General solid waste filing solid waste pre-proposal filing

What environmental procedures are required for hazardous waste disposal?

To the local environmental protection department or solid waste management center for hazardous waste transfer record. The content to be submitted are: hazardous waste transfer filing form; need to submit the contract for hazardous waste disposal; generation unit business license, hazardous waste storage site information; disposal unit business license, hazardous waste disposal business license; transport unit business license and road safety permit.

After the completion of the record, the transfer of hazardous waste needs to be implemented in accordance with the transfer of the joint bill system.

What procedures are required for solid and hazardous waste disposal?

You need to go to the local environmental protection department or solid waste management center for hazardous waste transfer record. The content to be submitted are: hazardous waste transfer filing form; need to submit hazardous waste disposal contract; generation unit business license, hazardous waste storage site information; disposal unit business license, hazardous waste disposal business license; transport unit business license and road safety permit.

After the completion of the record, the transfer of hazardous waste needs to be implemented in accordance with the transfer of the joint bill system.

How to record the three types of auto repair stores in Henan?

Procedural materials are as follows:

1. Application report for filing (name of the repair shop, apply for the three types of which business, application time)

2. Repair operator's copy of the business license

3. Legal person ID card and a copy of the actual operator ID card, contact phone number and e-mail address

4. Business premises (including production plant and Business reception room), parking lot area, land use rights and property rights and other related materials (prepare a copy).

5. Summary of technical personnel, and related personnel education and technical title or professional qualifications of the relevant materials (need to appoint safety and quality inspectors high school education)

6. Maintenance equipment and facilities summary table, maintenance and testing equipment and measuring equipment certification and other related materials.

7. Maintenance management system materials (quality management system, production safety management system, vehicle maintenance file management system, personnel training system, equipment management system and parts management system)

8. Environmental protection measures and other related materials

9. Hazardous waste and solid waste to sign a valid contract

10. Labor contract

11. . working hours price list

12. Chain maintenance requires the provision of franchise agreements, chain operation of operating standards and management manuals, . Chain of service outlets in line with the corresponding conditions of motor vehicle maintenance business commitment (not a chain of maintenance enterprises do not need to provide)

Specific materials must be in accordance with national standards (auto repair business conditions) (GB/T16739) the relevant provisions of the provisions of the implementation.

Solid waste disposal state subsidy policy?

In the context of supply-side reform, in 2020, the state introduced a number of columns of solid waste treatment-related policies aimed at regulating the healthy development of the industry, improve incentives, regulatory mechanisms, and create a good environment, and thus optimize the industrial structure, strengthen technological innovation, support and promote industrial restructuring and upgrading, and promote the development of the solid waste treatment industry, high-end, intelligent, green.

Serial number

Published

Name of policies and regulations

Main content

1

March 25, 2020

Guidance on Promoting Healthy and Orderly Development of Sand and Gravel Industry

Supporting the Comprehensive Utilization of Waste Rock Tailings. In line with the safety, ecological and environmental protection requirements, to encourage and support the comprehensive utilization of waste rock, slag and tailings and other sand and gravel resources, to achieve "waste to treasure". Encourage the use of solid waste resources to manufacture recycled sand and gravel. Encourage the use of construction and demolition waste and other solid waste resources to produce sand and gravel alternative materials.

2

April 3, 2020

"Notice on Matters Relating to the Orderly Advancement of the Construction of New Waste Incineration Power Generation Projects (Draft for Comment)

The domestic waste incineration power generation (including biogas power generation) projects that will be connected to the grid and generate electricity after January 20, 2020, are new projects, and the state will continue to support them in accordance with the principle of determining expenditures on the basis of revenues through the Renewable Energy Development Fund. Development Fund to continue to be supported. At the end of December each year, the summary of the region's next year to apply for subsidies to fund the subsidy needs of new projects and submit to the National Development and Reform Commission, the project should be completed in accordance with the relevant provisions of the State for approval, approval or filing, and included in the national major projects construction library three-year rolling plan, all units can be completed within the year to connect to the grid to generate electricity.

3

April 29, 2020

"Chinese People's Republic of China*** and the State Law on Prevention and Control of Environmental Pollution by Solid Waste"

The new Solid Waste Law makes it clear that the prevention and control of environmental pollution by solid waste strengthens the supervisory and management responsibilities of the government and its relevant departments and improves the system of prevention and control of pollution of the environment by industrial solid waste, domestic garbage, hazardous wastes, construction wastes, and agricultural solid wastes. Prevention and control system, improve the protection mechanism, strict legal responsibility.

4

April 30, 2020

Implementation Plan for Capacity Building of Medical Waste Centralized Disposal Facilities

To strive for the realization of large cities and megacities as soon as possible within 1-2 years to have sufficient emergency treatment capacity; each city above the prefectural level to build at least one centralized disposable facility for medical waste in line with the operational requirements; each county (city) to build a Medical waste collection, transportation and disposal system, to achieve the county level above the full collection of medical waste, the full treatment, and gradually covered to the established towns, and strive for standardized disposal of medical waste in rural areas. Conditional areas to use the existing hazardous waste incinerators, household waste incinerators, cement kilns to make up for the short board of medical waste emergency disposal capacity.

5

June 4, 2020

Hazardous Waste Environmental Permit Management Measures (Draft Revision) (Draft for Comment)

Units engaged in hazardous waste collection, storage, utilization, disposal of business activities, should be in accordance with the regulations to receive hazardous waste environmental permits and other industry sector permits, this approach strengthens the hazardous waste environmental permit Approval of the issuance and supervision and management of hazardous waste collection, storage, utilization, disposal of business activities in the process of pollution prevention and control of the environment.

6

July 3, 2020

The Plan for Collaborative Transformation and Upgrading of the Industrial Comprehensive Utilization of Industrial Resources in Beijing-Tianjin-Hebei and the Surrounding Regions (2020-2022)

By 2022, the regional annual volume of comprehensive utilization of industrial solid wastes will be 800 million tons, and the volume of recycling of major renewable resources will reach 150 million tons, with the total output value of the industry exceeding 900 billion yuan, form 30 distinctive industrial clusters, build 50 industrial innovation centers, and cultivate 100 innovative backbone enterprises. Regional synergy mechanism is more perfect, basically forming a new pattern of resource recycling industry development of bulk agglomeration, green high value, synergistic and efficient.

According to the target requirements, it is proposed to synergistically utilize industrial solid waste to prepare sand and gravel aggregate, promote the synergistic utilization of bulk metallurgy and coal power solid waste, grow the scale of high-value industrial utilization of industrial solid waste, improve the level of utilization of scrap metal, promote the efficient utilization of waste polymer materials, accelerate the recycling of decommissioned power batteries, push forward the development of integrated utilization of resources, promote the synergistic treatment of production systems for urban Waste, building green Xiongan, innovation to lead the synergistic development of 10 major tasks.

7

July 18, 2020

The Implementing Rules of the Administrative Measures for the Recycling of End-of-Life Motor Vehicles

The State encourages the development of the recycling and dismantling industry of end-of-life motor vehicles in terms of marketization, specialization, and intensification, and pushes forward the improvement of the recycling system of end-of-life motor vehicles to improve the efficiency of recycling and the level of service. State recycling and dismantling enterprises to implement qualification system. Without qualification, any unit or individual shall not engage in end-of-life motor vehicle recycling and dismantling activities.

8

July 31, 2020

The Implementation Plan for Mending Shortcomings and Strengthening Weaknesses in Urban Living Waste Classification and Treatment Facilities

Urban living waste classification and treatment facilities are important urban environmental infrastructure. It accelerates the construction of facilities for classified placement, collection, transportation and treatment of domestic garbage, makes up for gaps in treatment capacity, improves urban environmental infrastructure, improves the ecological environment, enhances the modernization of governance capacity, and promotes the formation of a system for classifying and treating domestic garbage that is in line with economic and social development.

9

August 27, 2020

Technical norms for pollution control of fly ash from domestic waste incineration (for trial implementation) (HJ1134-2020)

This standard specifies the technical requirements for pollution control of fly ash from domestic waste incineration in the process of collection, storage, transportation, treatment and disposal. Aims to prevent environmental pollution, improve the quality of the ecological environment, standardize and guide the environmental management of domestic waste incineration fly ash.

10

September 11, 2020

Implementation Plan for Improving the Construction and Operation of Biomass Power Generation Projects

Since January 1, 2021, all biomass power generation projects that have been approved but not yet commenced within the planning, and all new biomass power generation projects approved within the planning, have been configured through competition. Meanwhile, in order to promote biomass power generation projects to give full play to the role of environmental governance and increase the supply of renewable energy, etc., and to ensure the scientific and efficient use of subsidy funds, the projects under construction should be completed and put into operation within a reasonable period of time. From 2021 onwards, the subsidy funds for projects newly included in the scope of subsidies (including projects that have been connected to the grid in 2020 but have not been included in the subsidy scale of the current year, and projects newly connected to the grid and included in the subsidy scale from 2021 onwards) will be borne by the central local **** with.

11

September 29, 2020

Several Opinions on Promoting the Healthy Development of Non-Water Renewable Energy Power Generation

Non-water renewable energy is an important part of the energy supply system, and is an important element in ensuring energy security. Opinions put forward: First, improve the current subsidy method; second, improve the market allocation of resources and subsidy regression mechanism; third, optimize the subsidy payment process; fourth, strengthen the organization and leadership, in the supplemental notice of the project reasonable hours of utilization, the project subsidy power, subsidy standards and to strengthen the verification of the project and other matters to be supplemented.

12

October 15, 2020

Notice on the in-depth promotion of cleaner production audits of key industries

Strengthening of financial security and policy support, in accordance with the "People's Republic of China *** and the State Promotion of Cleaner Production Law" requirements will be included in the cleaner production audits of the work of the funds into the level of the annual financial budget for the cleaner production engaged in research, Demonstration and training, the implementation of national cleaner production key technological transformation projects and voluntary resource conservation, reduction of pollutant emissions contained in the agreement on technological transformation projects, to give financial and policy support. Costs used by enterprises for cleaner production audits and training can be included in their operating costs. Enterprises that have reached the international leading level of cleaner production will be given priority support in government green procurement, enterprise credit financing, etc., and will be included in the positive list for supervision and enforcement.

13

October 20, 2020

New Energy Vehicle Industry Development Plan (2021-2035)

Promoting the development of the entire value chain of power batteries. Encourage enterprises to improve the ability to guarantee key resources such as lithium, nickel, cobalt and platinum. Establish and improve the modularized standard system of power battery, accelerate the breakthrough of key manufacturing equipment, and improve the process level and production efficiency. Improve the recycling system of power battery recovery, ladder utilization and re-resourcing, and encourage *** to build *** recycling channels. Establish and improve the power battery transportation and warehousing, repair and maintenance, safety inspection, decommissioning and withdrawal, recycling and other aspects of the management system, and strengthen the whole life cycle supervision.

14

October 26, 2020

Notice on the Reduction of Subsidized Funds for Renewable Energy Tariffs for Environmentally Illegal Garbage Incineration Power Generation Projects

Garbage incineration power generation projects should be completed in accordance with the law and regulations, "installation, tree, and linkage," before being included in the scope of the subsidy list. The scope of the list. After the waste incineration power generation project discloses the automatic monitoring data to the society, the power grid enterprise can disburse the subsidy funds and reduce the subsidy funds during the period of not disclosing the automatic monitoring data to the society at the time of settlement. 2020 June 30 has been included in the subsidy list, but has not completed the "installation, tree, link" of waste incineration power generation project, the power grid enterprise shall first suspend the disbursement of subsidy funds. Enterprises should first suspend the allocation of subsidy funds, until the power generation enterprises to complete the "installation, tree, link" and to the community to disclose the automatic monitoring data before the allocation of subsidy funds.

15

November 5, 2020

National Hazardous Waste Directory (2021 Edition)

The new Directory reduces the number of types of hazardous waste by 12 and exempts 16 new types of hazardous wastes, and some of the codes of the wastes have been changed, which will have far-reaching impacts on the generation, transportation, and treatment of hazardous wastes.

16

November 17, 2020

Notice on the Announcement of the Results of the Declaration of the 2020 Biomass Power Generation Central Subsidy Projects

To be included in the scale of the 2020 central subsidy for biomass power generation of 77 projects in 20 provinces (autonomous regions and municipalities), such as Hebei, Shanxi, and other projects included in the scope of the subsidy has reached the total amount of the total amount of subsidies required for the projects. The amount of new central subsidy funds in 2020 is 1.5 billion yuan. Among them, 18 projects of agricultural and forestry biomass power generation, 46 projects of waste incineration power generation, and 13 projects of biogas power generation

17

November 25, 2020

"Announcement on Matters Relating to a Comprehensive Ban on Imported Solid Wastes"

Since January 1, 2021, China will prohibit the import of solid wastes in any way, and ban the solid waste outside China from entering the country for dumping, stockpiling and disposal. The Ministry of Ecology and Environment will no longer approve and issue import licenses for solid wastes that can be used as raw materials in the restricted import category.

In September 2020, President Xi Jinping solemnly proposed at the 75th General Debate of the UN General Assembly that China "strive to peak carbon dioxide emissions by 2030, and strive to achieve carbon neutrality by 2060." The Central Economic Work Conference in December 2020 further clarified that China will The Central Economic Work Conference in December 2020 further explicitly identified "doing a good job in achieving carbon peak and carbon neutrality" as one of the eight key tasks for 2021.

Does an environmental protection company need to file with the EPA?

Needed.

Environmental protection companies need the following qualifications and materials for the record in the EPA

I. Prior to the environmental assessment of construction projects.

Two, the project in accordance with the principle of three simultaneous commencement of construction.

1, after the completion of the construction project, the construction unit should apply to the local Environmental Protection Bureau of the total amount of pollutant emissions control section of the construction project completion of environmental protection acceptance.

2. Application for trial production or direct production. After the completion of the construction project for trial production, before putting into trial production, should be submitted to the local Environmental Protection Bureau (Environmental Supervision Brigade) to apply for trial production, from the date of approval of the consent to trial production of three months, to the Pollutant Control Section to apply for environmental protection acceptance of the completion of the construction project.

3. 3 months of trial production does not have environmental protection acceptance conditions of the construction project, the construction unit should be in the trial production of three months to the total amount of the construction project environmental protection to extend the acceptance of the application, stating the reasons for the extension of the acceptance of acceptance and acceptance of the time to be carried out. Upon approval, the construction unit may continue to carry out trial production, and the maximum period of trial production shall not exceed one year.

Three, the acceptance of the record information include:

(1) the construction project environmental impact assessment report/table/registration form of the approval of the opinion;

(2) the construction project trial production application for the examination and approval of the opinion;

(3) the completion of the project environmental protection acceptance of the construction project application report form or registration card;

(4) the completion of the construction project Environmental Protection Acceptance Monitoring Report (Form);

(5) Solid Waste Exchange and Transfer Application Form approved by the environmental protection department;

(6) Drainage Permit for Domestic Sewage Possession;

(7) Environmental Protection Report of the Construction Unit;

(8) Environmental Protection Management System and Management Network of the Construction Unit;

(9) Sewage and Rainwater Pipeline Map, Sewage Discharge Map, and Sewage Disposal Map of the Plant; and

(10) the construction project pollution control engineering program;

(11) the construction project environmental control facilities engineering contract; (12) the Environmental Protection Bureau that need to prepare other materials.