People's governments at or above the county level, other relevant administrative departments in accordance with the division of responsibilities, is responsible for the specific management and supervision of water conservation within the administrative area. Article 7 The water administrative departments of the people's governments at or above the county level shall implement unified scheduling and rational allocation of surface water and groundwater. Priority use of surface water, limit the exploitation of groundwater, encourage the use of recycled water. Article 8 The allocation of water resources should be the first to meet the urban and rural residents living water, taking into account agriculture, industry and ecological environment and other sectors of water. Encourage, cultivate and develop water-saving industries, in areas with insufficient water resources, moderate control of the size of the city, and restrict the construction of large water-consuming industrial, agricultural and service projects. Article 9 The competent department of water administration of the people's governments at or above the county level shall, in conjunction with the relevant departments at the same level, conduct regular surveys on the water use of various industries and the status of water use in residential life, and prepare regional and industrial water conservation plans for the approval of the people's governments at their respective levels. Article 10 The province of the total water use control and quota management system.
Provincial people's government of the relevant industry shall develop the administrative area of the industry water quota, reported to the provincial water administrative department and the provincial quality and technical supervision of the administrative department of the provincial people's government after examination and approval. Industry water quotas should be revised periodically according to changes in water demand, technological progress and economic development. Industry water quotas as a basis for determining the total amount of water users and approval of construction projects.
The people's governments at or above the county level, the competent departments of development planning in conjunction with the water administrative departments at the same level, according to the water conservation planning, water use quotas and the annual availability of water, the development of annual water use plan, the annual water use of the administrative area to implement total control. Article XI of the water supply units and water units should be November 15 of the year before the next year, water supply and water use plan application, in accordance with the water withdrawal permit hierarchical limits of approval authority, reported to the appropriate level of water administrative department for approval.
Supply and water plan issued, the need to adjust the supply and water plan should be one month in advance to the original approval department to apply for approval before adjustment. Article XII of water supply, water supply units and units of self-supplied water source to apply for an increase in the supply and use of water plans shall meet the following conditions:
(a) has been taken to conserve water measures;
(b) the water reuse rate, the unit consumption of water to meet the prescribed standards;
(c) the expansion of the scale of production and operation;
(d) does not affect the rights and interests of others in the use of water and the public * * *;
(d) the water supply and water use plan shall be adjusted. interests;
(e) water extraction unit that exceeds the amount of water specified in the original water abstraction license, has reapplied for the water abstraction license procedures. Article XIII of the project construction water units need to use surface water or groundwater directly, must have the right to water abstraction permits to the competent water administrative department to apply for a temporary water plan; need to use the urban pipe network water supply, must apply for a temporary water plan to the urban water supply authorities, and in accordance with the approved plan to measure the water.
The competent water administrative department, the urban water supply department shall, from the date of receipt of the application for temporary water use plan, be approved within 10 working days. Article XIV in the drought and water shortage season, when the urban and rural residents living water supply water supply is seriously insufficient, approved by the people's government at the same level, may take measures to temporarily restrict or suspend other non-living water. Article XV of the provincial price administrative department in conjunction with the provincial water conservancy, construction administrative department in accordance with the different water quality, different industries and the cost of water supply review the price of water supply, reported to the provincial people's government for approval. Article XVI of the production and domestic water consumption by water metering water charges. Article XVII of non-residential water units over the water plan or over the quota of water to implement progressive tariff system.
The gradual implementation of urban residents living water ladder metered water prices.
Over-planned or over-quota water use progressive tariff increase charges, by the provincial water conservancy, construction administrative department of the provincial price administrative department to develop. Article XVIII of the water user must be installed by the statutory metrological verification institutions for the first time mandatory calibration of water flow measurement facilities (appliances), not in accordance with the provisions of the installation of water flow measurement facilities (appliances) or not replaced in a timely manner has been damaged water flow metrological facilities (appliances), according to the design of the water intake building water intake capacity or intake of water intake equipment rated flow rate of the full-time operation of the calculation of the amount of water.
No water supply unit shall not be implemented on the water user water package fee system. Article 19 of the new construction, expansion, alteration of construction projects, shall develop water conservation programs, the installation of water-saving equipment and appliances, supporting the construction of water reuse and other water-saving facilities, water-saving facilities and the main project at the same time the design, construction, and put into use at the same time.
After the completion of the construction project, the water administrative department in conjunction with the relevant departments of water conservation facilities for acceptance. Failure of acceptance, not to issue water permits or water supply.
Construction projects have been completed, not installed to use water-saving water appliances, the property owner should be gradually replaced, and conditions should be constructed in the water reuse facilities.