What information is to be done for manually bored grouted piles, high pressure rotary piles, and low pressure grouted holes? How to write the acceptance part of inspection lot? Is it divided by pile n

What information is to be done for manually bored grouted piles, high pressure rotary piles, and low pressure grouted holes? How to write the acceptance part of inspection lot? Is it divided by pile number? The form of drilled piles is as follows, rotary spraying and grouting have not done not clear. It is estimated that with the grouted piles are similar.

Supervision-02 form engineering subsection start application approval sheet

Supervision-07 form intermediate handover certificate

Bridge evaluation-02 form steel processing and installation quality inspection assessment form

Bridge evaluation-13 form drilled piles quality inspection assessment form

Supervision-03 form inspection application approval sheet

Bridge construction-02-1 form drilling Record Sheet (Impact Drilling)

Form 02-2 Original Record of Drilling (Rotation Drilling)

Form 02 Original Record of Hole Inspection of Drilled Pile

Form 03 Approval Sheet of Inspection Application

Form 05 Original Record of Reinforcing Steel Construction

Form 01 Original Record of Inspection Sheet of Drilled Pile after Final Hole and before Filling Concrete

Form 01 Original Record of Inspecting Drilled Piles<

Supervision - 03 Form Inspection Application Approval Sheet

Bridge Construction - 06-1 Form Concrete Construction Original Record

Bridge Construction - 04 Form Submerged Concrete Grouting Construction Original Record

For example: acceptance of reinforcement inspection lot will be written in Grouting Pile 0-1

Bridge regulations require a single pile to write a single piece of information