Summer high temperature and heatstroke emergency plan (selected 5 articles)

Now that we have reached the Xiaoshu solar term, the weather will get hotter and hotter. Everyone must pay attention to preventing heat stroke in their daily work and life. So how should we write a better plan for heat stroke in summer? You might as well follow me and read "Summer High Temperature and Heat Stroke Emergency Plan (Selected 5 Articles)". I hope you will like it. You are welcome to read it! Summer High Temperature and Heat Stroke Emergency Plan (1)

In order to ensure the smooth construction of this project, ensure that when an emergency occurs during summer construction, emergency rescue work can be rapid and effective, and protect the lives and property of the enterprise and employees to the greatest extent For safety, this plan is specially formulated.

1. Summer is coming. The preparation of this plan will guide the development of heat stroke prevention and cooling work, prevent the occurrence of heat stroke accidents, protect the personal safety of employees, ensure the normal production of the project department, and ensure that various emergency resources are in place. A good state of readiness; and can guide emergency operations to be carried out in an orderly manner as planned, preventing delays in accident response due to ineffective actions or confusion in on-site rescue work, thus reducing casualties and property losses.

2. Establish a construction emergency leading group to be responsible for the command and coordination of emergency rescue work. The general commander of the leading group is responsible for implementation by the project manager. If the general commander is away, the deputy project manager will serve as the deputy general commander to implement it. When the deputy general commander is absent, the on-site technical person in charge will implement the implementation. For the implementation of rescue work, please refer to the emergency plan organization for specific personnel arrangements.

3. When various emergency symptoms of high temperature occur during project construction, our project department should immediately activate this plan after receiving the emergency report. Immediately seek help from the company's emergency rescue command center and "120" rescue center, and report the situation to the higher-level Work Safety Supervision Bureau, the Federation of Trade Unions and other relevant departments. After an emergency occurs, follow-up information should be continuously reported to relevant leaders and departments.

4. After an emergency occurs during construction, the project department will establish a rescue on-site command center as appropriate, with the person serving as the overall commander of the accident site and establishing the following leadership group:

1. Heatstroke prevention and cooling protection team. During the summer construction process, there are many open-air working environments during construction operations; complex and changeable personnel distribution areas; high labor intensity and other aspects have brought a lot of inconvenience to construction in the summer. In order to protect the legitimate rights and interests of workers and the safety of life and property, and create a secure and comfortable environment for workers, when workers have adverse reactions to high temperatures, the team leader will immediately organize the team members to transfer and control the accident workers. , to prevent the increase in accidents at surrounding construction sites. Make emergency operations more targeted and improve the efficiency of operations. To avoid causing huge accident losses.

2. Information liaison group. The team leader is responsible for understanding the casualties and economic losses and the scope of the emergency, organizing and collecting weather and temperature conditions every day, and then taking necessary preventive measures, and reporting the measures taken and the development of the situation to superiors and relevant departments in a timely manner. contact.

3. Security (vigilance) team. For security work in the evacuation area and resettlement area, the safety director serves as the team leader and organizes team members to monitor the development of dangerous situations to prevent them from affecting the construction period. Safety education is also strengthened for each team member to further enhance safety awareness and organize on-site Managers conduct safety inspections on construction sites to eliminate safety hazards to prevent the occurrence of serious accidents and how to minimize the impact of accidents once they occur.

4. On-site medical rescue team. When an accident occurs, the team leader organizes team members to conduct on-site classification and first aid treatment of the injured, and is responsible for providing effective first aid to the injured and transferring them to the hospital in a timely manner. The main responsibilities of rescue personnel are: to enter the accident area to rescue the injured; to guide people in the hazard area to carry out self-rescue and mutual rescue activities; to gather, count, transport and treat the injured. According to the specific situation, quickly formulate emergency response plans and organize their implementation.

5. Logistics support team. The team leader is responsible for organizing and mobilizing rescue personnel, materials and equipment, and supervising and inspecting the implementation of various emergency and disaster relief measures.

5. After various emergencies occur, the main professional rescue teams and emergency rescue supplies that need to be mobilized. The main materials and personnel responsibilities are arranged as follows:

The general office and the finance department are responsible for the procurement of items for the project department. The main drugs and medical rescue equipment are as follows:

1. Drugs: cold medicine, fever medicine, diarrhea medicine, anti-inflammatory medicine and other therapeutic medicines, as well as Rendan, Fengyoujing, Huoxiang Zhengqi water, chrysanthemum tea, fire-reducing herbal tea, green health food, etc.

2. Rescue equipment: single rack, small oxygen cylinder, earpiece, towel, medical kit, freezer (ice cubes), etc.

3. The project department will set up a medical room within the project department, and allocate full-time medical rescue personnel who have received professional training, passed the assessment, and hold certificates.

6. Heatstroke prevention and cooling measures

1. Strengthen the publicity of the knowledge of heatstroke prevention and cooling among employees, and carry out various forms of safety and health and summer health publicity and education activities to make employees understand summer safety Health care knowledge and improve self-protection ability.

2. Improve and implement the safety production responsibility system during high temperature periods, establish a heatstroke prevention and cooling leading group, formulate emergency plans, try to avoid operations during high temperature periods, and implement preventive measures.

3. Before the summer vacation, it is necessary to conduct health examinations for employees working in high temperatures, and employees with high temperature contraindications should be adjusted to their jobs in a timely manner.

4. We must actively take measures to improve the working environment and working conditions of employees, properly arrange employees’ working hours, strictly control overtime, pay attention to the balance between work and rest, and try to avoid personnel working outdoors in the open air. Work during hot hours at noon. Appropriately reduce the labor intensity of employees and create a good working and rest environment for employees.

5. Ensure that every employee is provided with heatstroke prevention and cooling products, try to provide employees with heatstroke prevention and cooling refreshments and medicines in physical form, control the quality of purchased goods, and eliminate counterfeit and shoddy products.

6. Ensure that temporary facilities such as dormitories, canteens, toilets, and shower rooms for construction workers meet standard requirements and meet the needs of heatstroke prevention and cooling. We must effectively carry out sanitation and epidemic prevention work at the construction site, and strengthen the supervision of drinking water, food, etc. Hygiene management; strictly implement the food hygiene system to avoid poisoning incidents caused by food deterioration; strengthen the monitoring of diseases prone to summer.

7. During the summer vacation, strengthen supervision and inspection of production safety, and promptly urge rectification of problems found to ensure production safety.

8. Post the contact information, alarm and emergency telephone numbers of the heatstroke prevention and cooling leading group members in the publicity column to prevent failure to get in touch in time when an accident occurs.

7. Rescue methods:

1. When on-site workers with mild patients experience dizziness, fatigue, or dizziness, the workers should stop working immediately to prevent secondary injuries. In the event of an accident, other surrounding workers should arrange for symptomatic persons to rest in a cool, well-ventilated area and provide them with cold water, wet towels, etc. And notify the medical rescue personnel of the project department to conduct observation, diagnosis and treatment.

2. Severe patients (fainting, shock, severe lack of water, etc.) When a person suffering from heat stroke occurs at the work site, people around the work should immediately notify the project department and promptly transfer the accident personnel to a cool and ventilated area. Observe the symptoms so that medical personnel can have first-hand treatment information when they come. The project department shall decide whether to initiate heatstroke prevention and cooling pre-emptive measures according to the specific circumstances and the emergency commander. And immediately organized rescue personnel to go to the scene to treat the accident victims. If the symptoms are severe and the medical equipment of the project department cannot treat them, they should be transferred to the nearest hospital for observation and treatment as soon as possible and reported to the company.

8. Follow-up work:

1. According to the principle of "four no-misses" for accidents, we should carefully investigate and handle the accident, take targeted preventive measures, and strengthen Promote and educate each team so that everyone understands the precautions during summer construction, so that everyone knows how to protect themselves and how to rescue others. Summarize experience and lessons to prevent similar incidents from happening again.

The specific preventive measures are as follows:

1) The information team will set up a thermometer at the construction site, collect and process the daily weather conditions, and then report it to the heatstroke prevention and cooling guarantee team of the project department. Take appropriate safety precautions according to the specific situation.

2) When the outdoor temperature is higher than 39°C, the project department should conduct special safety briefings on construction cooling for each team and order them to stop on-site construction operations.

3) The logistics support team should be able to ensure drinking water and emergency medicines for workers on site at any time.

4) The heatstroke prevention and cooling emergency rescue agency will develop a reasonable and effective "personnel work and rest schedule" based on the temperature conditions of the year to avoid the highest time of daily temperature (13:00 ~ 14:00 ) section to carry out construction work. After discussion by the project department, the project department’s construction work and rest schedule for the summer (high temperature months are July to October) has been specially formulated, as follows:

Project department’s work and rest time

Morning: 7 : 00~11:00 (four hours)

Afternoon: 15:00~19:00 (four hours)

Attachment: Overtime is required in case of deadline or other special circumstances At that time, further notice will be made.

5) The project department established a "special organization for summer construction heatstroke prevention and cooling".

6) Provide safety education to all teams in the project department to enhance the ability of workers to deal with various situations. Strengthen the publicity of summer construction safety, so that everyone can understand and master the safety knowledge of heatstroke prevention and cooling, and improve the adaptability and processing ability of workers in practice.

7) The project department will set up full-time medical staff to strengthen the publicity of medical rescue within the project, protect the lives of personnel, and create a humanized construction site.

9. Emergency recovery and re-entry

When the emergency is restored, the danger zone must be evaluated before re-entering, and the accident should be analyzed. Only when the danger zone has been determined to be safe You can enter the scene and continue the operation.

10. Emergency training and drills

1. Training

① Before the implementation of the project, the personnel involved in the construction of the project shall be educated on heatstroke prevention and cooling knowledge and learn about Common sense of heat stroke prevention and cooling and simple methods of heat stroke first aid are required to be used skillfully during construction.

② Study this plan so that employees know how to prevent and cool down heatstroke and how to respond to heatstroke events.

2. Drills

After the emergency plan and contingency plan are established, and after effective training, the project department conducts a large-scale rescue drill before the arrival of summer every year. At the end of each drill, a summary will be made in a timely manner, and any gaps that exist will be improved in future work.

1) Purpose of the drill

① Test the effectiveness and adequacy of emergency plans and implementation procedures.

② Test emergency equipment.

③ Ensure that emergency organization personnel are familiar with their tasks and responsibilities.

④ Test the coordination ability of emergency personnel.

⑤Identify and correct defects in the plan.

⑥ Test the adequacy and effectiveness of emergency equipment.

2) Emergency plan drills.

In order to improve the technical level of rescue personnel and the overall ability of the rescue team, so as to achieve fast, orderly and effective results in accident rescue operations. The project department carried out a rescue drill on x, x, 20xx. Emergency rescue training has become an important task for the rescue team. Therefore, the project department also emphasized the following three points during the emergency rescue process:

① During the drill, all personnel must arrive on time and wear their own protective equipment.

② During the rescue process, "self-protection and rescue of others" and active and effective rescue should be achieved.

③ Must strictly abide by the instructions of relevant leaders, "discuss truth from falsehood", and effectively implement rescue measures.

3) The basic tasks of emergency training and exercises are: to train or improve the team’s ability to quickly rescue and block sources in the event of an emergency, to promptly rescue the wounded, to correctly guide and help the masses to protect or evacuate, and to effectively eliminate harmful consequences. , carry out emergency rescue skills and comprehensive emergency response qualities such as on-site first aid and casualty transfer, to effectively reduce accident hazards and reduce accident losses. Summer High Temperature and Heat Stroke Emergency Plan (2)

In order to implement the spirit of the notice of the Education Bureau on heatstroke prevention and cooling work, ensure the health of teachers, students, and employees of our school and the orderly progress of school teaching, in the spirit of Based on the idea of ??"precaution is more important than Mount Taishan", combined with the actual situation of the school, the following emergency plan for heatstroke prevention and cooling has been formulated.

1. Organizational structure

1. The school has established a heatstroke prevention and cooling work leading group headed by the principal.

2. Carefully organize and study relevant documents on heatstroke prevention and cooling, report the situation in a timely manner, and ensure that the ideas, organization, and measures are in place.

2. Responsibilities of each department

(1) Political and Educational Office, Academic Affairs Office

(1) Make arrangements for duty during high temperature periods.

(2) If high temperature weather occurs and classes need to be temporarily suspended, each class teacher must be notified as soon as possible.

(3) Make arrangements for students’ activities when classes are suspended due to power outages due to hot weather.

(4) Do a good job in educating people on heatstroke prevention, cooling, safety and other knowledge during high temperatures.

(2) General Affairs Office

(1) Before the high temperature comes, organize personnel to inspect all cooling facilities in the school. If there is any damage, report it for repair in time to ensure normal use during the high temperature season. and promptly notify all departments of the situation.

(2) Do careful work to prevent heatstroke and cool down (purchase necessary items for heatstroke prevention and cooling, such as mung beans).

(3) Do a good job in ensuring the school’s electricity, water (drinking water), ice and other necessary items for heatstroke prevention and cooling.

(3) Class teachers

(1) Each class teacher must manage the drinking water in the class to ensure the quality of the students' drinking water.

(2) The floor of the class should be sprinkled with water in time, and students should prepare a clean towel, soak it with water and put it on their head or neck if necessary.

(3) Be sure to observe students’ physical reactions frequently when it is hot.

3. Other work

Heatstroke prevention and cooling is a comprehensive work. All departments in the school must cooperate with each other, support each other, and be on call at all times. Each department must work hard to do its job well, conduct an inspection of the scope of work based on the work of heatstroke prevention and cooling and the actual situation of the position, and be ready for the dispatch of the school's heatstroke prevention and cooling leadership group at any time. They must work together and cooperate to complete this year's work. Do a good job in heatstroke prevention and cooling.

IV. Specific measures

First, do a good job in heatstroke prevention publicity. Various forms of publicity such as campus broadcasts and theme class meetings are used to publicize knowledge about heatstroke prevention and cooling to students, and educate students to actively cope with hot weather. Actively guide teachers and students to maintain a peaceful mind, be united and harmonious, and stabilize their study and work in hot weather.

The second is to strengthen food safety management. The school has strengthened health inspections in canteens, which must be disinfected, and doors and windows must be opened to ensure ventilation. Ensure students’ drinking water hygiene and prevent gastrointestinal diseases.

The third is to reduce students’ outdoor sports. Cancel strenuous activities such as recess exercises and physical education classes to prevent students from being exposed to the sun and strenuous exercise outdoors for a long time.

The fourth is to ensure that students have adequate rest. Strengthen on-duty duties, maintain a safe and stable rest environment, and ensure students' mental state. Summer High Temperature and Heat Stroke Emergency Plan (3)

As the weather gradually turns hotter, the continued high temperature and muggy weather will have a great impact on the physical and mental health of front-line production employees, and it is especially likely to cause physical and mental fatigue, thus Increase the probability of accidents. In addition, the labor intensity of the production front line is high and the personnel turnover is serious, which puts forward higher requirements for heatstroke prevention and cooling. Therefore, it is necessary to minimize the impact of hot temperatures on front-line production employees and reduce the incidence of summer accidents.

Based on the actual situation of the production line, in order to reduce the incidence of accidents and employee turnover rate, the following heatstroke prevention and cooling plan has been specially formulated:

1. Daily diet

( 1) It is recommended that canteen meals should be light, nutritious and easy to digest, and prepare more cool and refreshing foods, such as cold noodles, cold dishes, jelly, etc.;

(2) Hot weather will increase employees’ physical energy Consumption, therefore, it is recommended that the canteen increase the amount of ginger, vinegar, bitter melon, garlic and other spleen-invigorating and stomach-invigorating products, and reduce the amount of greasy and spicy food in meals to enhance employees’ appetite;

(3) Try to maximize each meal Provide cool and refreshing drinks, such as tomato soup, mung bean soup, etc., kelp and pumpkin soup is recommended;

(4) When preparing meals, prepare more fresh and juicy foods, such as cucumbers, tomatoes, beans, Bitter melon and so on.

2. High-temperature welfare

(1) Regularly provide front-line production employees with cold fruits such as watermelons and tomatoes to relieve high-temperature stress.

(2) Purchase items such as kudzu root, honeysuckle, and mung beans, and provide fire-reducing drinks such as chrysanthemum tea, mung bean soup, and light salt boiled water regularly every day. Be sure to ensure the supply of drinking water to the production line.

3. Preventive measures

(1) Arrange for front-line production employees to take appropriate breaks according to weather conditions during work;

(2) Strengthen the management of employee dormitories and do Ventilate the dormitory well, do a good job in dormitory environmental sanitation, regularly disinfect and prevent mosquitoes, and do a good job in comprehensive environmental sanitation management;

(3) Strictly pay attention to the hygiene of the canteen, strictly implement the disinfection system, and do a good job in the sanitation of the canteen food, Prevent food poisoning incidents;

(4) Prepare some commonly used heatstroke prevention and cooling drugs, such as: Rendan, Huoxiang Zhengqi water, Shidishui, Fengyoujing, etc., and place them in the warehouse for the workshop director to prepare according to needs receive.

(5) Establish a medical rescue agreement with local hospitals as a guarantee for medical rescue; the company reserves drivers on standby to handle accidents due to hot weather in a timely manner;

4. Do a good job Ideological work of employees

(1) Make heatstroke prevention and cooling posters and post them throughout the company to publicize the heatstroke prevention and cooling work. It is planned to make posters, banners, printed A4 paper and post them in workshops, dormitories and other factory areas. It is expected that The cost is xx yuan;

(2) It is recommended to invite company leaders to visit employee workshops and dormitories in the evening;

(3) While employees are working, each workshop director and team leader should do a good job In terms of ideological guidance, employee relations specialists must regularly understand employees’ ideas, grasp their ideological trends, and conduct dormitory visits. Summer High Temperature and Heat Stroke Emergency Plan (4)

1. Purpose

To prevent company employees from suffering from heat stroke while working in high-temperature climate environments, ensure the company's production goes smoothly, and ensure that employees from suffering from heat stroke, etc. In the event of an emergency, this plan can quickly and effectively initiate emergency rescue work and protect the physical and life safety of employees to the greatest extent.

2. Responsibilities and scope of application

The company's Safety Management Committee is the department responsible for the execution of the plan. This plan applies to all departments of the company. The key prevention units are: the finalization process, the composite process, and the inspection section. , warehouse, boiler room, equipment power department, canteen, etc.

3. Emergency plan activated

Based on the highest temperature of the day published in "xx Daily", the system will automatically activate when the highest temperature for x consecutive days is above 37°C or the highest temperature of the day reaches 38°C. The emergency plan is activated, and all departments of the company implement various work measures according to the emergency plan.

4. Implementation of emergency plans

(1) The equipment and power department should strengthen the management of water and electricity supply in summer to ensure the electricity and water needs of workshop production. If power or water outages are necessary under special circumstances, relevant departments should be notified in advance and corresponding prevention plans should be formulated according to the specific circumstances.

(2) Extensively publicize knowledge on the prevention and treatment of heatstroke so that employees can master the basic knowledge of heatstroke prevention and cooling; workshop management cadres should strengthen patrol inspections of workshop production every day to keep abreast of the high temperature environment in the workshop and the physical condition of employees. Deal with any problems that arise in a timely manner and nip any signs of accidents in the bud.

(3) The equipment and power department is responsible for purchasing a batch of cooling drugs in advance and distributing the drugs to each process and position as required. The company has set up herbal tea buckets at each drinking water station to ensure a daily supply of herbal tea.

(4) Each key process and key high-temperature positions in the workshop are equipped with cooling fans. Arrange employees to take a rest for x minutes in a cool and ventilated place at c:30 in the morning and c:30 in the afternoon every day.

(5) The company canteen should supply ice water to the production line of the workshop twice a day, at x:30 in the morning and x o'clock in the afternoon. Two barrels of seaweed and egg soup are provided to employees for free at noon every day. The company office is responsible for the specific implementation.

(6) The company’s fleet should ensure that a car is reserved and equipped with a driver at any time to cope with emergencies. The specific responsibility lies with the corporate office.

(7) Heat stroke rescue methods:

Mild patients: When company employees experience dizziness, fatigue, or dizziness during normal operations, they should stop working immediately to prevent In the event of a secondary incident, other surrounding employees should arrange for symptomatic persons to rest in a cool, well-ventilated area and provide them with cold water, medicine, wet towels, etc. And notify the workshop or department leader.

Serious patients: (fainting, shock, severe lack of water, etc.) When a company employee suffers from heat stroke, people around the operation should immediately notify the workshop or department leaders, and promptly transfer the accident personnel to a cool and ventilated area for observation. Symptoms so that medical personnel can have first-hand treatment information when they come. The company office immediately organized rescue personnel to transfer the heat stroke patients to the nearest hospital for observation and treatment as soon as possible. and report it to the company.

Attachment: Clinical manifestations of heat stroke:

Mild heat stroke: clinical manifestations include dizziness, headache, flushed complexion, thirst, profuse sweating, general fatigue, palpitations, rapid pulse, Symptoms include inattention, uncoordinated movements, and body temperature rising above 38.5°C.

Severe heat stroke: includes three types: heat stroke, heat cramps and heat exhaustion, and mixed types may also occur. Among them:

Heat stroke (including sunstroke) is also called heat stroke hyperthermia. It is characterized by sudden onset in a high temperature environment, with body temperature as high as above 40°C. In the early stage of the disease, there is heavy sweating, followed by "no sweat" , which may be accompanied by dry and hot skin and varying degrees of disturbance of consciousness. Heat cramps mainly manifest as obvious muscle spasms, accompanied by contraction pain. It is more likely to occur in limb muscles and abdominal muscles that are more active, especially the gastrocnemius muscle. Often symmetrical. Sometimes it attacks, sometimes it relieves. The patient is conscious and his body temperature is generally normal. Heat exhaustion starts quickly and is mainly characterized by dizziness, headache, sweating, thirst, nausea, and vomiting, followed by clammy skin, decreased blood pressure, irregular heartbeat, mild dehydration, and slightly higher or normal body temperature.

(8) Emergency handling process:

Normal working hours and holidays:

When an incident occurs - notify the department or workshop leader - Office xxx ( xxxxxxx) - arrange vehicles to be sent to the hospital for treatment - processing and aftermath work

Night:

Incident occurs - notify the team leader or cadre on duty - company security captain xxx (xxxxxxxx) ——Arrange vehicles to be sent to the hospital for treatment ——Handling and aftermath work Summer high temperature and heat stroke emergency plan (5)

Purpose

In order to ensure the health of production employees in summer, especially in high temperature seasons , to effectively ensure the normal operation of the company's production, this plan is specially formulated.

Implementation Rules

1. Conscientiously implement the responsibility system for heatstroke prevention and cooling

Each workshop director is the first person responsible for safety production and must effectively strengthen the work on heatstroke prevention and cooling , clarify the responsibilities for safe production, and implement preventive measures to prevent employee heat stroke and various safety production accidents caused by high temperature weather.

2. Strengthen education on heatstroke prevention and cooling

Each workshop organizes safety education and publicity on heatstroke prevention and cooling for employees, so that everyone can master the safety knowledge of heatstroke prevention and cooling, strengthen summer work safety training, and enhance Employees’ awareness of production safety. The prevention of heatstroke, food poisoning, and fire prevention is regarded as the key training content, and safety work is constantly carried out.

3. Effectively carry out health and epidemic prevention work and adjust summer diet

Strengthen canteen management, effectively strengthen food hygiene management, strictly implement food hygiene systems, and avoid poisoning caused by food spoilage event. At the same time, the canteen recipes should be adjusted. During the high temperature season, the meals should be light, nutritious, and easy to digest and absorb, paired with refreshing soups to relieve the heat, such as kelp pumpkin soup, winter melon soup, etc.

4. Ensure adequate supply of drinking water on site

Provide sufficient drinking water that meets hygienic requirements on site to effectively prevent heatstroke and cool down, and avoid heat stroke events.

5. Actively improve the on-site production environment

It is necessary to conscientiously implement the work site management regulations and actively take measures to strengthen ventilation and cooling. Fans and air coolers must be installed at the work site.

6. Do a good job in fire prevention in summer

In view of the actual situation that fire accidents are prone to occur due to hot and dry weather in summer, fire prevention measures will be further strengthened, including distribution boxes, welding areas, Warehouses (paint, engine oil) and other flammable places should be inspected regularly, problems found should be dealt with immediately, and fire-extinguishing equipment should be equipped as required.

7. Implement heatstroke prevention and cooling items

The person in charge of each workshop applies for heatstroke-relieving drugs based on the actual number of people. Each workshop should have sufficient heatstroke prevention and cooling drugs (such as Rendan, Huoxiang Zhengqi Water, Fengyoujing) in the general office to ensure that employees can receive timely treatment when they fall ill.

8. Apply for appropriate high-temperature subsidies

1. Payment standard: x yuan/day/person for front-line high-temperature positions, x yuan/day/person for non-high-temperature positions, 30 per month Daily calculation.

2. Distribution time: tentative.

3. Distribution scope: subject to the actual on-the-job list.

9. Emergency rescue plan

1. Rescue of mild patients

When on-site workers experience dizziness, fatigue, or dizziness, the workers should Stop work immediately to prevent secondary accidents. Other surrounding workers should arrange for symptomatic persons to rest in a cool, well-ventilated area, provide them with cold water, wet towels, etc., and allow them to take Rendan or Huoxiang Zhengqi water to relieve summer heat. drug.

2. Rescue of serious patients

When a person suffering from heat stroke occurs at the work site (combined with fainting, shock, severe lack of water, etc.), people around the work should immediately notify the person at the work site. The team leader shall promptly transfer the accident personnel to a cool and ventilated area (or an air-conditioned office), and immediately organize emergency treatment according to the specific situation. Those with severe symptoms should immediately call the medical emergency hotline "120" and report to the company.