Explanation: In the morning reporter in Liangcun highway to see, workers are cleaning the road surface. Liangcun highway pavement lowering project is 970 meters long and 32.5 meters wide. Construction workers said the project is located at the entrance of a large residential area, and there are several construction sites nearby at the same time, increasing the difficulty of construction.
Concurrently: Liang village highway pavement lowering engineering engineer Cao Weidong: 2010 rainy weather, the main difficulty in the coordination, because it involves a lot of departments, the local villagers, the owners of BGG, the owner of the pipeline, and the railroad construction department, as well as the coordination of the traffic of the passing vehicles.
Explanation: When the road is under construction, residents in the vicinity of Liangcun who want to go in the direction of Golden Village will have to go through Donghe Bridge, then take Qiming Road and cross Goose Hill Bridge to get there. (I will draw a map). After many efforts, the Liangcun highway was finally restored to traffic in time for the Chinese New Year.
Concurrently: Citizen 1: The road is beautiful again, and the transportation is much more convenient, straight through.
Concurrently: (on the car)
Reporters on the spot: this road is not repaired before, the public if you want to go from here to the eastern suburbs need to spend nearly half an hour, we now come to experience, the new road after the opening of how much time can actually be saved.
Explanation: It is understood that the Liangcun Highway lowering section of the road is designed according to the standard of the city's first-class trunk road, and today there are a lot of vehicles have grabbed the first test drive.
Concurrently: (get off)
Reporters on the scene: just when we got on the car is 9:45, but now just 9:50, only took 5 minutes to come from the Cinnamon Garden to this golden village.
Explanation: The residents of the Golden Village told the reporter that they also look forward to the Liangcun Highway resumed traffic every day to ease the traffic pressure on the goose pit bridge section.
Concurrently: the gold village villagers: as if we are in and out of the convenient, before the old have to drive a big turn, gas money, time are wasted.
Explanation: After the opening of Liangcun Highway, the city's transportation and tourism development is of great significance.
Concurrently: Liangcun Highway pavement lowering project engineer Cao Weidong: on the upper Nanxiong, Milk Source, Renhua this piece, mainly Nanxiong, Danxia Mountain, and on the main road in Jiangxi is a national highway to come, so the re-opening of this road, the Spring Festival of this year and the tourism to bring benefits.
Explanation: When there is a lot of rain, the entrance to Bijieyuan is prone to flooding. Now Liangcun Highway drops the road surface up to 10 meters deep, in order to avoid future flooding, has been done in advance drainage facilities.
Concurrently: Municipal Construction Engineering Management Office deputy director Yao Wendong: In the lowest part of this road, we added three 2-meter drainpipes, for the future drainage renovation to be ready, there is no need to excavate the road surface again.
peiyin.com/newsInfo_646_1_4.shtml TV News Voiceover Commentary Script: Liangcun Highway Officially Opened to Traffic
.