Construction sheet for installation and debugging of hospital medical equipment

Installation records of panels, boxes and cabinets, name of construction unit, name of work section, construction drawing number of monitoring system construction unit, construction date, number, model/serial number, installation location and insulation status: 1, good insulation in accordance with regulation 2, good insulation in accordance with regulation 3, good insulation in accordance with regulation 4, good insulation in accordance with regulation 5 and good insulation in accordance with regulation 6. According to regulations 7, 8, 9 and 10, the insulation is good, and the measured situation is 1. The wiring in the cabinet conforms to relevant regulations, and the equipment and components are well inspected. 2. The equipment in the cabinet should be neat and beautiful, with clear and complete line color signs and neat wiring. 3. The paint on the counter is intact without deformation. 4, the incoming and outgoing lines in the cabinet are arranged neatly, and the bending radius conforms to the regulations. 5. The inclination, levelness and verticality of the control cabinet installation are within the specified error range. Description: technical director: MM DD YY QC inspector: MM DD YY.