What is the situation in Kunlun Washington?

Kunlun huafu

Park property? High-rise banlou

The latest news is that building 15 is scheduled to open in mid-September. The construction area of the main apartment is 89 square meters, 1 18 square meters. The current down payment is 80%. Delivery at the end of the year.

The address project is located in Yuhang, Liangzhu New Town, east to Zhangjiaba Port, south to the newly-built 104 national highway shelter forest, west to Xiamen Ba Port and north to Kangliang Road.

Developer Hangzhou Baolun Real Estate Development Co., Ltd.?

70 years, 30%? 2.5 ? 1887 households? 10 guilder

Property display: total number of households: 1887, 22 high-rise buildings, 18 floors.

Property Kunlun Property Management Co., Ltd.?

1.68 yuan/m2. The ratio of 2060 parking spaces per month is greater than 1: 1.

Peripheral matching

Peripheral facilities: Transportation facilities: Metro Line 2, East-West Avenue, Gudun Road, Ring Expressway, National Highway 104, etc.

Commercial facilities: Wang Yongmeng visited the city (under construction), Gao Ping Zhejiang University Venture City, Zhongqing Square (under planning) and other large-scale commercial complexes, and matched with Liangzhu old city to improve and mature living facilities;

Educational facilities: Liangzhu No.1 Primary School, Liangzhu Middle School, Yuhang No.1 Middle School, Kindergarten, etc.

Medical support: Liangzhu Branch of Hangzhou Second People's Hospital, Xinhua Hospital Branch, Liangzhu Hospital of Yuhang District, etc.

Building materials and equipment: delivery of blank

Bus route:

No.787 Station: Zhang Cun Dai Station

No.348: Liangzhu People's Government Station, Zhang Cun Daizhan.

49 1A Ring Road: Sunny Sky Station

507 Road: Liangzhu Primary School Station, Chongfu Village Station.

Road 477: Liangzhu Leisure Culture Square Station, Liangzhu Middle School Station.

No.372: Sunshine Sky Station, Chongfu Village Committee Station, Yuan Shulin Station and Yucheng Garden Station.

Self-driving route: drive 2.5km along Xueyuan Road from the west of the city, 3.9km along Xueyuan North Road, 7.4 km along Fengqing Road 1.4km, turn right into Guangye Street, drive 700m, turn left into Moganshan Road, drive 6.4km, turn left into Xiangzhou Line, drive 800m, turn left and drive about 360 to reach Kunlun Huafu.

analyse

The project is located in Liangzhu New Town. The overall planning of the building covers an area of 280,000 square meters. The main apartment type is 80-120m2 luxury two-bedroom and all-round three-bedroom.

Advantages:

1. The transportation network around the project is developed. Moganshan Road, Gudun Road, Ring Expressway and East-West Avenue form a "well"-shaped transportation network for self-driving travel, reaching the core areas such as Yuhang and Future Science and Technology City in the urban area. Half a drive to the Future Science Park, and Line 2 arrives at West Lake and Wulin Business Circle 10 Station.

2. It is about 800 meters away from Liangzhu Station, the last stop of Metro Line 2. It will be opened to traffic at the end of this year, which will greatly increase the convenience of travel.

3. This project is a rare quasi-existing house and new house project in Liangzhu plate. The subway will be completed by the end of the year, and the house can be delivered in May 438+February.

4. The plots on the north side of the project were acquired by COFCO, Rongxin and Lianfa respectively, and the floor price was as high as 1.6 million. All three plots were commercial. The plot on the north side of the third plot started shooting on September 27th. The government starting price is 65438+4000, and the highest price is 2 1 000. According to industry sources, it was basically purchased at the top price, and 30,000+entered the market two years later. The price of Kunlun Washington will definitely increase in the future.

Disadvantages:

1. Last year, the online evaluation of this project was poor because it could not be resold online. Policy issues are not developers' issues.

Generally speaking, the project is suitable for budget, not abundant or investment. Surrounding facilities will face a strong rise in two years, and the project has no parking space binding.