Rainy season emergency plan example (General 5)
In our learning, work or life, sometimes there are some events that are not expected, in order to reduce the consequences of the accident, it is necessary to carry out a careful preparation of the emergency plan in advance. How to prepare an emergency plan? The following is my collection of rainy season emergency plan model (general 5), only for reference, we take a look at it.
Rainy season emergency plan 1
Purpose: In order to ensure the normal life of the owners, work order operation and the safety of life and property, to ensure the normal operation of the equipment, so that the buildings and facilities and equipment in the summer safe flood control
Scope of application: the company's jurisdiction over the project.
Supervision of implementation: project manager. (The second working hours for the duty manager)
Responsibilities: Project Property Department, Engineering and Technology Department, Safety and Preventive Department is responsible for the supervision and implementation.
Flood emergency procedures:
I. Flood control organizational procedures
1, in the flood season before the arrival of the establishment of the flood control team, the project manager is the leader, the head of the Engineering Department as deputy leader, the team members of the Department of Security Supervisor, the head of the Department of Property and the Duty Manager;
2, in the case of dangerous situations, the project Manager is responsible for the deployment of material resources, manpower, the director of the Ministry of Engineering is responsible for on-site command, customer service center manager, security manager is responsible for the deployment of the Department of personnel to cooperate with the rescue and relief. When the danger occurs at night and double holidays, the duty manager is temporarily responsible for the command, and timely notification of other members of the flood control team rushed to the scene.
Second, the Ministry of Engineering flood control measures
1, the establishment of a special storage library for flood control equipment, storage of flood control equipment, mainly should be a number of submersible pumps, drainage hoses, waterproof switchboard, woven bags, sand, shovels, etc.;
2, the key to the library of flood control equipment should be in the Department of Security, the Ministry of Engineering and Technology, the Department of the project each Store a;
3, before the arrival of flood season, the Ministry of Engineering maintenance personnel and security patrols should be carefully inspected
(1) the roof platform drains are unobstructed, and at the same time will be the roof of the garbage clean;
(2) check the underground puddles of sewage pumps are sensitive and effective, and will be put in the control of "automatic" position;
(2) check the underground puddles of sump pumps, and put the control in the "automatic" position;
(3) check the underground puddles of sewage pumps, and put the control in the "automatic "position;
(3) check the building inside and outside the rainwater wells, sewage wells, rainwater pipe whether there is a buildup, and to remove, to ensure smooth drainage;
(4) check the power distribution room, central control room and other important rooms whether there is a leakage, if any should be dealt with in a timely manner.
Third, the risk of dealing with procedures
1, if the rainwater into the underground machine room, the Ministry of Engineering staff should be timely start sewage pump drainage, and sandbags to block the door of the machine room to protect a variety of important equipment. At night and on double holidays, the duty manager on the one hand to organize personnel to rescue, on the one hand, immediately notify the project manager and other members of the flood control team;
2, security personnel by the security department manager command, a part of the personnel to maintain order, a part of the personnel to assist the Ministry of Engineering to remove the danger, rescue equipment;
3, the Ministry of property personnel to remove the various parts of the accumulated water;
4, the danger of After the occurrence of a comprehensive inspection, statistics on the damage caused by the flood and material consumption, and timely replenishment of flood control materials, ready for the next flood control;
5, the incident handling process to be recorded in detail, by the project manager to the leadership of the company to make a report.
Rainy season emergency plan 2
First, the purpose
In order to protect the workers' life safety, to ensure that when the rainy season flood season comes, to ensure the safety of life and property of the project personnel, to protect the construction site of the normal construction, to control the damage to a minimum, according to the national, provincial, municipal and county documents on flood control, and for this purpose to formulate the "Sichuan Hangjian". Foxconn employees protective housing (a) the fourth section of the project project department rainy season flood emergency plan.
Second, the organization
Sichuan Hangjian Foxconn employees protective housing (a) the fourth section of the Ministry of the rainy season flood emergency leading group:
Leader: Liu Zhi.
Deputy head: Yan Bing.
Members: Dong Lei, Yu Heng, Lin Xiaochun, Wang Lizhong, Wang Zhonghua.
Sichuan Hangjian Foxconn employee security housing (a) the fourth section of the project department rainy season flood emergency rescue leading group located in the project office.
Third party rescue contact:
First aid telephone 120, alarm telephone 110, fire telephone 119
Third, the basic principles
Flood control work adhere to the "safety first, unremitting, preventive-oriented, full emergency" policy.
Flood control work adhere to the "safety first, always be prepared, prevention-oriented, all-out rescue" policy, actively develop and implement flood control planning, strengthen drainage measures, scaffolding reinforcement, and electrical equipment management inspections, strengthen the collection of weather forecasts, so as to prevent accidents before they occur.
(1), (Liu Zhi) is responsible for on-site guidance, and do a good job of coordination with various departments.
(2), (Dong Lei), (Yu Heng), (Lin Xiaochun) is responsible for tracking and checking the construction and finished product protection of each work surface.
(3), (Wang Lizhong) is responsible for the safety management of the construction site, and do a good job in the rain and summer construction safety education.
(4), (Yan Bing) is responsible for the site of the reasonable stacking of materials, rain and moisture, all kinds of machinery and equipment maintenance, and do a good job in the preparation of flood control equipment.
(5), (Zhang Chengyi) is responsible for the temporary electricity, equipment and machinery insulation inspection, to prevent the wire broken skin, leakage, etc..
Fourth, the preparation of materials:
According to the specific circumstances of the project, prepare the equipment and materials used in flood control. Prepare pumps, water pipes, tarpaulins, shovels, etc., the equipment required for rain prevention should be prepared sufficiently, the required equipment must be maintained in good condition.
No. Material name unit quantity Remarks
Rainy Season Emergency Plan 3In order to improve the ability to resist the rapid response to the construction of large-scale safety accidents, to prevent the city in the event of flooding, to protect the safety of the construction and personal safety, to minimize the loss of accidents, to maintain social stability, to quickly remove the danger caused by flooding, to reduce the loss of, and to formulate this plan.
First, the scope of adaptation:
The implementation of this program applies to the city's administrative area of the construction of the construction site to prevent news.
Second, the organization:
(a) Jiyuan City building construction site flood control leading group is the organization of this emergency plan. City building construction site flood control emergency leading group list:
Leader:
Deputy leader:
Members:
Leading group set up an office, the office is located in the safety section, Liu Jie is the director of the office. Under the unified command of the leading group, the office is fully responsible. The office set up communication and liaison group, material security group and emergency rescue group. Communication and liaison group: responsible for internal and external communication and liaison, should be equipped with communication and liaison tools, keep in touch at all times. In the event of casualties and major safety hazards, immediately contact the relevant departments to implement rescue, while reporting to higher authorities. Material security group: responsible for rescue and flood control materials custody, distribution. With enough raincoats, rain shoes, water pumps, lighting, pick and shovel, straw bags, ropes and other emergency supplies and bandages, stretchers and other medical supplies; set up emergency evacuation of safe channels and safe places to ensure that once the danger occurs, the scene can be evacuated and resettled in a timely manner. Emergency rescue group: the establishment of emergency rescue team, equipped with rescue equipment, responsible for the scene of the emergency self-rescue rescue. Flood season to ensure that the emergency team to remain on standby at all times, all types of emergency vehicles to maintain adequate fuel, running well. Once the flood came, to ensure that personnel, equipment in place in a timely manner, rescue in time.
(b) The main responsibilities are to implement the orders of the higher level, the development of the work program; supervise the construction sites to implement the leading group of preventive measures; report to the Municipal Construction Commission on the progress of flood control, at any time to ensure that the top of the situation, the bottom of the situation reported; coordination of the work of all relevant units and departments.
(C) the implementation of a strict 24-hour duty system, to maintain smooth communication, strictly prohibit duty personnel off duty. Set up a person to collect weather information every day, once there is a flood, should immediately start the plan.
Third, the responsibility of the system:
(a) the responsibility of the construction unit
1, the implementation of the construction site to prevent the work of the supervision and inspection, supervise the construction, supervision units to grasp the implementation of the measures to prevent the news.
2, timely disbursement of project funds to ensure that all units of anti-noise work funds.
3, due to the occurrence of flooding may have an impact on the surrounding buildings, structures and power lines and other public **** facilities, should coordinate with various departments in a timely manner to properly deal with.
(B) the responsibility of the construction unit
1, the establishment of a sound construction site news organization, set up a special team is specifically responsible for the implementation of the news of the implementation of the work of the news, the news of the work of the responsibility for the decomposition of each post to ensure that the responsibility of the person, the implementation of measures.
2, actively do a good job in the construction site to prevent the news of the work, to fully and timely grasp of the project dynamics, the timely elimination of potential safety hazards, the key content, key aspects of the key inspection and monitoring.
3, to carry out the news emergency plan drill work, to ensure that once the plan is activated, personnel in place, materials in place, equipment in place, rescue in a timely and orderly manner.
Fourth, the key inspection and monitoring content
The construction site to implement a strict pre-flood inspection, flood monitoring, post-flood review of the inspection and monitoring system. Arrangements for specialists to share responsibility for the site of the temporary construction facilities, fence boom, pit facilities, lifting and transportation machinery, scaffolding, construction of electricity and other items to focus on inspection and monitoring.
(a) Pro-construction facilities Pro-construction facilities include: dormitories, canteens, office rooms, toilets and so on. Monitor the responsibility of the person: a comprehensive inspection of the pro-construction facilities, such as cracks, tilting, deformation phenomenon, take timely reinforcement, refurbishment, failing to meet the requirements must be demolished and rebuilt; stormy weather must be arranged for uninterrupted inspection; at any time to observe the impact of wind and rain on the pro-construction facilities, the damage and the pits, scaffolding, tower cranes, etc. may be pro-construction of the destruction of the building, such as the danger of immediate pro-construction of the people inside Transfer to a safe place.
(ii) enclosure wall enclosure wall includes: color pressure steel plate enclosure wall. The responsibility of the monitor: a comprehensive inspection of the safety of the enclosure wall, such as damage, tilt, deformation and other phenomena, and take timely measures to strengthen, replace and so on; especially to strengthen the focus on the street enclosure wall guardianship, such as danger, immediately set up a perimeter of the enclosure wall warning isolation facilities and set up a special care, to prevent the wall from collapsing and injuring people.
(C) pit project: pit facilities include: slope protection, pile foundation construction, earth and stone excavation. Monitor the responsibility of the person: at any time to observe the pit slope sidewall changes, pit support with or without variations, pit adjacent to buildings, structures, changes in the situation; adjacent to the street, buildings, mountains, adjacent to the construction of facilities in the pit to focus on checking the guardianship; once the arrival of the flood, immediately stop the construction, to prepare adequate drainage equipment, equipment, drainage of the pit in a timely manner. After the flood season for a comprehensive inspection of the pit, no safety hazards before construction.
(D) lifting and transporting machinery lifting and transporting machinery, including: tower cranes, passenger and freight elevators, material hoists. The responsibility of the monitor: more than six windy weather should immediately stop the operation; focus on monitoring the stability of the lifting and transporting machinery foundation, drainage, the pit on the tower crane; to focus on the inspection of the tower crane dense, multiple operations in the district, adjacent to the high-voltage lines and buildings of the tower crane, such as failing to reach a safe distance must be immediately removed.
(E) scaffolding works scaffolding works include: floor scaffolding, cantilevered scaffolding, overall lifting scaffolding, basket frame, etc.. Monitor the responsibility of people: more than six windy weather, scaffolding construction work is prohibited; focus on monitoring the scaffolding foundation settlement, drainage, to ensure that the foundation is solid, frame tie effective; near the streets, houses, high voltage lines, focus on monitoring, dangerous scaffolding should be set up within the scope of the warning isolation, and set up a special person to monitor. After the flood season, the scaffolding for a comprehensive inspection and acceptance before construction.
(F) temporary electricity temporary electricity, including: construction electricity, living electricity. Monitor's responsibility: a comprehensive inspection of the construction site of all types of temporary power facilities, distribution lines, the strict implementation of the three-phase five-wire system, to ensure that three-level power distribution, two-level protection, all types of distribution facilities, rain protection facilities intact; rainstorms should be cut off immediately from the total power supply, and prepare for emergency lighting equipment. After the flood, the distribution system for a comprehensive inspection and acceptance, in line with the safety requirements, before power supply construction.
Fifth, related matters
In accordance with the requirements of this plan, the full implementation of the flood control work of the precautionary measures, and the timely elimination of potential safety hazards. At the same time to strengthen the combat drills, maintain a high degree of readiness to ensure that in the event of flooding, can be efficient, orderly and timely rescue, minimize losses. In the flood control work in the action of slow, ineffective measures, the responsibility is not implemented, resulting in responsible accidents, will seriously investigate the responsibility of the responsible units and responsible persons.
Rainy season emergency plan4
Rainy season "three defense" emergency plan
I. General
1, the preparation of the purpose
To do a good job of the company's coal mine flood control work, to improve the arrival of the rainy season to the major disasters and accidents triggered by the rapid response ability to rescue and relief, to prevent and prevent the occurrence of floods. To improve the work of the company's coal mine flood control, to improve the rapid response to major disasters caused by the arrival of the rainy season, to prevent further expansion of the disaster, to protect the personal safety of workers, collective property from loss and the safe operation of the units, the formulation of this plan.
2, the preparation of the basis
National "Emergency Preparedness Guidelines", "Flood Control Law", "Water Law", "Flood Control Regulations", "National Overall Emergency Response Plan for Public Emergencies", "National Emergency Plan for Flood Control and Drought Relief" and so on.
3, the scope of application
This "plan" applies to the company's coal mining enterprises due to natural or man-made factors caused by flooding, storm waterlogging, waterlogging in the collapse zone and other disaster events of defense and disposal.
4, working principles
This "plan" fully embodies the people-oriented, prevention-oriented, prevention and rescue combined, adhere to the idea of combining engineering and non-engineering measures, adhere to the administrative leadership system of responsibility, unified command, unified scheduling, division of labor and cooperation, each in its own way, all-out rescue, ensure safety.
The second key protection object
All the company's business personnel; the company's coal mine industrial plaza, underground engineering, underground production system equipment, the ground of the mining highway, the ground of the mine high-voltage power supply lines, the ground and the underground communication system; the company's various business units of the ground facilities.
Third, the emergency rescue organization and responsibilities
1, the organization
The company set up the rainy season "three prevention" emergency rescue headquarters, headquarters in the scheduling center.
Commander-in-chief: Zhang Yong, chairman of the board of directors
Deputy commander-in-chief: Qiu Jiagui, deputy production manager; Tan Jincheng, deputy safety manager; Ke Yueheng, chief engineer.
Member units: scheduling center, geodesy section, safety monitoring department, mechanical and electrical supply department, one pass, three prevention department, coal mining team, administrative office, monitoring room, trade unions, discipline inspection office, security department, logistics department, medical office.
Director: Director of the Dispatch Center
2, responsibilities
Command: mainly responsible for coordinating the operation of various departments during the accident emergency rescue, co-ordination of all emergency rescue operations, emergency rescue for the scene to provide a variety of information to support the implementation of rapid and accurate development of the implementation of disaster relief programs.
The commander-in-chief: fully responsible for the organization and command of the flood emergency disposal.
Deputy commander-in-chief: to assist in the organization of flood emergency relief work.
Member units: obey the commander-in-chief, deputy commander-in-chief of the instructions, to complete the tasks assigned. Specifically:
(1) scheduling center: responsible for summarizing weather forecasts, transmission of information on flood season, arranging flood duty, organization and coordination and check the progress of the "three prevention" key projects and the "three prevention" work report. Responsible for the rescue program, the organization of the scene of the emergency rescue and rescue operations, listen to the orders of the command, responsible for the neighboring mine rescue team for help contact.
(2) Geodetic Section: Responsible for hydrological observation of the shaft and the lower part of the shaft, regular observation of surface rivers, coal mining subsidence water, cracks, etc., arrange waterproofing projects, organize the "three defenses" inspection, and do a good job of water prevention and control during flood seasons. It is responsible for the prediction of anti-drainage of underground mining and digging faces. It is responsible for providing technical information such as geological parameters of water breakout points in each coal mine and providing technical guidance.
(3) Safety Supervision Department: Responsible for supervising and checking the progress of the "three prevention" work of each unit (focusing on coal mines). Supervision and inspection of the construction unit to do a good job of "three defense" and ground drainage ditch excavation, maintenance of leaky houses, waterproofing project construction work. Responsible for the inspection of water accumulation at the entrance of wind wells and underground ventilation lanes. Responsible for supervising the implementation of accident rescue programs and safety measures, and organizing or assisting in the investigation of accidents.
(4) Electrical and Mechanical Supply Department: Responsible for the "three defenses" of the power supply system in the well and underground. Setting and testing of various lightning facilities, underground electromechanical equipment, drainage equipment to carry out efficiency measurements and ensure that the drainage system can run at full capacity, will be a variety of test results reported to the company in a timely manner, "three defense" office.
Rainy season emergency plan 5
A rainy season construction emergency plan
1, the organization of the establishment of the rainy season construction organization
In the rainy season construction time, the Ministry of the project and the project of the construction section of the sub-district organization to set up a leading group of flood control and rescue and disaster relief team. Pay attention to the weather forecast and take precautions. If there is any danger, immediately organize rescue, try to minimize the loss, and can resume production in the shortest possible time.
Flood control leading group is headed by the project manager, the rescue and relief team is headed by the deputy project manager, and the members include personnel from various departments and offices of the project department.
2, flood control system during the rainy season
(1) Strengthen the contact with the weather station, pay close attention to the weather conditions during the rainy season.
(2) During the rainy season, the work shift is set up on duty, 24 hours on duty, and found that the unexpected situation immediately reported to the members of the leading group of flood control.
(3) during the rainy season construction, strengthen the inspection of various flood control facilities and equipment, timely detection of problems, and immediately deal with them, to eliminate hidden dangers before they occur, to ensure construction safety.
(4) when it rains, set up a person to monitor the construction site and the surrounding pipeline, drainage system, found that the problem must be immediately reported to deal with.
3, rainy construction pre-control measures
(1) rainy construction should be done to prevent rain, lightning, electricity, flood control and other work.
(2) Before the rainy period construction should be based on the rainy period construction project to prepare rainy period construction measures, the required materials should be prepared before the rainy period construction.
(3) to do a good job of construction personnel of the rainy construction training, organize the relevant personnel to carry out a comprehensive inspection of the construction site preparation, including temporary facilities, temporary power, machinery and equipment and other items of work.
(4) check the construction site and production and living base of the drainage facilities, dredge all kinds of drainage channels, clean up the rainwater drainage outlets, to ensure that rainy day drainage.
(5) anti-rainstorm measures: after receiving the rainstorm forecast, promptly cover the construction materials and materials, machinery and equipment, electrical equipment, etc., in order to ensure that they are not drenched and soaked by rain. When the rainstorm occurs, immediately stop all concrete construction, lifting operations, welding operations and other dangerous construction operations; construction vehicles suspended; cut off high-voltage power supply, shut down the site power generation, electricity equipment.
(6) rainy season lightning protection measures: the field area power station, power house and other mechanical equipment in the lightning strike area are installed lightning protection facilities to prevent lightning damage to equipment, injury to personnel. Lightning protection facilities should meet the requirements of relevant regulations and be inspected regularly. When lightning appears, immediately stop the field electrical equipment operation, welding operations and other dangerous construction work.
Second, the typhoon construction emergency plan
1, be prepared
typhoon season at any time to be ready to prevent typhoon attacks. Set up a person to pay attention to the weather forecast, make a record, and keep in touch with the city weather station, in case of weather changes in a timely report, in order to start emergency measures in a timely manner.
2, the establishment of the typhoon team
The establishment of the typhoon rescue and relief team, personnel and division of labor in principle with the leading group of typhoon storm prevention, and equipped with about 20 people of the rescue team, all members pay close attention to the scene of the dynamics of emergencies, immediately put into the scene of salvage, so that the loss of the minimization of losses.
3, reasonable arrangements for construction during the typhoon
scientific, reasonable arrangements for construction during the typhoon, when the wind is greater than 6, stop the outdoor construction operations, advance arrangements for the rainy period of construction of the various sub-projects, so as to be prepared.
4, temporary facilities typhoon measures
The construction site offices, canteens, warehouses and other pro-establishment projects should be a comprehensive and detailed inspection, such as tie not secure, poor drainage, leakage, subsidence, deformation and other cases, immediately take measures to strengthen the treatment, the problem is serious suspension of use. After the typhoon, the organization is ready to check, found problems, focus on repair.
5, the construction site typhoon measures
Before the arrival of the typhoon, the towering independent machinery, scaffolding, and unloaded steel, templates, etc. with cables, rebar, wire, etc., temporary reinforcement, stacked on the floor, the roof of the small machinery and equipment, sporadic materials stacked and reinforced, and can not be fixed all the things to be moved to the building.
6, hoisting machinery typhoon measures
Hoisting machinery to stop working before the typhoon, tower crane hook, and will turn the brake release, so that it is in a free rotary state; working at height in a timely manner withdrawn to the safety zone.
7, after the typhoon in time to deal with measures
Immediately after the typhoon, the organization of personnel sub-specialty, sub-parts of the template, steel, especially scaffolding, power lines for careful inspection, found that the problem is dealt with in a timely manner, by the person in charge of the site agreed to report to the A party, supervision of the site engineers to approve the resumption of work.
;