Flood Drill Activity Program (General 5)
In order to ensure that the activities to achieve results, usually need to make a complete program of activities in advance, the program of activities is to clarify the activities of the time, place, purpose, expected results, budget and methods of activities and other written plans. Excellent activity programs have some of the characteristics of it? The following is my compilation of flood control drills activity program (general 5), for reference only, welcome to read.
Flood control drill activity program 1
In order to further strengthen the implementation of flood control and disaster relief emergency plans for the implementation of the measures to improve the staff of the housing management to deal with the flood season, the ability to deal with the emergence of dangerous situations, combined with the arrangements for flood control, the organization of flood control and disaster relief emergency drills, the development of the program is as follows:
a. Drill time
May 20xx
Second, the scope of the drill
1, Majiazhuang low-cost housing district
2, Hongsheng Jinyuan district
3, direct management of the public housing road No. House
Third, the purpose of the drill
In the event that the Rainstorms, flood emergency situation can be rapid, efficient, orderly, to ensure the safety of personnel to organize the evacuation of dangerous areas, and minimize property damage, through drills to further improve the staff and property management station on the flood emergency response capabilities and disaster prevention and avoidance awareness.
Fourth, the content of the drill
1, two neighborhood drills in a timely manner to remove the water, to ensure that the waterway is open, the scene of the emergency assessment, security alert.
2, directly under the management of the public housing exercise personnel evacuation, housing risk support, water exclusion.
Fifth, the drill organization
1, led by the Directly Managed Public Housing Management Section, East Street Housing Management with the unified coordination and scheduling, the two property management station and directly managed public housing drill work.
Six, drill security
1, flood control materials: pumps, cables, sandbags, raincoats, rain shoes, shovels and so on.
2, transportation vehicles: a small passenger van, car number xxx
3, evacuees placement, aftercare.
4, on-site records, photographs, collection of information.
Flood Drill Activity Program 2I. Establishment of the Flood Drill Command
Commander-in-Chief: xxx
Deputy Commander-in-Chief: xx, xxx
Members: ...... and the class teachers of the classes
The emergency team
strong> Second, the emergency response team
1, classroom evacuation team: if it is in the classroom time, whoever is in charge of the class. If it is after school hours class teacher is responsible.
Responsibilities:
(1) lead students to escape during the flood drill, who is responsible for who is the last to leave the classroom, fast and effective organization of the students to evacuate to a safe site;
(2) arrive at the safe site after a rapid count of the number of students and the casualties;
(3) classroom teacher timely to the statistical team to report the situation of the evacuation of students.
2, other evacuation team: teaching building stairs:
First floor stairs: xxx;
Second floor stairs: xxx;
The main entrance evacuation guide: xx, xx;
Order Maintenance: xxx;
Responsibilities: the alarm sounded, quickly to the various stairways and the school gate, evacuation of the students, to ensure that the student Fast, orderly evacuation, strictly prohibit the occurrence of overcrowding, falls, trampling accidents.
3, publicity team: xxx (photography) Responsibilities: specifically responsible for emergency personnel scattered from the scene after the publicity and education, photography, photography, reporting.
4, rescue team: ...... Responsibilities: specifically responsible for the drill evacuation process of accidents occurring in the emergency rescue.
5, statistics team: ...... Responsibilities: specifically responsible for the safety of evacuation after the personnel (the whole school) statistics, statistics, good timing work.
Third, the drill object
xx elementary school all teachers and students
Fourth, the drill time
20xx xx at 15:50 pm
Fifth, the content of the drill scenario simulation strong>
The whole school teachers and students in the classroom, suddenly heard the radio issued a flood warning signal, teachers immediately evacuated students from the building to a safe area.
Sixth, the meeting place
Teaching building, third floor, six
Steps of the exercise: the stage of the flood control drill:
1, study mobilization. Flood safety in the whole school to carry out a flood safety education activities, teachers and students to organize learning, improve the awareness of flood safety teachers and students. In charge of the leadership and security officer of the organization and guidance, seriously study and simulation exercises our school developed emergency plan, familiar with their respective duties and tasks in the emergency, the basic self-help and escape methods, to protect the students and public **** the safety of property.
2, the establishment of the drill leadership organization, clear responsibility, strict organization and implementation of the drill activities to ensure the successful completion of the drill activities to achieve the desired results.
3, the organization of the drill. Explain the knowledge of flood control and the notes in the process of the drill, and under the guidance of the commander-in-chief of the drill. All teachers and students should participate in the drill as a real battle and take it seriously.
A, the afternoon of the day, the first or second period, by the class teacher to arrange time for students to carry out a flood control knowledge education.
B, the afternoon of 15:50, heard the signal, classroom teachers arranged for students to evacuate in an orderly manner, leading students to evacuate in order. The commander-in-chief issued the evacuation command: "Attention all classes, now evacuate the students to the safety zone outside the school entrance, all classes quickly evacuated, do not panic and loud noise". Teachers at the scene heard the order and immediately organized the students to prepare for the evacuation and issued the order, "Stand up, ready to evacuate! Open the front and back doors," the students heard the command, 1, 2 groups facing the front stand, 3, 4 groups facing the back stand, the foremost students quickly move the desks and benches, open the evacuation channel, easy to evacuate. Requirements:
1. Teachers should give the command calmly and decisively. Students should not panic, not to mention loud clamor.
2, students should listen to the teacher's command, the action should be fast and quiet.
C. According to the specific situation, the teacher should decisively issue the command: "Start evacuation!" Students heard the evacuation order, 1, 2 groups directly in order from the desks out of the front door automatically all the way out, 3, 4 groups directly in order from the desks out of the back door all the way out of the back door, out of the door and then merge into a way to go downstairs quickly, to reach a safe place.
4, summarize the report. After the end of the exercise, the commander-in-chief or the person in charge of the exercise to summarize the problems arising from the exercise should be pointed out in a timely manner and rectification, summarize the situation collated and archived.
VII, drill requirements
1, strengthen the leadership, to ensure that the drill work to achieve the desired purpose. In the unified deployment of the commander-in-chief, the whole school teachers and students should attach great importance to raise awareness and actively participate to ensure that the effect of the drill.
2, each class adjusted the work to ensure full participation. This drill is a comprehensive, larger-scale flood control drills, all classes should organize students to actively participate in this drill to learn and enhance their ability to avoid the dangers of disasters and other fire skills.
3, improve the rules and regulations, strengthen the implementation of accountability. After the end of the drill, the drill activities should be seriously summarized for the problems arising from the drill to be timely rectification.
Flood Drill Activity Program 3
Floods are fiercer than tigers, prevention, to ensure safety, in order to meet the sudden flood outbreaks in the summer, to ensure that the campus and teachers and students of the safety of life and property, especially the development of this plan.
First, the guiding ideology
To cherish life, the principle of safety first as a guide, the full implementation of the county and city flood control work conference requirements, a strict grasp of the weather during the flood season climate change, at the time of the start of the plan, to ensure that the catastrophe came with less loss or loss, for teachers and students and the school's life and property safety to provide a strong guarantee.
Second, the flood control measures
1, pay close attention to the weather and climate change, keep abreast of the weather forecast reasonable arrangements for teachers and students to work and study life, and at any time ready to respond to emergencies.
2, in case of heavy rainfall, the school should be sent to guide students to school, after school, to prevent students from walking on their own, be sure to joint with parents before withdrawing. (All classroom teachers)
3, when flooding occurs to immediately start this plan, command rescue commando into combat rescue state. (All male teachers)
4, such as flooding in class, the command team should be under the command of a unified call, reasonable diversion of students to move to a safe place, and make a reasonable risk prevention work.
5, the disaster occurred after all teachers to the students' safety, immediately enter the situation to ensure road traffic, communication, alarm, rescue, maintenance.
Third, the leading group of flood control work
Leader: XXX
Deputy Leader: XXX
Members: XXX XXX XXX
The leading group of the `responsibility of the work of the leading group of the flood control work:
Responsible for checking, supervising the work of the flood control of each school; according to the flood situation, research, Formulation of flood control program; command flood control and flood rescue team to rescue; responsible for reporting to the superiors of the flood situation and handling; coordination with the relevant departments to do a good job of rescue work; do a good job of the aftermath of the work.
The leading group set up an office, responsible for dealing with the day-to-day work. The office is located in the office of the political education department, contact number: XXXXXXXXX.
Fourth, the responsibilities of the functional groups
Command Group: XXX XXX
Responsibilities: in the case of regional flooding disaster of excessive standards, the first time to arrive at the scene, in the county party committee and the county government and the Education Bureau Flood Control Headquarters Under the unified arrangement, start the flood control and flood prevention work plan.
Communication Group: XXX XXX
Duties: Coordinate the rescue of non-affected schools to the affected schools, organize the relevant personnel to maintain order in the school, strengthen the safety and security, and protect the safety of teachers and students and educational assets from loss.
Diversion group: XXX XXX
Responsibilities: do a good job of flood control preparations in advance, according to the flood situation, delayed or early dismissal time, the organization of the students to a safe place to take refuge (two to four classrooms), if necessary, can be organized to teachers or parents to escort students to their homes.
Rescue group: XXX XXX XXX
Responsibilities: Responsible for the rescue of the sick and injured patients and emergency medical care, hospital first aid and other tasks.
Equipment Protection Group: XXX XXX XXX
Responsibilities: Coordinate the medical team, prepared medical equipment, medicines, at any time to participate in the rescue.
Drainage group: XXX XXX XXX
Responsibilities; actively participate in and organize teachers to carry out drainage work, the use of good equipment and tools timely drainage.
Liaison group: XXX XXX
Responsibilities: Once the flood occurred, the school should immediately report the flood situation to the relevant departments, while taking the initiative to take strong and effective measures to deal with.
V. Materials and work security
1, the school should prepare a sufficient number of shovels, woven bags, lighting tools, portable microphone, etc., temporary storage, in order to be ready to call at any time.
2, a comprehensive investigation of dangerous houses, dangerous toilets, dangerous walls, the first self-check and rectification, ready to accept the higher inspection, to nip hidden dangers in the bud, to ensure the safety of premises during the flood season.
3, during the flood season, the school should strictly implement the 24-hour duty system during the flood season, the establishment of a flood disaster reporting system and record-keeping system, all the leaders of the Board of Education, the main leaders of the schools directly under the communication phone is always kept in a normal state, in order to facilitate the smooth transmission of flood information.
Flood Drill Program 4A guiding ideology:
In order to further enhance the staff's awareness of flood control, improve the escape skills in case of accidents, and to effectively master the method of escape when the flood comes. This is in accordance with the "safety first, prevention first, comprehensive management" policy, in order to quickly, efficiently and orderly response to the flooding in the construction scope of my section, major accidents, through the launch of the flood control exercise program to ensure that my section area in the encounter with torrential rains, in the shortest possible time to give full play to the role of the security mechanism, the rapid, efficient and orderly implementation of the flood control program, to ensure that the flood control system will be able to provide the best solution to the problem. Rapid, efficient, orderly implementation of rescue work, maximize the accident damage to a minimum, reduce casualties and property damage, maintenance of employee safety, to further popularize the knowledge of flood safety, enhance employee awareness of flood safety, master the arrival of the flood quickly escape, self-rescue, mutual rescue of the basic methods to improve the ability to resist floods and respond to emergency emergencies, the special formulation of the following drill program.
Second, the purpose and requirements of the drill:
The purpose of the drill
1, so that employees are familiar with the escape routes, methods, and in the shortest possible time to reach the gathering place.
2, test the project in the event of an emergency response is fast, emergency measures are reasonable, safety and security in place.
Exercise requirements:
1, strengthen the leadership to ensure that the exercise achieves the desired purpose. Under the unified deployment of the commander-in-chief, the staff of the entire section should attach great importance to raising awareness and actively participate to ensure the effect of the drill.
2, each construction team to adjust their work to ensure that the person in charge, safety personnel to participate.
3, improve the rules and regulations, and strengthen the implementation of accountability. After the end of the drill, the drill activities should be seriously summarized, for the problems arising in the drill should be rectified in a timely manner.
1, information report;
2, safety evacuation;
3, on-site casualty rescue.
Fourth, the organization and leadership:
Gu: Sanyuan County Flood Control Management Office
Group Leader: Ge Yuzhi
Deputy Group Leader: Wang Shijun
Members: the head of the construction team, the safety officer and members of the flood rescue team
Fifth, the exercise to participate in the Personnel:
West Copper Highway Expansion Management Office, Director's Office, the third resident office, the adjacent section leaders, project leaders, departmental backbone, full-time safety officer, the construction team responsible for safety.
Sixth, the stage of flood control drills:
1, study mobilization. In the whole section of the bid to carry out a flood safety education activities, organize staff to learn and improve the staff's flood safety awareness. In charge of the leadership and safety officer of the organization and guidance, seriously study and simulation exercises I project developed emergency plan, familiar with their respective duties and tasks in the emergency, the basic self-help and escape methods, to protect the staff and public **** property safety.
2, the establishment of the drill leadership organization, clear responsibility, strict organization and implementation of the drill activities to ensure the successful completion of the drill activities to achieve the desired results.
3, the organization of the drill. Explain the knowledge of flood control and the precautions in the process of the drill, and under the guidance of the commander-in-chief of the drill. All employees should participate in the drill as a real battle and take it seriously.
(1) members of the rescue team in accordance with the divided area of responsibility, quickly in place, put water blocking boards, hoarding sandbags to prevent flooding into the construction site. And immediately organize personnel to carry out rescue and relief, rescue site property, take all means to remove the site water, and strive to minimize the loss.
⑵ on-site drills
A, x July 30, 8:00, by the project safety officer to arrange time for employees to carry out a flood prevention education. Uniform arrangements for the deployment of this exercise, the specific arrangements see "Project Flood Control Emergency Response Plan", and the development of this simulation exercise time, location, the content of the exercise.
B, 2:00 p.m. the construction team responsible for the safety officer, members of the flood rescue leadership team, on time to the bottom of the Qinghe ditch, by the site commander Ge Yuzhi unified signal (my project received a notice from the Sanyuan County Meteorological Bureau, the next half hour there will be a large heavy rainfall, Xijiao Reservoir due to the water level is too high, the need for flooding, please quickly transfer the site of machinery and equipment, materials).
C, heard the signal, the flood rescue leadership team leader Wang Ying three arrangements for the team to enter the scene in an orderly manner to transfer equipment, materials.
D. Wang Yanbiao, director of the safety department, shouted on the loudspeaker (the flood will arrive soon, please run to the high ground quickly).
E, heard the signal, flood rescue leadership team leader Wang Ying three, led the staff to evacuate in order. Evacuation order: the requirements of sequential fast, safe, can not grab, so as to avoid accidents of crowding and trampling.
F, by the clear river ditch bottom rescue team leader Wang Ying three count, to the site commanders to report the number of people (report the commander-in-chief of my team due to the rapid flooding, in the evacuation process, employees did not run out, injuries, and the water level in the rising, has been approaching my construction team materials stacking area and the personnel living area).
4, according to the flood emergency plan to start rescue (see attached).
5, casualty rescue exercise
Ambulance group requirements: received the signal of the site personnel injured, medical immediately rushed to the designated location with the relevant equipment and medicines, emergency ambulance treatment of the injured and contact vehicle delivery, responsible for the organization of the personnel to take rescue measures to maximize the protection of injured personnel, rescue trapped personnel.
Ambulance procedures:
(1) Select a person to simulate fractures, coma and other injuries.
(2) Medical personnel on the injured emergency ambulance treatment.
(3) The duty vehicle arrives to deliver the casualty.
6, the scene of the photographic organization
Group leader: Qiao Wanjun
Group members: Li Hongjun Kang Bo
Requirements: Designate a person to carry a camera to the scene of the process of action of the whole process of video recording after receiving the alarm and the entire exercise process of taking pictures as well as post-editing information.
seven, the end of the exercise, the site commander: the exercise situation for evaluation.
VIII, late work
1, put forward a summary report of the exercise.
2, the production of information archiving.
This program is not exhaustive, to be announced.
Flood control drill activity program 5
I. Flood control rescue drill objectives
In order to conscientiously carry out the instructions and spirit of the higher level of flood control wages, to ensure that my shelf team in the flood season or non-flood season during the flood of excess flood can be safe through the flood. Reduce the loss caused by floods, before the flood season, do the necessary flood control materials, equipment preparation, fully aware of this year's severe flood control situation, fully do the ideological mobilization of all employees, ready to flood control, rescue, to ensure the safe transfer of personnel, equipment, materials, to ensure that the project's safe flooding.
Second, the organization
1. Command structure
Commander: Han Zhihui
Deputy Commander: Shi Wenli, Wang Leping, Mao Yongzhe
2, communication and liaison group
Leader: Storm Guangjuan
Group: Yang Yan, Qiao Chunle
3, materials, and materials. Protection Group
Leader: Zhao Huajie
Members: Sun Xiaogang Wang Liyuan
4, emergency rescue group
Leader: Han Zhifu
Deputy Leader: Tang Lipeng
Members: Liu Mingyang Wang Wei He Xin
5, aftermath of the treatment of the group, Leader: Liu Yibo
Members: Li Chuan Zhang Naixin
6, the cause of the investigation team 6, the cause of the investigation team 6, the cause of the investigation team 6, the cause of the investigation team 6, the cause of the investigation team 6, the cause of the investigation of the investigation team 6, the cause of the investigation teamGroup Leader:
Members: Tian Miao Liao Rong
Third, the preliminary layout of the accident site
1, the layout: the construction site of the normal operation of all operations there is a crane, an excavator, a loader, a bulldozer, a command vehicle, generator 2, Water pump 10, shovel 20, pickaxe 10, woven bags 2000, gravel 200m3
2, requirements: must be rushed to the scene within 15 minutes.
Four, drill procedures
1,
(1) received notice from the local authorities, the upper reaches of a wide range of rainfall, the flood peak is forming and approaching the construction site of my frame team, the leading group of the flood control rescue in accordance with the provisions of the start of the flood control flood control plan
(2) flood control flood control rescue team all In place, the team began to organize, wear a good life jacket, into the state of flood control and rescue.
(3) Flood control exercise commander-in-chief shelf captain Han Zhihui, deputy commander of the secretary Shi Wenli, chief engineer Wang Leping, safety inspector Mao Yongzhe in place, and announced the start of the flood control exercise.
(4) Received the general command to start the order within 15 minutes, all the rescue team members to reach the established rescue area, each piece of equipment to reach the designated rescue position, the rack team of various types of commanders are all in place, according to the pre-drafted emergency rescue plan for flood control and rescue, the actual operation, at any time to check and find out in the process of the exercise problems. Timely remedial measures.
(5) After 45 minutes of the scene of the rescue, to meet the established requirements of the flood control plan, and to the flood control exercise commander-in-chief to report the results of the on-site observation of the owners, supervisors agreed, the flood control exercise commander-in-chief Han Zhihui announced that the flood control emergency rescue exercise to meet the established requirements, the successful conclusion.
2, the effect of the drill evaluation summary
After the end of the exercise, the flood control drill leading group of the drill organization and command, personnel and equipment in place, the operation and supply of materials in place to evaluate the situation, carefully analyze every detail of the drill process, according to the problems that exist in the drill process, and timely repair of the contents of the emergency rescue plan. Through this flood rescue drill, improve the shelf team command ability and personnel resilience, enhance the practical operation of the flood control plan.