Chongqing air conditioning cleaning

Chongqing air conditioning cleaning

Chongqing air conditioning fluoride to find Chengbang, service phone: 023-86379229

1. Chongqing air conditioning removal and installation, warranty of one year,

2. Cleaning, fluoride. Warranty half a year.

3. Air conditioning repair after the opening of the warranty warranty, free repair within the warranty period.

4. Price in accordance with the air conditioning repair price list. Reasonable and transparent,

5. Repair materials genuine original, undertake Gree, the United States, Haier, Chigo, Hisense, Kolon after-sales service.

6. Door to door fast, 1 hour door to door,

Chongqing main city cleaning phone. Chongqing air conditioning repair,

Chongqing central air conditioning system maintenance program:

Chongqing central air conditioning 24-hour service hotline; < in the comments of this answer can be clicked to view "

Central air conditioning after a long period of time running air conditioning chilled water, cooling water system, refrigeration hosts and fan cooling discs inevitably appear scale, rust, sludge, Bacteria, algae and dust problems will directly lead to weakened refrigeration capacity, shortened service life, reduced operational reliability, energy consumption, resulting in increased operating costs. In order to save energy and reduce operating costs to develop a central air conditioning system maintenance plan.

I, chiller maintenance:

Project

Maintenance content

Implementation time

Responsibility

Remarks

Maintenance and inspection in normal operation

Check the compressor refrigeration oil oil pressure and oil quantity

Daily inspection

Duty

Personnel

System leakage detection (refrigerant), leaks found in a timely manner

Check for abnormal sound, vibration and high temperature

Check the temperature and pressure of the condenser and the cooler

Check the various valves are normal

Check the temperature and pressure of the water in and out of the water chiller

Check the main Circuit terminals and there is no loose compaction

Check the electrical control part of the anomaly; check the instrumentation, the controller's working condition

Check whether the unit lubrication system oil is sufficient

Check the refrigeration equipment safety protection device set value

Check the compressor refrigeration oil oil pressure and oil, if necessary, refrigeration oil replacement and replenishment of the compressor Motor insulation

Check and tighten the circuit of each wire contact

Check whether there is air in the refrigeration system, if so, the air should be discharged

Condenser

Evaporator

Maintenance (removal of dirt)

a) Preparation of 10% hydrochloric acid solution (add 0.5g of corrosion inhibitor to each 1kg of acid solution)

b)Remove the condenser, evaporator ends of the water in and out of the flange closed, and then filled with acid solution, pickling time of about 24 hours. Also available acid pump cycle cleaning, cleaning time of about 12 hours;

c) acid cleaning with 1% NaOH solution or 5% Na2CO3 solution for 15 minutes, and then finally rinse with water more than 3 times;

d) all cleaned, check whether the leakage, such as leakage, then apply for outsourcing maintenance; such as no leakage, then re-installed (such as flange sealing rubber gasket has been Aging should be replaced).

1 year/times

November/year

Power group

Personnel

Outsourcing

Important

Maintenance of the electrical control part

a) Do simulation tests on the intermediate relay and signal relay to check whether the action of both is reliable, and whether the output signals are normal or not, or else the intermediate relay should be replaced with one of the same type. Replace the intermediate relay and signal relay of the same type;

b) Apply for outsourcing maintenance if there is any problem with PC central processor and printed circuit board.

1 year/times

November/year

Power group

Electrician

Outsourcing

Compressor

Maintenance

a) Compressor motor insulation resistance (normal 0.5MΩ or more);

b) Compressor running current (normal rated value, three-phase basic balance);

c) compressor oil pressure (normal 10-15kgf/Cm2);

d) compressor shell temperature (normal 85 ℃ or less);

e) suction pressure (normal value of 4.9-5.4kgf/cm2);

f) exhaust pressure (normal value of 12.5kgf/cm2);

g) Check the compressor for abnormal noise or vibration;

h) Check the compressor for abnormal odor.

Through the above checks to comprehensively determine whether the compressor is faulty, if so, the compressor should be replaced (outsourced maintenance).

Daily inspection

Duty personnel

Electrician

Outsourcing

Check the compressor oil level, oil color. If the oil level is lower than 1/2 position of the observation mirror, then the cause of oil leakage should be identified and troubleshooting before filling the lubricant; if the oil has been discolored then the lubricant should be completely replaced

Two, the water circulation pipeline part of the maintenance:

Projects

Maintenance content

Implementation time

Responsible person

Remarks

Pump maintenance

a) Rotate the pump shaft, observe whether there is blockage, collision, jamming phenomenon, if it is a bearing problem, then add lubricant to the bearings or replace the bearings; if it is a problem with the impeller of the pump, then you should dismantle and repair the pump;

b) Check whether water leakage into the line at the pressure plate root, and if it is so, then you should add the pressure plate root.

30th of each month

Duty personnel

Electrician

Maintenance of throttle valve and regulating valve

a) Check whether there is leakage, if so then the packing should be pressurized;

b) Check whether the valve is flexible in opening and closing, if there is a large resistance then the valve stem should be filled with lubricating oil;

c) If the valve is cracked or opened and closed, then it should be replaced with one of the same size.

c)If the valve is cracked or fails to open and close, the valve should be replaced with the same specification;

d)Check whether the flange connection is leaking, if so, the sealing gasket should be dismantled and replaced.

Monthly 30th

Duty personnel

The whole circulating water system inspection and maintenance

Check the elastic coupling for damage, if so, the elastic rubber gasket should be replaced.

Clean the water pump filter.

Tighten all the fastening bolts of the water pump unit.

Clean the water pump unit shell, such as paint or rust corrosion is serious, it should be repainted again.

Check whether there is a large amount of condensate in the chilled water pipeline, cold air supply pipeline, fan coil pipeline, or the insulation layer has been damaged, if so, the insulation layer should be repaired or replaced.

30th of each month

Power group

All

Outsourcing

Motor repair and maintenance

a) Use 500V rocking meter to test whether the insulation resistance of motor coil is above 0.5MΩ, otherwise it should be dried or repaired;

b) Check whether there is any blockage in the motor bearing. If there is a lubricating oil should be added, such as adding lubricating oil is still not work should be replaced with the same type of bearing specifications;

c) check the motor wind blade there is no rubbing shell phenomenon, if there is a should be repaired and dealt with.

30th of each month

Power group

Electrician

Three, cooling tower part of the maintenance:

Projects

Maintenance content

Implementation time

Responsible

Remarks

motor part of the

maintenance

Maintenance

It is necessary to check with 500V rocking meter to see if there is a problem with the motor. p>The insulation resistance of the motor should be not less than 0.5MΩ by 500V rocking meter, otherwise the motor coil should be dried and treated, and the motor coil should be dismantled and repaired if it is still less than 0.5MΩ after drying and treatment.

30th of every month

Power group

Electrician

Check whether the motor and fan are rotating flexibly, if there is any blockage, then lubricant should be added; if there is any abnormal friction sound, then bearings of the same type and specification should be replaced

30th of every month

Power group

Electrician

a) Check whether the belt is cracked or badly worn. whether it is cracked or badly worn, if so, the belt should be replaced with the same specification;

b) check whether the belt is too loose, if so, adjust the inspection; check whether the pulley and shaft fit loosely, if so, it should be refurbished

Monthly 30th

Power group

Electrician

Overall Inspection

Check whether water is distributed uniformly by water distributor, if so, clean the pipes and nozzles. Otherwise, the pipes and nozzles should be cleaned

End of the month

Power group

All

Cleaning the cooling tower (including filler, water collection tank), clean the fan blades

Checking whether the recharge float valve is operating reliably, or else it should be repaired

Tighten all the fasteners

Cleaning the entire cooling tower exterior

Maintenance of end air cabinet:

Item

Maintenance content

Implementation time

Responsible person

Remarks

End air cabinet maintenance

Clean fan coil shell, condensate tray and condensate pipe

End of each month

Power Group

All

Clean the inlet and return air primary air filters, exclude the air inside the coil

Check whether the fan rotates flexibly, belt tightness. If the phenomenon of blocking or belt is too loose, should be filled with lubricant and adjust the motor distance. If there is abnormal friction sound then the fan bearing should be replaced.

With 500V rocking meter testing fan motor coil, insulation resistance should not be less than 0.5 MΩ, otherwise it should be refurbished. Check the capacitance of deformation, bulging or cracking, if so, should be replaced with the same specification capacitance; check whether the junction is firm, whether there are traces of overheating, if so, then make the corresponding repair

Clean the fan fan blades, coils, water trays on the dirt

Hydrochloric acid solution (inside the corrosion inhibitor) to remove the scale of the coil lining

Tighten all the fasteners

Five, Maintenance of all control cabinets:

Items

Maintenance content

Implementation time

Responsible person

Remarks

AC contactor maintenance

a) Remove carbide and metal particles in the arc extinguishing shield;

b) Remove dirt on the surface of the contactor and all around (but do not repair the contactor). file the contacts), c) replace the AC contactor with the same specification if the contacts are seriously ablated;

d) clean the dust and dirt on the iron core;

e) tighten all the fastening bolts

Weekly on Friday

Power Group

Electrician

Thermal Relay Maintenance

a) check the wire joints of the thermal relays There are no traces of overheating or burns, if there are, they should be refurbished and treated, and if they are not up to the requirements after treatment, they should be replaced;

b)Check whether the insulating cover on the thermal relay is intact, and if it is damaged, it should be replaced

End of each month

Power group

Electrician

Automatic air switch repair and maintenance

a)Measurement of the insulation resistance with a 500V rocking meter should be less than 0.5V. Insulation resistance should not be less than 0.5MΩ, otherwise it should be dried and processed;

b)Remove carbide or metal particles in the arc extinguishing cover, and replace it if the arc extinguishing cover is damaged;

c)Remove small metal particles on the surface of the contacts (don't repair the file)

End of each month

Power group

Electrician

Signal light

Indicator Instrumentation Maintenance

a) Check whether the signal lamps are normal, if they are not bright, replace the small bulbs with the same specification;

b) Check whether the indicator instrumentation is correct, if the deviation is large, then appropriate adjustments should be made, and after adjustment, the deviation is still large, it should be more

end of the month

Power Group

Electricians

Other Items

Clean dust and dirt inside and outside the control cabinet

Daily

Duty personnel

Check, tighten all the connectors, for serious corrosion of the connectors should be replaced

Sixth, the outsourcing of maintenance:

1, in the process of daily maintenance, if there is a need to replace the spare parts or can not be achieved to apply for an external supplier to deal with.

2, chiller annual maintenance according to the requirements of the contract for the sale of negotiated processing, such as the costs incurred by the two sides to negotiate another charge.

VII, 2012 central air conditioning unit maintenance plan according to the annex.

VIII, through the above maintenance of the central air-conditioning unit is expected to achieve the following types of results:

1, protection of equipment, prolonging the service life: it can prevent rust, scale. Avoid equipment corrosion, damage, especially after preventive treatment, so that the service life of the equipment doubled, after putting into the corrosion inhibitor, can make the equipment system corrosion rate decreased by 90%.

2, reduce accidents, improve refrigeration effect: can sterilize algae, remove sludge, make the pipeline smooth, clear water. At the same time to improve the heat exchange efficiency of the condenser, evaporator. Thus, avoiding high-pressure operation, overpressure shutdown phenomenon, improve chilled water flow, improve the cooling effect, so that the system runs safely and efficiently.

3, energy and water conservation, reduce costs: in the removal of scale, prevent scale formation, improve heat exchange efficiency at the same time, reduce the consumption of electricity or fuel. Water treatment also reduces the amount of sewage and improves the utilization rate of circulating water. Thus, production costs are reduced.

4, substantial savings in maintenance costs: untreated central air conditioning, there will be equipment piping clogging, scaling, corrosion, overpressure shutdown or even failure. Such as: running the system due to corrosion leakage, resulting in solution contamination, it is necessary to