Environmental testing department year-end summary (Selected 5)
Along with the approach of the New Year's bell, the work of the year will come to an end, review the work of this year's history, pay efforts, but also harvested the growth of the year, it should be summarized in this year's gains and losses for the next year's work to lay the foundation. But the year-end summary to write what content in order to make people's eyes shine? Here is my help to organize the environmental testing department year-end summary (selected 5), for reference only, welcome to read.
Environmental testing department year-end summary 1
20xx year has passed, our indoor environment energy saving mechanical testing department in the company at all levels of leadership care and support basically completed the work of the unit leadership arrangements. In the work has made certain achievements, there are also many problems. The work of the year is summarized as follows:
Efforts to complete their respective tasks, indoor environmental energy-saving testing department and building materials testing department of the joint office, under the leadership of the deputy general manager of the high rock to carry out their work smoothly. Over the past year in the efforts of everyone, well completed the detection of the task of the departmental arrangements. Detection work basically get customers and the satisfaction of the higher authorities, I would like to express my personal thanks to my comrades in the group testing!
Indoor air pollutant detection, so far **** detection of fifteen units of engineering. We can take samples on time, testing timely issuance of test reports, so that customers get satisfactory results. Encountered a lot of problems in the detection work, I and Liu, Jiang and I can *** with the study of standards, improve the standard detection methods and detection means. Improvements to the operating procedures of the gas chromatograph, now basically able to meet the requirements of the testing standards, so that our department to further do a good job of indoor air testing has laid a very good foundation.
Building energy testing is a project that we have just come into contact with, I play the intention of the Spring Festival to organize the department to further study the standards and practical operation, as soon as possible, so that we can master the detection method, can carry out their respective testing projects.
In short, the past year in the unit of leadership concern and comrades' efforts under the department's work can be carried out smoothly, I believe that next year our department will further improve the level of detection, and constantly strengthen the detection of the strength of the work of the indoor environment and energy-saving testing work better, for our testing company to make greater contributions.
Environmental testing department year-end summary 2
Time is like a shuttle, in the blink of an eye 20xx year has passed half, looking back on the first half of the work experience, I can not help but feel a lot of emotion, can be described as experiencing a period of extraordinary trials and tribulations.
By July, I came to xxx work just one year anniversary of the whole year's work exercise, so that I feel proud, completely off the student era of petulance, now I am more mature, more responsible, and more aware of the work to do a good job is not easy.
The first half of this year, deducted in our engineering department each colleague head only two words "acceptance", it can be imagined that this whole half of the time our work focus is on last year's "xxxx" construction project acceptance. According to the arrangement of the leadership of the engineering department, I was assigned to the project team of xxx area, so my main task is to assist xxx area project manager xxx to complete the acceptance of the online monitoring project in xxx area. Maybe I am more experienced in the acceptance of flue gas online monitoring project, so at first I have been assisting the acceptance of xxx project in xxx area, despite the pressure and intensity of the work is very big, but with dedication and sense of responsibility, and actively cooperate with the monitoring station, finally it is still better to complete the acceptance of the task of the xx and xx area, during the period, I also went to assist the acceptance of the flue gas in xxx area for two weeks. During this period, I also went to assist the flue gas inspection of XXX area for two weeks, and of course I did my best to assist Wang Lei's inspection work. Since May 12, I returned to the Shaoxing area project team, at this time is the xxx area acceptance of the most urgent time, everyone feels the pressure on the body is huge, but we did not flinch, we all feel that the upper and lower screwed together, fight 20 days will be able to complete the acceptance of the task, as a member of the Shaoxing area project team more aware of the need to work hard again and again, to share the pressure of the project manager's work, during the xxx During the period and the operation and maintenance department colleagues together with the excellent completion of the acceptance task, involved in a number of flue gas online monitoring project renovation and acceptance, during the period of TianLiFeng also arranged for me to go to complete the ShangYu 12 enterprises of the water quality online monitoring project acceptance of the work of the comparison, I overcame all the difficulties in a short period of time on the completion of acceptance of the work of the comparison.
The six months can be described as high-intensity work, for my young people in the field is quite rare exercise, I am also very satisfied with their own performance, "the pressure is motivated", this sentence is indeed justified. Winning is not proud of losing is not discouraged. The second half of the work of the task is still quite heavy, xxxx project follow-up rectification, the recovery of the final payment, there are new construction projects, etc., the next work will certainly be more difficult, I know that my duty is to assist in obeying the work with the project manager, more efforts, more passionate, and I believe that we can certainly do a better job and make a greater contribution to the company.
Environmental testing department year-end summary 3
xx year city environmental monitoring station in the city environmental protection bureau under the leadership and guidance of the higher business authorities, in order to ensure the completion of the routine monitoring tasks under the premise of the city's environmental protection work closely around the key tasks, with the total amount of pollution monitoring as the focus of the monitoring of surface water and drinking water as the basis for routine monitoring, close cooperation with the construction of project environmental assessment and acceptance of the completion of environmental protection facilities, and actively do a good job of environmental pollution work, the work of the environmental assessment and acceptance of environmental facilities. Work, and actively do a good job in environmental pollution emergency monitoring, and constantly strengthen the monitoring capacity building, in providing technical support, technical services and technical supervision has done a lot of fruitful work. Now the specific work is summarized as follows:
First, to provide technical support and services as the goal, the monitoring plan is fully completed
(a) continue to do a good job of monitoring the quality of the urban atmospheric environment and the quality of municipal surface water environment monitoring. Urban air quality monitoring 2 points, 3 major projects, I station *** to the city issued urban air environment weekly report of 52 issues, access to the results of the data 1144, city surface water for the provincial monitoring network, urban centralized drinking water reservoirs every single month for routine monitoring, *** access to the results of the data 1728. The entire routine monitoring work to achieve accurate spotting, standardized operation, reliable data, reported in a timely manner.
(B) the total amount of pollution sources in an orderly manner to monitor the work. The total amount of pollution sources throughout the year to complete the task of monitoring 160 (times), including 24-hour continuous monitoring of 14 enterprises (times).
(C) completed construction projects, "EIA" basic monitoring 21 (times), completed nearly thirty reservoirs, "EIA" monitoring, completed construction projects, environmental protection facilities, acceptance monitoring 7, while cooperating with the city monitoring station to start the environmental protection facilities of the mines The company has completed two coal mine acceptance monitoring, and a number of mine acceptance monitoring will be launched soon.
(D) strengthen the emergency monitoring of sudden pollution incidents. The annual 27 pollution accidents emergency monitoring, can do a rapid response, timely in place, for the elimination of pollution hazards, determine the scope of pollution and the degree of pollution to provide accurate and effective `monitoring data.
(e) completed indoor air quality monitoring and other commissioned monitoring 6.
(F) in the city's "two exams" during the organization of noise monitoring task force to participate in the noise inspection work.
(vii) completed 41 small construction projects environmental impact assessment.
(h) actively assist with the preparation of the Bureau's "Eleventh Five-Year Plan", for the completion of high-quality planning for a lot of basic work.
Second, to strengthen management as the focus of the overall enhancement of the work of synergy
This year, I station in the multi-faceted assessment of advanced units of quality assurance system, combined with the actuality of my station, which lasted more than five months, the revision of the "City of Environmental Monitoring Quality Management Manual", **** there are 21 types of procedural documents, so that the work of environmental monitoring is more systematic, Scientific, all work procedures of the station are controlled by the Management Manual, monitoring work is more standardized, institutionalized, standardized. Second, according to the guiding ideology of the employment reform, in order to deepen the "more work, more pay, less work, less pay, no work, no pay" principle of distribution, to improve the site staff work enthusiasm and initiative, the station will study the development of quantitative assessment of the monitoring work program, the realization of the workload and work and quantitative assessment of the ease of work and quantitatively linked to the workload of the whole station staff work enthusiasm, The sense of responsibility of all station staff has been significantly enhanced. Third, the establishment of the station team weekly rotation assessment system, focusing on the assessment and evaluation of departmental duties and responsibilities, monitoring work quality assurance measures, the implementation of rules and regulations, as well as on and off duty attendance and work discipline. Through the management of the above long-term working mechanism, the work style and work force of the station have been further improved. Fourthly, we actively strive for funds for emergency monitoring instruments. Since two 0xx years, in order to enhance the level of emergency monitoring capabilities, and actively seek funding, instrumentation support, has been from the Provincial Environmental Protection Bureau to the value of 200,000 yuan of instrumentation to fill the station in the important monitoring program, instrumentation on the blank, strengthen the scope of environmental monitoring and emergency monitoring capabilities.
Three, to monitor the quality of the core, strengthen the quality control and assurance
First, to strengthen the comprehensive analysis of the environmental quality of the ability and level. Our station pays special attention to the comprehensive analysis of environmental quality, in order to do a good job of environmental quality status quo evaluation based on the focus on strengthening the analysis of the pattern of change in environmental quality, environmental quality change causes analysis and total analysis, and constantly improve the level of service for environmental management and leadership decision-making. Second, strengthen the environmental monitoring station three audit system. I station according to environmental monitoring quality control and quality assurance of the high standard of work, in the analysis process to strengthen the control of the password parallel samples. Thirdly, we have strengthened the sense of responsibility of sampling and analyzing personnel. We further revised and improved the monitoring and assessment system, strengthened the management of technical data, files, instruments, equipment and reagents, ensured the accuracy and fairness of the monitoring reports, and honored them in the salary assessment. Fourth, the measurement of certification supervision and inspection as an opportunity to comprehensively check and rectify. Through on-site supervision and inspection, the inspection team that: laboratory management standards, to meet the requirements of measurement certification, individual projects need to be improved. According to the requirements of the on-site inspection team of measurement certification, I put forward a practical rectification plan, and reported to the Municipal Bureau of Technical Supervision. Fourth, comprehensively strengthen the standardized laboratory construction. According to the "environmental monitoring station construction standards (for trial implementation)" and "environmental monitoring station standardization construction standard acceptance approach" requirements, developed a scientific construction program, through self-checking, acceptance integration, rectification of the non-standard and need to strengthen the problem, so that the station's standardization of the construction of a new level.
Fourth, based on comprehensive services, to complete the task of service charges
xx year in the station personnel concerted efforts to do a good job of comprehensive services, increase the monitoring of charges to generate revenue, **** completed monitoring charges x million yuan.
xx year I station work basically completed, however, there are certain problems and deficiencies. Mainly: the lack of instrumentation, aging, backward, often because of hardware such as instrumentation and equipment and affect the normal work of monitoring services, especially in response to sudden pollution incident response capacity, the current conventional monitoring instruments have been unable to meet the sudden accident fast, accurate and targeted; monitoring station individual comrades poor sense of responsibility, there were several accidents of responsibility; monitoring and analysis of the level of the overall level is not high, and part of the comrade Business level needs to be improved; monitoring station in the redundant personnel, the current year to deepen the reform efforts are not enough, there is waiting, watching, relying on the idea.
xx year, we have to continue to carry forward the good work style, the effective exercise of government functions, and actively respond to the reform of institutions, give full play to the role of technical support and technical supervision, improve the system, strict norms, to grasp the good environmental monitoring is an important basis and means of environmental management and environmental law enforcement, is the most basic environmental protection department. To build a high standard of quality laboratory as the goal, unity, hard work, and strive to xx monitoring work in a new look, to a new level. The main points of its work are as follows:
1, in-depth study and seriously implement the spirit of the 18th Party Congress and the 18th session of the Fifth and Sixth Plenary Sessions of the Party, firmly established to adhere to the people-centered, comprehensive, coordinated, and sustainable concept of scientific development, and full service to the economic construction;
2, do a good job of the river four cross-sections, water quality in reservoirs and routine monitoring of air quality in urban areas, and regularly issued water quality bulletin;
3, strengthen the surface water quality monitoring of the water quality of the water quality, and regularly issued water quality bulletins;
3, strengthen the surface water and functional areas of air quality monitoring, analysis and evaluation, regularly complete the environmental quality report;
4, continue to do a good job of monitoring industrial pollution sources, from the concentration of monitoring to the concentration of the total amount of monitoring changes, and gradually realize the dynamic management of sources of pollution, and the full completion of the monitoring plan;
5, do a good job of monitoring the completion of environmental protection acceptance of construction projects to enhance the level of environmental supervision and management of construction projects to provide technical support;
5, to do a good job of environmental protection acceptance of construction projects, improve for the Construction project environmental supervision and management to provide technical support for the level and quality, in particular, to assist with the city environmental protection station on the completion of the city's mining construction project acceptance;
6, the organization of the monitoring of the task force to do a good job in rural drinking water sources of the environmental impact assessment of the basic monitoring;
7, according to the "Environmental Monitoring Station Construction Standards (Trial)" and "environmental monitoring station standardization of the construction of up to standard Acceptance" requirements, comprehensively strengthen the standardization of laboratory construction;
8, to strengthen the pollution accidents and environmental emergencies emergency monitoring capacity, to ensure the safety of people's lives and property, and effectively ensure that the monitoring, emergency response, information dissemination, and other measures are in place;
9, continue to strengthen the comprehensive analysis of environmental monitoring and evaluation of methodology study and research, to improve the level of comprehensive analysis of environmental quality;
9, to continue to strengthen the comprehensive analysis and evaluation methodology study and research, and improve Comprehensive analysis of environmental quality level;
10, continue to strengthen environmental monitoring quality assurance and quality control management, and in strict accordance with the "Quality Management Handbook" assessment and management;
11, to strengthen the construction of emergency response capacity of environmental pollution accidents, and comprehensively mapping out the hidden dangers of various pollution accidents, targeted environmental monitoring plan;
12, and actively do a good job in reforming business units Various preparations for the ideological and organizational foundation.
Environmental testing department year-end summary 4
20xx November to Zhenning Autonomous County Environmental Monitoring Station engaged in environmental monitoring work, under the correct guidance of the leadership of the Bureau, in the help and support of all comrades, obedience to the leadership, unity of comrades, conscientious study, solid work, on May 28, 20xx successfully passed the licensed on duty assessment. Experienced this licensed on duty assessment, I found myself more deficiencies and their own advantages. Now the specific situation is summarized and the next step for the future work.
First, lead by example, strengthen learning, and strive to improve business knowledge
In order to improve their own cultivation, I continue to strengthen their own learning, armed with theory, with knowledge to broaden their horizons, through learning to learn from the nutrients. Seriously study the "Environmental Monitoring Regulations", "Environmental Technical Specification", "water and wastewater testing and analysis methods", "air and exhaust gas testing and analysis methods" and other books, business literacy in the study has improved significantly. However, on the basis of strengthening the quality of their own business learning, require further enhancement of the initiative and conscientiousness of learning.
Second, hard to learn the monitoring technology level, to improve environmental monitoring capabilities
monitoring station technology responsible for the work of each monitoring task are seriously, carefully arranged, from sampling, analytical methods, quality control and quality assurance aspects of the strict gatekeeper; monitoring and analysis of the technical problems in the analysis of the in-depth analysis and discussion, find the cause, do not understand timely to the safety and security of the company. Find the reasons, do not understand in time to the comrades of Anshun City Environmental Monitoring Station to ask, timely solution. First, the state promulgated the relevant pollutant emission standards and monitoring technical specifications, they first read and absorb the serious discussion and implementation, for the monitoring station to successfully complete the monitoring tasks to lay a solid theoretical foundation. Secondly, we focus on the implementation of the "passing on" and "familiar with the new" projects in our station, so that the technically strong with the technically weak. Personnel have basically adapted to the monitoring work, able to independently carry out one or two experimental operations. Third, with the leadership to complete the standardized construction of environmental monitoring stations acceptance of the standard work. Under the leadership of the Bureau, I carefully arranged, carefully prepared, do a good job of instrumentation. Maintenance and repair, the establishment of a sound record of various forms and other basic information.
Third, there are shortcomings and future efforts
I have made some achievements in my work, but there is still a big gap between the leadership and the requirements of comrades: mainly theoretical knowledge learning is not tight enough, the speed and depth of the problems encountered in the actual environmental monitoring is not enough to lead to the monitoring of the work is not perfect. The work is not strong sense of innovation, creativity is not enough. In the future work requirements to further enhance the initiative to learn, self-awareness and practical operation.
In the future work, I will carry forward the advantages, to overcome the shortcomings, to work, highly responsible for the cause of the spirit, down-to-earth, conscientious and responsible to do a good job of work so that the leadership can rest assured that the comrades are satisfied.
Environmental testing department year-end summary 520xx year I station adhere to the direction of environmental monitoring for environmental management services, and strive to develop a new direction of environmental monitoring work, to ensure that environmental monitoring in the environmental management of technical support and supervision role, focusing on monitoring the self-construction of the technical staff, strengthen the management of environmental monitoring, improve the quality of monitoring, and the successful completion of the sub-bureau of the station's monitoring work and tasks, as follows.
Under the leadership of the station chief, first of all, the basic theory of learning and mastery of professional skills as the focus, pay close attention to the business training, monthly business studies are organized once a year to organize two basic theory and quality control and other knowledge exams, and the results will be credited to the individual technical file. Has sent people to participate in provincial and municipal professional and technical training courses and technical competitions. Among them, we won the second place of the group in the technical competition organized by the municipal station, and Comrade Liang Min of our station won the second place of the province in the technical competition carried out by the provincial station. Through learning and training, the monitoring staff of our station generally improve the quality of business. At present my station monitoring personnel all licensed, each monitoring project is more than two people licensed.
Second, strengthen the monitoring of quality management, strengthen the quality of service.
This year, the station set up a quality control room, by the quality of the person in charge of the director, is mainly responsible for the station's daily supervision and inspection of quality assurance, from the monitoring of the distribution point, sample collection, transportation, preservation, according to the monitoring of the norms of the layers of gatekeeper. In each business office has set up a quality control officer, the director of the room or the person in charge of technology, mainly to check the implementation of the daily monitoring of quality control in the room, check the operation process of analysts, the original records and so on. Thus, the monitoring of quality management work from the organizational structure to ensure.
Monitoring data adhere to the three levels of audit. At present, the basic formation of the station chief decision-making, the head of the organization and management of the business, the quality controller specific implementation of the three-tier quality management system. As a result of the above measures, the monitoring data from the beginning of the generation is under strict quality control, thus ensuring the reliability and accuracy of the reported data.
Third, the successful completion of the tasks assigned by the leadership of the Bureau
So far, the station has completed:
(a) the year quarterly monitoring report of the surface water out of Beihu District, and reported to the city station on time, the entire routine monitoring to achieve the accuracy of the point of reference, standardized operation, reliable data, reported in a timely manner.
(B) the total amount of pollution sources monitoring work. At present **** complete the task of monitoring the total amount of pollution sources 32 (times), including 24-hour continuous monitoring of enterprises 3 (times).
(C) in the city during the college entrance examination, actively participate in the college entrance examination control noise work
(D) for environmental law enforcement and sewage charging services, **** counted 8 times to provide technical services.
(E) did a good job of monitoring environmental noise in the region, completed the basic data 136. In the upcoming 20xx year, I station work arrangements are as follows:
1, continue to strengthen the monitoring staff business training, in addition to the station's own business learning people to participate in the provincial and municipal organizations of technical training.
2, improve the construction of quality management system, the formation of a complete set of effective quality management documents and procedures, to do each instrument to establish a file, including the use of instrument and equipment maintenance registration, instrument calibration cycle and the use of instrument marking management and other work, so that the use of instruments and equipment in the qualification rate and the completion rate of 100. improve the scientific, accuracy and timeliness of the monitoring report for the environmental management to provide fast and high-quality data. The monitoring report is scientific, accurate and timely, providing fast and high-quality data for environmental management.
3, increase investment in hardware, eliminating a number of outdated and aging monitoring instruments, purchase a number of advanced instruments. Strengthen the construction of the laboratory to provide a good environmental monitoring. Hardware environment.
4, to strengthen business contacts with other departments, with other departments to complete the tasks arranged by the Bureau. Under the leadership of the Bureau of the party group continue to carry forward the good work style, the effective exercise of their functions, improve the system, strict norms, in order to build a high standard of quality laboratories as the goal, unity, hard work, and strive to monitor the work of 20xx to a new level.
;