Process engineer year-end work personal summary

For engineers, we may not know much about process engineers, we are unfamiliar with the matter, but also do not understand what their main work? Then take a look at their work summary bar. Below by me to bring you the process engineer year-end work personal summary model, take a look at it!

Process Engineer year-end work summary (a)

20X year into the constant drill this big family, along with the constant development and expansion of the drill, and now is about to go through 20__, ushered in 2020 new year. In the past year, I am mainly responsible for the X process. It is also this year, due to the leadership of the production process optimization of the importance and support, so that I can give full play to their own ability, for the company process optimization and cost savings to contribute to a force. In the work, through the communication between departments, and the discussion with external specialists, not only increase their professional knowledge, and make their communication and coordination skills further improved. However, the bad quality inspection reports and returns from customer X also reflect the inadequacy of my work and the need for improvement. Such as Empiricism is strong, the systematization of the work, the operation of the process is not strong; as a process writer, some departments of the production process is not enough experience. Now on the work of 20__ year to do a review, summarize. In order to do a good place to continue to carry forward, inadequate place to make improvements, and strive to do better in 2014.

First, 20__ year summary

1, production process optimization participation and promotion. Starting from the beginning of this year, often do the product, each drawing are printed a process table, in which the development of a detailed process, each department has a detailed operation details, size control requirements, the size of the amount of retention, and batch product size benchmarks of the unified requirements, in each of the operation process after the addition of the "precautions" column to emphasize that the process is prone to, often the case, the production process optimization and promotion. This process is easy to appear, often the potential quality problems, to the attention of the processor to avoid the recurrence of old problems, the product of the batch scrap. Drawings with precision dimensions, shape and location tolerances with red or green highlighter for eye-catching labeling, so that each operator focus on control. For complex products (such as 02-01712A 02-04283A) also produced a clamping guide, with text, pictures, is more clear to the operator of the product where the benchmark, how much to leave the amount of machining after the size of what is OK. For cams and other irregularly shaped products, in the process table or drawings will be inserted into the size chart to prevent the size of the material is not reasonable.

2, the development of various operating standards and norms. Through the reference and summarize, and combined with our company's own production, equipment characteristics, the development of "milling machine operating instructions", "X-bed operating instructions", "workpiece placement, transfer operating instructions", "marble operating standards guidebook" and other operating norms. The new material magnesium alloy material characteristics, processing precautions guide book. Our company finally passed the international ISO certification this year, in order to implement the 5S, combined with the actual situation of our company, is now developing the X department, milling machine department, turning and grinding department work surface operating instructions, each department of the public **** fixtures, utensils operating instructions. The purpose is to standardize the operating standards of the work area, to prevent the production of materials, the workpiece bruises, processing reverse, leakage of processing problems. So that our work environment is more neat, clean, reduce processing time, further improve efficiency and quality.

3, the production of problem points in the tracking and processing, to ensure product quality. Every morning I will receive the factory QC quality inspection report and the customer's quality of the abnormal table mail, which detailed records of each bad product specific bad size data, quantity. Such as the appearance of scratches, the precision of the size of the excess how much, the shape of the tolerance of the excess how much, etc., I will analyze the reasons against the drawings of one by one, to the workshop to communicate with the staff, listen carefully to their processing views, resulting in bad and scrap reasons, and in a timely manner to improve the refinement of the process, the design of professional tooling and jigs, to solve the quality of the problem at the root. There are processing difficulties, actively communicate with customer engineers, improve the design requirements, increase the process of lap position, process hole position, optimize the processing of the product.

Second, 20__ year planning

Promote the standardization of the production process:

(1) the product is divided into general products and high-precision products, processing high-precision products before the convening of a meeting of the leaders of the relevant departments to discuss the entire product machining difficulties, each express their views, to take the strengths, the formation of a feasible process. For mature products, combined with product characteristics, the usual quality of abnormal reports, the staff's operating proficiency, and gradually optimize the production process, and constantly improve production efficiency and product quality.

(2) to further develop the production operation standard guide, standardize the production work of the staff, clear production responsibility, through the above two efforts to make our company's production has a sloppy into a controlled, disorderly into a standardized.

Under the guidance of the company's strategic policy, with the strong support of the leadership, with everyone's concerted efforts, *** with the efforts, I believe that in 2014 I will do better; I believe that in 2014 Hengdrill can achieve more brilliant results.

Process Engineer year-end work summary (II)

This year, the individual work has made considerable progress, and better completed the 20__ annual work objectives. Now the personal work of the year 20__ is summarized as follows:

First, serious study, ideological and political performance is good

I am the principle of "serious study, down-to-earth work, upright people, happy life". For myself, I am strict requirements, work seriously, treat people sincerely, words and deeds are consistent, the same as the table. Do abide by the law, modesty and prudence, decent style, with good ideological quality and professional ethics. Positive demand for progress, unity and friendship, courtesy and integrity. In terms of political theory learning, to participate in the party group organized by the study 10 times, and conscientiously take notes. I have been emphasizing a saying that goes like this: the straight line between two points is the shortest, there is no shortcut to success, no detour is a shortcut. Now it does not seem so, because in my mind or emphasize the word shortcut, want to shortcut will take a detour.

Second, digging potential to increase efficiency, better completed the work

1, as a regional process engineer, the construction of various systems can not be left behind, only a good, completed system to guide the site, including safety, quality, management, production activities carried out smoothly. In the current year, I conscientiously implement the section, the operation of the leadership of the region arranged by the system work, responsible for completing the hooded furnace unit quality system, safety system, has been and the production management system document preparation, self-check self-check, and ultimately successfully passed the audit without failing.

2, with the substantial increase in the speed of the leveling machine, the capacity of the leveling machine has also been a huge release, there have been a number of times due to the cover back to the insufficient preparation of material caused by the leveling machine production limit. In response to the bottleneck problem of the hood furnace, the plant leaders organized two production coordination meetings respectively, and decided to carry out team competition activities in the hood furnace unit, the main purpose is to enhance the staff's labor enthusiasm, to break through the limitations of the production organization capacity, and to maximize the hood back to play the production capacity. After receiving the notice of the activity, we quickly formulated a specific plan for the competition, and came up with measures to effectively enhance the cover back production capacity, and strive to ensure a low failure rate of the equipment, and grasp the node time of loading and discharging, and successfully completed the labor competition in April and May, and finally the cover back production exceeded 62,000 tons, reaching the best level in history.

3, the cold rolling hood retreat unit put into operation for a relatively short period of time, with the development of production, safety issues, quality issues, management issues come to the fore, there are still some lack of management, loss of control, according to the results of the self-inspection and self-inspection, in a timely manner, compiled, updated management documents, summed up the experience of accidents, and organization of the unit staff focused on training for more than 15 times, the accident rate of the operating position has decreased significantly, the site to organize the production and management of the order, has been the basic elimination of the lack of control, loss of control. The basic elimination of the lack of management, lost control of the project.

4, the cover back to the unit's work can be seen to a large extent as a safety work, do a good job of safety, cover back to the basic work can be considered to be done. Safety work is specifically reflected in the three standards, this year, completed the "hood furnace operation, technical regulations" of the revision, consolidation and curing of eight documents. Completed the revision of the three major standards of safety, including the revision of 54 items of safety standards, regulations revised 12 items, new regional habitual violation of 3 items, the new hydraulic trolley safety operating procedures, new "hooded furnace unit crane, finger lifting personnel operating norms," and other documents, to complete the hood back to the unit closure management and the development of the relevant management approach, so that the hood back to the regional safety work to enhance a high level.

5, the development of new products, product quality control and process adjustment is the focus of my work. This year, I participated in the Geely automobile plate, IF steel development project, the implementation of the cover back process discipline, to ensure that the new development of steel in the cover back unit normal production, and timely feedback production data to ensure the progress of the development of new steel. This year, participated in the youth thesis defense activities, wrote the "cold rolled thick specification strip tail bonding cause mechanism analysis" thesis material. June WISCO experts on-site guidance, I actively communicate with industry experts, consulting, learning new processes, new methods, for our cold rolled products to solve the thin specification bonding defects to contribute to the same for the cover back unit process improvement experience.

Third, analyze the shortcomings, look forward to 2020

1, the lack of relevant professional knowledge has become a serious barrier to technological breakthroughs.

As a process engineer, in addition to the implementation of the process system, there are many management responsibilities, which requires process engineers in addition to a deeper grasp of the normal process, must have a certain understanding of mechanical, electrical, hydraulic and other related knowledge. In the next year to learn related professional knowledge should be included in the focus of the work.

2, the unit technical annexes of the lack of digestion has become a major bottleneck to carry out the work.

In this year, a lot of problems have not been fundamentally resolved, the ultimate reason is that the principle of the equipment does not understand, technical information digestion is not thorough. For example, the current limitations of the cover back to enhance the calorific value of the capacity of the problem of delayed solution, full confidence in the hope that the gas station to get the equipment transformation, not from their own equipment, to seek solutions to the problem, specifically reflected in the individual personnel on the parameters of the equipment do not dare to easily change for fear of accidents, for fear of not being able to restore. Fear, because do not understand, did not grasp, reflecting the deeper problem of the principle of the equipment does not understand, technical information digestion is not thorough. Therefore, in the next year's work in the equipment work will also be included in the focus, so that the root of the equipment to know the basics, operating ease, control at will.

3, the work of dragging the style of work has become the primary factor affecting the improvement of business level.

Attitude determines everything, the attitude of work determines the efficiency and quality of work. In this year, I can clearly feel the slack in their own thinking, a lot of work to cope with, the completion of the quality is not high. There is always the idea of delaying what should be done today until tomorrow. Everything is left until tomorrow to deal with the attitude of procrastination, which not only hinders the progress of the vice, but also deepen the pressure of the work. x said: "grasp today is equal to have twice the tomorrow." Therefore, to improve the level of business must first change the concept, change negative into positive, turn passion into power.

Process engineer year-end work summary (three)

The work of the craftsman is busy, at the same time, the process of this link for the production is crucial. Process plays a guiding and supporting role in production. The good or bad work of the process directly affects the smooth progress of production, and at the same time largely determines the workshop kpi related indicators of good or bad, thus affecting the company's efficiency. Therefore, the ability of the workshop process technology team often determines the quality and efficiency of workshop production.

As a member of the workshop process team, I think the biggest problem I have now is the lack of experience, can not be very skillful in solving the problems that arise in the production, for a number of things can not make sense of the clues, about the work of a number of aspects of the work can not form a good system.

Process table production, can skillfully produce process table, but individual process can not do the best. When I see a brand name, I can't clearly know its formula structure, technical requirements, production process conditions, testing items and related standards. It is necessary to learn, accumulate and summarize in the future work, quickly grasp the relevant knowledge and information, and accurately and quickly make the process.

Not very familiar with the relevant interfaces and processes. Encountered some specific problems, often need to consult others. Work style and method is not mature enough, and communication with other positions lack of experience. In this regard, we need to humbly ask our "seniors" for advice, and grow rapidly in technology and master the process related operations, and integrate into the position and the team as soon as possible.

In terms of exception handling, I am able to skillfully handle simple exceptions, but I am still inexperienced in handling some special exceptions, and my reaction speed is not fast enough. When anomalies appear, you need to react quickly, take decisive measures, and promptly contact with manufacturing engineers, qe, color matching, pilot and other related technical personnel and deal with them together. On the other hand, we need to accumulate more experience and grow up quickly, so that we can be on our own as soon as possible.

For the present work and future work position, need to learn more, think and summarize, more with experienced technical and management personnel to communicate, and timely feedback to the superiors of their own learning and work situation, timely detection of their own problems and shortcomings and improve.

The growth and development of an individual needs to rely on the team, while the self-efforts are crucial. For the current work and state, I feel good about myself. In these six months, I have learned a lot and grown rapidly. I am very happy with the environment I am in and I am working very hard to learn and work.

Process Engineer Year-end Work Summary (4)

Looking back on this period, I am committed to the study of theoretical knowledge and the improvement of practical hands-on ability with the vigor, perseverance and enterprising spirit of young people, and I keep repeating the words "read ten thousand books, travel ten thousand miles" and "practice, practice, practice". I keep repeating the life path of "reading thousands of books and traveling thousands of miles" and "practice produces true knowledge". The annual professional and technical assessment were qualified, now the first half of the work is summarized as follows:

First, ideological and political

With high morale and full of enthusiasm to create new performance, create a new life. To be able to persistently carry forward the "tree of righteousness, unity, and development" theme, in various jobs, dedicated, dedicated, pioneering and enterprising, and better complete the work tasks.

Second, business

1, cost consulting

The main content of the cost consulting work is:

investment estimates, the preparation and review of the project's economic evaluation report; the preparation and review of the budget of the construction project and the analysis and control of project cost; project settlement and completion of the final (final) report preparation and review of the cost of the project. The service.

I work in the cost consulting department period, from the basis of a little bit from the start, learning while working, has participated in, presided over or independently completed the X City Fire Armed Police detachment police apartment building project (18,000 square meters, 15 floors above ground, frame shear wall structure), X City X Avenue renovation (length of 3,250 meters, asphalt concrete pavement), the X County landfill (covers an area of 1.4 square kilometers, 15 monolithic buildings), the X County landfill (covers an area of 1.4 square kilometers, 15 monolithic buildings), the X City X Avenue renovation (length of 3,200 meters, asphalt concrete pavement). square kilometers, 15 monolithic buildings), X County Sewage Treatment Yard (covering an area of 1.3 square kilometers, 12 monolithic buildings), X Vocational and Technical College Science and Technology Laboratory Building (building area of 18,990 square meters, eight floors above ground, frame structure), X Farm Residential Subdivision (****eight residential buildings, with a total floor area of more than 40,000 square meters), and X City's X Tianjie Commercial and Residential Complex Project (with a total floor area of 12 10,000 square meters, mixed structure) of the budget estimates, project budgets, bill of quantities and cost analysis of the preparation, audit work.

Also participated in the X community (total area of 100,000 square meters, eight residential buildings, frame or box shear structure), X County National Grain Reserve warehouse (special engineering), X City Public Security Bureau of the Civilian Police District (successive **** 24 residential buildings, a total area of 180,000 square meters) of the cost audit, project settlement audit work.

Through these budget, settlement, audit work, so that I have a flexible grasp of the use of budget software and civil construction budget essentials, and the plumbing, heating and electricity, warehousing, municipal aspects of comprehension.

2, the bidding agent work

successively organized, presided over the completion of the X City Fire Armed Police detachment officers apartment building project, X Avenue renovation, X County sewage treatment plant, X Vocational and Technical College Science and Technology Laboratory Building, X Vocational and Technical College Clothing Training Building, X Farm Residential Complex, X City World Trade Street commercial and residential complex projects, X Community, X City Public Security Bureau of the Civilian Police District, X County National Grain Reserve Warehouse, X College Public * * *, X County National Grain Reserve Warehouse, X County National Grain Reserve Warehouse. Reserve warehouse storage, X College public **** teaching building, X Square, more than 300 projects, more than 500 sections of the bidding agent work.

Professional design of industrial buildings, civil buildings, warehousing, municipal infrastructure, highway traffic engineering, pipeline engineering, landscaping projects in a number of specialties and design, construction, supervision, services, equipment procurement and many other aspects. These jobs have enabled me to master the operational skills of bidding work and data collection, compilation, organization, archiving, and other bidding agent all the knowledge of the whole process.

Because of the solid work, the bidding work involved in the presidency of the successful completion of the work, by all walks of life consistent affirmation and praise. Because of outstanding work, solid business level, good communication, had a long time as a bidding agent department head.

Third, professional learning

Learning is never-ending, in line with the "do a line, love a line, learn a line, specialize in a line" belief, I have been insisting on professional and technical knowledge and auxiliary knowledge of learning. Successive self-study of engineering cost related knowledge, bidding agent laws and regulations, government procurement knowledge, project management expertise, basic mastery of the industry's various basic theoretical knowledge, mastered the focus of the work, the node.

The development of modern society is changing rapidly, the knowledge update is very rapid, if you do not supplement the new knowledge in a timely manner, do not often uninterrupted learning and communication, can not adapt to the needs of the enterprise technology management work, will be eliminated.

To this end, the use of all opportunities to participate in a variety of training courses, technical exchange activities. In the assistant engineer period, has participated in many relevant departments to organize a variety of thematic training. Has participated in the "construction contract administrator post training", "X province bidding agent induction training", "cost training", "cost engineer Education", "Tenderer Training" and "X Province Government Procurement Training", and obtained the qualification of "X Province Contract Administrator", The company has obtained the qualification of "X province contract administrator", "second level cost estimator", "bidding agent practitioner" and "X province government procurement practitioner" post certificates.

Through a variety of continuing education training courses, so that I maintain a strong desire to learn, but also let my own professional and technical level is constantly improved.

In the study of professional and technical knowledge at the same time, but also strive to explore and research computer software, hardware knowledge, Microsoft office series office software and autocad series software successfully applied to the daily construction management, in the continuous learning and practice, and strive to promote the project management of the paperless management, the application of word to complete the work of word processing, printing of a variety of records and forms as well as text materials. The company's business is also a major player in the construction industry.

The application of excel to complete the storage and analysis of engineering information processing, to provide quantitative basis for engineering decision-making.

Through continuous learning, I have gradually grown into a knowledge-based, communicative and enterprising talents, enhanced my sense of social responsibility, and set up a noble goal.