriously carry out surveys and studies, take the initiative to contact with the competent departments, to brother companies to visit and learn; Second, according to the institutional setup of our Department and the actual work, the development of full quality management of the feasibility of the program, to adopt a new management model. The third is to implement the drafting, compilation and finalization of quality documents.

Part V: laboratory technician 2023 work plan

20__ year inspection center closely around the overall work of our hospital arrangements and deployment, summarize the 20__ work experience, for last year's work deficiencies in the work of the 20__ year work, the inspector's personal work plan.

A daily work plan

1, to strengthen the undergraduate study, awareness-raising, change the way of learning, focusing on effectiveness, the use of theoretical, operational and on-site questioning to increase the three basics of training efforts to develop the assessment rules and incorporate into the performance to go, and to comprehensively improve the business and technical skills of the department.

2, improve communication in the clinical, clinical to listen to a wide range of clinical test items and results of opinions, analyze, solve problems, and constantly improve the accuracy of test results, clinical services, establish the authority of the laboratory report.

3, vigorously carry out the test of new projects, to be in the clinical examination, biochemistry, immunization, blood bank, etc. to enhance the test capacity. (Attached to the 20__ year test center to carry out new project plan)

4, to carry out the county town health center clinical testing inter-room quality control center work, to the grass-roots health centers to research and understanding of the laboratory set up, staffing, laboratory instruments, equipment, basic situation, to carry out the test project, indoor inter-room quality of the work of the difficulties that exist in the specific circumstances of the hospitals, tailored to the design of the test projects The correct guidance and help the town health centers in the actual operation of the process of difficulties and problems, regular and irregular on-site guidance in the countryside, so that the town health centers in the optimal state of testing, so that the test results are more accurate.

5, do a good job of biosafety protection, occupational safety exposure prevention, to eliminate occupational exposure events. Do a good job of monitoring nosocomial infection in January, especially the key departments to monitor the work, to prevent the occurrence of nosocomial infection.

6, grasp the blood transfusion link quality control work, standardize clinical rationality, safe use of blood, component blood transfusion rate of 95% or more.

Second, the direction of the work in 20__ years

1, improve the quality of service in the window of the test center is mainly the window image, test report timeliness, accuracy. Develop measures to implement the responsibility, specific assessment to each shift each person, linked to performance.

2, to strengthen the bacteriological room bacterial culture and drug sensitivity experiments accuracy, improve the operating system and methodology, work plan "test personnel personal work plan. Standardize the rational use of antibiotics in our hospital, as well as antibiotic resistance monitoring and the national bacterial resistance monitoring network report.

3, grasp the inspection link quality management and quality and safety education to prevent errors, disputes, accidents.

Third, 20__ years to enhance the technical capacity of the test center and the level of a few ideas

The main purpose is to work with the clinical line of work to carry out testing projects to enhance the testing capacity

1, the use of new testing techniques and methods to carry out testing of new projects, such as the use of atomic absorption spectrometry to measure trace elements to improve the accuracy of the use of urological sedimentation technology to detect the urine type of components, to improve the positive rate of urine testing, to reduce leakage, and to improve the accuracy of the test results. Improve the urine test positive rate, reduce the leakage rate. At present, I can use qualitative analysis of d-d dimer, fibrin (original) degradation product fib is not conducive to the diagnosis of dic, can not reflect the severity of dic, especially in the process of thrombolysis in the use of drugs before, during and after can not dynamically detect the d-d dimer and fib concentration changes in the monitoring of thrombolytic drugs and the safety of the effect of the use of quantitative analysis of immunoturbidimetric analysis can solve the problem, the value of clinical practice The clinical utility value is greater.

2, with the emergency department, cardiology emergency rapid diagnosis of acute myocardial infarction to carry out infarction 5 ck, ck-mb, myoglobin, troponin, ultrasensitive - crp technology in clinical use.

3, with the obstetrics and gynecology, pediatrics to carry out screening for hemolytic disease of the newborn, to prevent the occurrence of hemolytic disease of the newborn caused by the mother and baby blood type incompatibility. Improve maternal eugenics teratology 5, as well as the use of chemiluminescent methods to carry out (torch) test to improve the accuracy.