First of all, the cover should be filled in at least the name of the project, the project? No., floor area, total cost, the name of the preparation unit and the person in charge and the date of preparation, the name of the review unit and the person in charge and the date of review.
1, project profile: project name and number, construction unit, structural form, floor area, number of floors, project category, fee categories
2, the basis for the preparation of: the source of the design drawings, the design unit, the quota and fee standards used
3, the people, materials, machinery, price adjustments explained
4, extra-budgetary project visa
5, the preparation of the budget on the drawings are not clear or contradictory places, and the preparation of the method of treatment
6, write a single (bit) of the project cost and the cost of a single party
7, when there is a similar landmark project comparable to analyze the reasons for the high or low cost
PS: Article 4 is usually found in the preparation of the statement of settlement.
Article 5 and 6 should be emphasized, this point will make the demand side feel that you do the budget or settlement is very serious, to win the good impression and trust.
Article 7, this is a higher level of requirements, in fact, regardless of whether the analysis is very reasonable and accurate, to make such an analysis and judgment, and did not make an analysis and judgment of the budget, settlement book, is the two essential differences. One is simply to cope with the work, one is for the demand side as much as possible to provide professional services and professional opinion of the work, the other side will be how to see?
Question 2: how to write the tender offer description Tender offer description
1, this offer is based on the relevant provisions of the Instructions to Bidders for this project and the text of the contract for the preparation.
2, bill of quantities bidding table filled in the comprehensive unit price and the total price include labor, materials, machinery, management, profit, taxes and the use of fixed-price engineering measured risk of gold and other costs.
3, measures to fill in the project price list of measures to offer the project. Including the cost of measures that must be taken to complete the construction of the project.
4, other items filled in the price list of other items bid, including the bill of quantities and measures outside the project price list, to complete the construction of the project must be incurred in other costs.
5, the bill of quantities of each single item should be filled in the bill of quantities and price, the cost of the project did not fill in the bill of quantities and price of the project, is considered to be included in the bill of quantities of other unit price and price.
6. The currency of this quotation is RMB.
7. The bidder shall submit the matters that need to be explained in the bidding quotation in writing together with the bidding quotation form.
Question 3: Please ask how to write the preparation of the tender instructions ah Preparation Instructions
I. Construction project design information based on and symbol:
1. design commission and or higher authorities to approve the document, engineering geological survey report, survey report number 2004-04-K08
2. according to the bidding unit to provide the bill of quantities, construction drawings, bidding documents and related information and instructions for quotation
3. according to the "construction project quantities List Pricing Code" (GB50500-2003) and 2003 "Hubei Province, the construction project consumption quota and unified base price table", "Hubei Province, the decoration project consumption quota and unified base price enamel", "Hubei Province, the installation project consumption quota and unit valuation table" "Hubei Province, the cost of construction and installation project quota" compiled
II. Adoption of quotas, cost standards, labor, materials, machinery unit price unit price based on:
1. According to Hubei Province, "Consumption Quotas for Construction and Decoration Works", "Hubei Province, the cost of construction and installation works quota" compiled
2. This offer of labor, materials, machinery, in accordance with Wuhan City, construction cost management information in accordance with the guiding price of the year 2008 adjusted
III. The main content of the commission, agreement and minutes related to the budget:
1. XXX budget commission
2. XXX budget agreement
3. XXX budget minutes
4. Total budgeted amount, total amount of labor, steel, cement, wood, and asphalt:
1. Total budgeted amount: $547,083.77
2. Labor: $143,462.52
3. Cement: $19,286.12
V. Other matters related to the budget but can not be reflected in the table:
1. The fire resistance level of this project is Grade II
2. The seismic strength of this project is 7 degrees
3. All the windows are equipped with railings at the height of the window opening of less than 0.8 meters
4. Indoor doors and windows are cream-colored
5. Handrail of the window guardrail is a wooden handrail
Almost like this, can be changed
Question 4: "Standard Preparation Instructions" mainly includes what content "Standard Preparation Instructions" mainly includes the following ten aspects:
(a) a brief description of the work, including the source of the task, collaborating units, the main work process, the main drafter of the national standard and the work they have done, etc.;
(b) national standards compilation Principles and determine the main content of national standards (such as technical indicators, parameters, formulas, performance requirements, test methods, test rules, etc.) of the arguments (including tests, statistical data), the revision of national standards, should be added to the old and new national standards level of comparison;
(c) the main test (or verification) of the analysis, synthesis report, technical and economic justification, the expected economic effects;
(d) the extent of the use of international standards and advanced foreign standards, as well as comparisons with the level of international and foreign standards of the same kind, or with the test of foreign samples, prototypes of the relevant data comparison;
(e) the relationship with the relevant existing laws, regulations and mandatory national standards;
(f) the handling of major disagreements after and on the basis of;
(vii) National standards as mandatory national standards or recommended national standards;
(viii) implementation of national standards and measures proposed (including organizational measures, technical measures, transition methods and other content);
(ix) abolition of the existing relevant standards proposed;
(x) other matters that should be clarified.
Question 5: the difference between the main set of conditions and the preparation of instructions Instructions for the preparation of tenders Tenders:
1, the bidding unit must fill in all the documents in accordance with the contents of the tender specified in several formats.
2, for the tender in the multi-selected columns, using the selected number on the check mark to determine. Documents in the first appearance of foreign language terms, to write the full name and abbreviation, and then the same word can be used when the abbreviation.
3, the tender are using A4 paper, fill in the content to be printed to fill in, for the length of the columns can not be enough to add their own page, the tender must be bound in order, and marked with a page number. Tenders need to prepare a copy of the original, copies of 10 points (respectively, bound), and down a record of the tender diskette (using word 97 or more versions).
Tender (bidding documents) tender is the tender unit in accordance with the conditions and requirements of the invitation to tender, the tender unit to submit the offer and fill in the tender sheet of the instrument. It requires sealed mailed or sent by hand to the bidding unit, it is also known as the bid letter. It is the bidding unit in the full understanding of the bidding documents, site visits and investigations based on the preparation of the bidding documents, is the response to the requirements of the tender notice and commitment, and at the same time put forward a specific price and related matters to compete for the winning bid.
Question 6: How to write the instructions for the preparation of the annual accounting statements for 2015 (a) Instructions for the preparation of the balance sheet 1. This table reflects all the assets, liabilities and owner's equity of the small business at a certain date. 2. The current figures in the "Beginning Number" column of this table should be filled in according to the figures listed in the "Ending Number" column of the balance sheet at the end of the previous year. If the name and content of the current year's balance sheet with the name of each item is not consistent with the previous year, it should be
Question 7: how to write the budgeting instructions for the renovation of roughly
First, the project overview:
1. Project name:
2. construction scale:
3. construction unit: 4. design unit:
5.
5. Preparation content:
2. Preparation basis
1. Basis for calculation of quantity:
2. Adoption of list pricing:
3. Price of materials:
4. Taking standard
5. Basis for taking the price of materials
3. Other (need to be clarified)
Question 8: What should be written in the description of the preparation of tenders Description of the preparation of tenders Description of the preparation of similar construction organization design
You can describe the characteristics of the tender preparation of the basis for reference to the information corresponding to the bidding documents and so on