Emergency plan for construction site typhoon safety

Emergency plan for site typhoon safety (Selected 5)

In ordinary learning, work, life, sometimes there are some events that are not expected, in order to reduce the consequences of the accident, it is necessary to carry out careful preparation of the emergency plan in advance. So what is an excellent emergency plan? The following is my carefully organized emergency plan for site typhoon safety (selected 5), welcome to share.

Emergency plan for site safety against typhoon 1

The typhoon is increasingly harmful to the construction site, in order to prevent the typhoon on the construction site and the emergence of hazards to reduce losses and accidents after the expansion of the development of this plan.

〈A〉Measures to prevent the occurrence of typhoon accidents:

1, after receiving the information that there is a typhoon, you should immediately notify the construction site of the project department and the construction team, so that to the construction site of every employee knows when there is a typhoon to come. And make all the preparations.

2, the project department immediately organize personnel on the site of the row of fences, cranes, steel derricks, construction elevators, temporary facilities, such as checking, such as found that the problem should immediately take effective measures to rectify (such as row of fences on the attachment is not firm, transport bridge on the bridge is not tied up, transport bridge on the material debris is not clean, the safety net is not hung, the pro-roofing is not reinforced, etc.).

3, the workers dormitory in the wind, and not solid should immediately evacuate the workers from the dormitory, moved to a safer place to avoid the wind.

4, the dormitory in the large trees and high-voltage lines by the workers should be evacuated to the shelter.

5. During the typhoon, all outdoor operations are strictly prohibited and workers are asked not to go out as much as possible. Prevent object strikes that occur due to the typhoon.

6, lock the electrical box of the site, and evacuate the open machinery and equipment to the indoor.

7, the site of all the loose materials to the pile nailed, hung, pulled, to ensure that everything is safe.

〈二〉Typhoon accident emergency plan:

1, such as the occurrence of a typhoon accident in the workers' dormitory, should immediately notify the higher authorities and immediately evacuate the dormitory workers to the temporary shelter. And arrange the life of the workers.

2, timely rescue of injured people, rescue personnel must wear the necessary.... Protective equipment (such as helmets, gloves, raincoats, glasses, etc.).

3, disconnect the power supply of the accident site, protect the workers' property from being stolen.

4. Protect the accident site and wait for investigation.

A guiding ideology:

The work of typhoon and rainstorm prevention is an important work related to the safety of the lives of teachers and students and the safety of national property, in order to effectively safeguard the safety of teachers and students and the safety of property, to enhance the kindergarten's ability to deal with the flood control and prevention of the typhoon, in line with the principle of "prevention first, safety first," this plan is hereby formulated. The plan is hereby formulated.

Second, preventive steps:

Leadership group list and contact number

Leader:

Group:

Members:

Kindergarten to start the Taiwan flood control plan, the implementation of the 24-hour leadership, on duty.

Third, emergency measures:

1, to strengthen information communication, to do the top of the situation, the bottom of the report.

In the event of a major flood, all the leaders into place, the flood control work leading group began to operate; the leaders in charge of the flood control work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.

2, prevention-oriented:

(1) clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.

(2) Close doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.

(3) The janitor of the school's sewers and main catchment wells to carry out a comprehensive dredging.

(4) The school building houses on the gutter, downpipes dredging, the whole school tree pruning and reinforcement.

(5) Do a comprehensive safety check of the lightning facilities and outdoor wiring of all school buildings.

(6) Do a comprehensive safety check of outdoor antennas, air conditioning outdoor units, and external hangings.

(7) Each department's indoor power supply, sockets, doors and windows to do a comprehensive inspection.

(8) Due to the interruption of circuits and wires caused by the typhoon, the power switch should be turned off in a timely manner, and emergency lights, torches or candles should be activated for lighting.

Fourth, safeguard measures:

After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.

At any time with the higher departments and units to maintain close contact, strengthen the information communication, to do the upper situation, the lower situation reported.

1, General

1.1 Preparation of the purpose

In order to effectively do a good job of defending the super typhoon, timely disposal of the super typhoon brought about by the sudden disaster, to minimize casualties and property damage, to the fastest possible speed of restoration of production and life, and to protect the sustainable and healthy development of the economy and society, it is formulated. Economic and social sustained and healthy development, the development of this plan.

1.2 Preparation of the basis

The main basis for the preparation of this plan is the "People's Republic of China Water Law", "People's Republic of China Flood Control Law", "Zhejiang Provincial Flood Control, Typhoon and Drought Relief Regulations," laws and regulations, and the "National Flood Control and Drought Relief Emergency Response Plan," "Flood Control, Drought Relief, Emergency Response Plan," "Wenling City, the overall emergency response to public emergencies * * * and the provisions of the "Zhejiang Province strategy for defending against super typhoons. Zhejiang Province, the defense of super typhoon strategy research report.

1.3 Scope of application

This plan applies to the city within the scope of the super typhoon disaster and all kinds of secondary, derivative disaster defense and emergency response.

1.4 Working Principles

The defense of super typhoon disasters to implement the executive head of the system of responsibility and hierarchical sub-departmental job responsibility and accountability system. Adhere to the "people-oriented, prevention-oriented, unified command, hierarchical responsibility, rapid response, departmental linkage, implemented in accordance with the law, scientific scheduling, based on grass-roots, group prevention and control". Working principles.

1.5 work focus

The defense of super typhoon highlights people-oriented, focusing on the safe transfer of personnel, prevention and avoidance of the main, all mobilized, unified command, if necessary, according to the law can be forced to transfer and resettlement. The main content is:

1.5.1 the existence of safety hazards of reservoirs (ponds) downstream of the residents;

1.5.2 landslides, mudslides, collapses and other flash floods and geological hazards of the affected areas of the affected people;

1.5.3 three, four types of hazardous (old) housing households, coastal directly facing the wind of the two types of housing households, coastal operations (offshore aquaculture, shipbuilding enterprises, construction enterprises, etc.), people who are vulnerable to gale force winds, structures, high-altitude facilities and construction projects under construction near the people, temporary housing and low-lying areas and other dangerous areas of residence;

1.5.4 may be at risk of the first line of sea ponds (culverts and gates) of the people living;

1.5.5 all types of ships back to port to avoid the wind;

1.5.6 factories, stores, churches, Temples, schools stranded people, driving vehicles on the road, streets and roads, pedestrians, tourists, outsiders;

1.5.7 hydrological, meteorological survey personnel, rescue commandos, rescue personnel, medical personnel, the news media and typhoon prevention staff of their own safety.

2, the organization and command system

2.1 Municipal Flood and Drought Control Command

The defense of super typhoon, in the higher level of the flood and drought control command institutions and the municipal party committee and municipal government under the leadership of the Municipal Flood and Drought Control Command, the municipal flood and drought control command unified command, deployment and implementation of the "prevention, avoidance, rescue, save "Work.

Municipal Flood and Drought Control Command command by the municipal government in charge of the deputy mayor as deputy director of the Municipal Water Conservancy Bureau, the municipal government office in charge of the deputy director of the Municipal Water Conservancy Bureau in charge of the deputy director of the Municipal Water Conservancy Bureau.

Municipal Flood and Drought Control Command members of the Municipal People's Armed Forces, Reserve Battalion, Municipal Propaganda Department, Municipal Supervision Bureau, Municipal Public Security Bureau, Municipal Water Conservancy Bureau, Municipal Meteorological Bureau, Municipal Bureau of Ocean and Fisheries, Municipal Bureau of Land Resources, Municipal Bureau of Construction and Planning, Municipal Bureau of Transportation, Municipal Bureau of Education, Municipal Bureau of Civil Affairs, Municipal Bureau of Tourism, Municipal Bureau of Work Safety Supervision and Administration, Municipal Bureau of Development and Reform, Municipal Bureau of Finance, Municipal Bureau of Industrial Economy, Municipal Agriculture and Forestry Bureau, Municipal Health Bureau, Municipal Construction Bureau, Municipal Power Supply Bureau, Municipal Trade and Grain Bureau, Municipal Human Defense Office, Wenling Marine Department, People's Republic of China Property Insurance Company Limited Wenling Branch, Zhejiang Telecom Company Limited Wenling Branch, China Unicom Company Limited Wenling Branch, Zhejiang Mobile Company Limited Wenling Branch, and other departments and units responsible for the composition.

2.2 Office

City flood control and drought control headquarters set up emergency response office and daily office. Emergency response office by the expert group, rescue and relief group, disaster verification group, publicity and reporting group, logistics group, flood and drought control scheduling group, information synthesis group of seven institutions, respectively, led by the relevant functional departments. Daily office (hereinafter referred to as the city three defense office) is responsible for the daily work of Taiwan defense.

2.3 towns (streets) and other flood and drought control command institutions

The towns (streets) to set up flood and drought control headquarters and daily offices, the implementation of office space and equipped with 2 to 3 full-time staff. Each department should be clear flood control responsible person (AB post) and flood control contacts. Urban communities, villages (neighborhoods) and other grass-roots organizations, as well as enterprises and institutions, water project management units, key project construction units

To set up flood and drought control offices, clear full-time staff and responsibilities, in accordance with the city's Flood Control and Drought Control Command directives and plans to do a good job of typhoon prevention.

3, super typhoon defense standard grading

Super typhoon defense standard from low to high is divided into Ⅳ, Ⅲ, Ⅱ, Ⅰ four levels.

3.1 General (Level Ⅳ)

The meteorological department forecasts that the super typhoon is developing and is expected to affect the city.

3.2 Large (Ⅲ level)

The meteorological department forecast super typhoon rubbing our city waters northward, or in the coastal areas along the central Fujian to northern Zhejiang landfall, within 48 hours to affect the city.

3.3 Major (II)

The meteorological department forecasts that the super typhoon will land in the coastal areas along the north of Fujian and north of Zhejiang, and will seriously affect the city within 24 hours.

3.4 Especially Significant (Ⅰ) Level

The meteorological department forecasts that the super typhoon will make landfall in the coastal area around Wenzhou to Xiangshan, and hit the city head-on within 12 hours.

4, prevention and early warning mechanism

4.1 Typhoon and secondary disaster monitoring

Meteorological, marine and fisheries, water conservancy, land resources and other departments responsible for typhoons, rainstorms, storm surges, and flash floods and geological hazards monitoring, forecasting, early warning system construction, timely and accurately provide typhoons to the towns, the city's prevention of the finger member units, Rainfall, water level, storm surge real-time information and forecast forecast results and geologic disaster monitoring information.

4.2 water conservancy project inspection

Reservoirs, ponds, rivers, ponds, culverts and other water conservancy project management units should be clear management of the person responsible for the establishment of a daily inspection system and safety monitoring and supervision system.

4.3 Prevention and Early Warning

4.3.1 Municipal meteorological, hydrological and other departments should strengthen the monitoring of water and rain, relying on telecommunications, mobile, Unicom, farmers mailboxes and other information platforms in a timely manner to the city units, towns (streets), communities (villages, neighborhoods), early warning of the responsibility and reservoirs, ponds, sea ponds, culverts, and responsible for the management of the person responsible for the issuance of early warning.

4.3.2 prone to flash floods and mudslides, landslides and other disasters in the area of the town (street) and community, village, enterprises and institutions, schools should determine the early warning officer, the implementation of early warning responsibilities. Municipal Land and Resources Bureau to take the lead in conjunction with the relevant units to establish professional monitoring and group prevention and group testing combined early warning responsibility system, the implementation of observation measures, flood season, adhere to the daily inspections. During the rainfall period, strengthen the observation and inspection, once found signs of danger, immediately issued an alert to the potentially affected areas, to take temporary emergency measures, inform the masses to move. And timely report to the city flood control and drought control headquarters.

4.3.3 Marine and Fisheries, Transportation (Port and Maritime), maritime and other relevant departments and coastal towns (streets) should be on the work of fishing boats to avoid the wind of a comprehensive analysis of the power of the fishing boat, tonnage, mooring location, port conditions and other factors, combined with the typhoon's wind and wind direction, to determine the gradient of the specific criteria for the scientific transfer of fishing boats and fishermen to determine the specific criteria for the gradient of scientific transfer of the development of practical `fishing boats and fishermen to avoid the wind of the transfer of the program. Strengthen the safety management of foreign vessels taking shelter from typhoons, and implement resettlement sites for people leaving the vessels. Prepare plans for the construction of wind shelter harbors, build them according to the standards stipulated by the state and the province, improve the mooring facilities for ships, do routine maintenance, and enhance the ability to defend against storm surges. Evaluate the windproof capacity of the constructed wind shelter harbors, determine the safe capacity according to the evaluation results, and take corresponding safety measures. Timely collect communication data of various wind shelter vessels, register them, and send timely information on typhoon prevention to the crews through communication groups and fishery broadcasts according to the typhoon level dynamics. According to the instructions of the municipal defense directive issued in a timely manner on board the evacuation order.

4.3.4 The health sector to organize the implementation of the appropriate number of rescue teams, equipped with a variety of medical equipment, medicines, clear contact person, as soon as possible to arrive at the designated location, set up a temporary rescue point, once there are injuries to be able to carry out timely rescue and treatment, so as to reduce casualties.

4.3.5 The towns (streets) to clarify the number of people in the eight categories of dangerous houses, sheds, lowlands, farms, non-standard ponds outside the ponds, dangerous construction sites, the number of people to move, the transfer route, the person responsible for contacting the resettlement site, and according to the results of the housing census, under the guidance of the relevant departments of the construction, land, construction, civil affairs, human security, and other relevant departments in the communities (villages, neighborhoods) to choose the right amount of relatively safe housing As a centralized shelter for the masses, establish a file, improve the personnel transfer plan and strengthen the implementation of the work to ensure the safety of disaster avoidance targets. To combine the current new community, new rural construction, construction of high-standard, high-quality centralized resettlement houses for disaster avoidance personnel.

4.4 Anti-Typhoon Inspection

Anti-Typhoon Inspection is carried out at a hierarchical level, divided into units of self-inspection, town (street) and departmental inspections and supervisory inspections. The main content of the inspection is the implementation of the responsibility system for typhoon prevention, the establishment of the system, the plan and response measures to improve the transfer of personnel, electromechanical and facilities in working condition, material reserves and other key points. Regular inspections are carried out before the annual flood, with emphasis on inspections before the typhoon, and the results are reported at each level.

4.4.1 Municipal Flood Control and Drought Control Command regularly and irregularly organize the relevant departments and units to carry out typhoon inspections, found that there are typhoon safety problems, and instructed the relevant units to deal with and rectify the situation within a certain period of time.

4.4.2 Departments in accordance with their respective responsibilities to focus on strengthening the construction projects under construction, ships, typhoon shelters, geological hazards.

Emergency plan for site safety against typhoons 4

In order to do a good job of my site's typhoon prevention work, reduce disaster losses, to protect the safety of people and property, according to the "People's Republic of China *** and the State Safety Production Law" and the District Construction Bureau of the relevant documents, combined with the actuality of our company, the development of the project department of the emergency response to deal with the work of the plan.

First, the basic principles of emergency response

(a) This plan for my construction site suffered a typhoon attack or the impact of emergency response work of the basic procedures and principles of organization.

(b) in the implementation of emergency response work in the implementation of unified command, each responsible for their own, prevention-oriented, rescue first, rapid response, to ensure safety principles.

Second, the organization and competent duties

The project set up a leading group of construction site typhoon prevention work

Leader: project manager Zhu Jiahua

Deputy leader: deputy project manager Dai Jinquan, the technical responsible person Zhou Fengping

Members: the project safety office Zhang Hua, quality and safety officers Cai Baobin, construction worker Zhang Jianhu and other relevant personnel.

Main responsibilities:

(a) responsible for the construction project typhoon emergency response plan development and modification;

(b) before the typhoon, is responsible for notifying the site to do a good job to prevent the typhoon, checking the site safety facilities reinforcement, evacuation, transfer of operating personnel;

(c) arranging for personnel on duty, inspecting the construction site, and immediately organizing rescue Rescue and aftercare work, and maintain close contact with the higher authorities, at any time to report the emergency treatment of the accident scene;

(d) the end of the typhoon, is responsible for convening the relevant personnel to summarize the emergency treatment of the accident.

Third, the implementation of the plan

(a) received the news released by the meteorological station, it is expected that there is a possibility of being affected by the typhoon:

1, the project manager of the construction site issued a notice of typhoon prevention, the relevant personnel of the Ministry of attention to listening to meteorological news, pay close attention to the typhoon movements;

2, the project manager is responsible for notifying the The site of the relevant personnel and teams, requiring all personnel to work closely together to do a good job in the preparation of typhoon prevention.

(b) When the typhoon is approaching our city and will affect our region within 48 hours, and the weather station issues a typhoon warning:

1, the project department should reasonably arrange the construction, and stop the operation of the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, the inspection includes whether the construction lift is firm, whether the scaffolding and other facilities are stable, whether the temporary work shed is safe, etc., and take measures to prevent the typhoon. Temporary scaffolding is safe, etc., and take measures to reinforce and eliminate potential safety hazards.

(C) when the typhoon may hit our region within 24 hours, the weather station issued an emergency warning:

1, the project department typhoon prevention work leading group personnel in place, arrange for personnel on duty;

2, the site to stop the construction of construction, construction workers withdrawn to the safety zone;

3, the project manager organizes a tour of the site with the leading group of the company Further check the implementation of the various defense measures, the implementation of the site rescue team in place, and in a state of readiness;

4, during the typhoon, the occurrence of construction site casualties, according to the company's "construction engineering major safety accident emergency rescue plan" implementation.

Fourth, after the typhoon

Weather stations issued typhoon warnings lifted, the project department should check the damage and report to the branch and the head office, for the site safety facilities should be reinforced in a timely manner, and summarize the work of typhoon prevention.

Site Typhoon Safety Emergency Plan 5

I. Purpose:

The establishment of flood control, typhoon emergency response plan, through the training of the emergency response team training and hands-on training, to strengthen the ability to manage the service area of the flood control and emergency response, in the event of a more effective and timely elimination of the risk of damage will be reduced to a minimum to ensure that the flood control, typhoon emergency work without fail, to ensure that the flood control and emergency response work without fail. The company's management team has been working hard to ensure the safety of its products and services, and has been working hard to ensure the safety of its products and services.

Second, responsibilities:

Management Director for flood prevention, typhoon rescue commander-in-chief;

Management Director for the deputy commander-in-chief, is responsible for the overall work of the equipment group;

Safety host for the deputy commander-in-chief, is responsible for the overall work of the rescue group;

Environment host for the deputy commander-in-chief, is responsible for the overall work of the logistics group;

The environment host for the deputy commander-in-chief, is responsible for Logistics group of the overall work;

control center is responsible for the accurate communication of information, coordination;

management office of all off-duty staff for flood prevention, typhoon rescue emergency response team members.

Third, the division of group responsibilities:

3.1 rescue group: by the safety host and not on duty all the safety members of the group

3.1.1 to take all the measures to deal with the danger;

3.1.2 responsible for flood sandbags filling, handling and stacking;

3.1.3 Utilizing various ways and means to remove dangerous situations in time. p> 3.1.4.4 safety organizer to lead the rescue team to take all other effective methods to do all kinds of rescue work.

3.2 equipment group: by the management office supervisor and management office of two technicians

3.2.1 is responsible for all kinds of pumps and power supply equipment on;

3.2.2 on the scene of the rescue technical guidance;

3.2.3 on-site equipment for emergency repair.

3.3 Logistics group: composed of environmental organizers, housekeepers, lifeguards, front desk attendants, cashiers, clubhouse attendants

3.3.1 Guaranteeing the normal supply of all kinds of relief materials;

3.3.2 Responsible for on-site rescue of the injured;

3.3.3 Actively assisting the work of other groups;

3.3.4 Personnel division of labor

3.3.4.1 not on duty two five post is responsible for logistical material security;

3.3.4.2 front desk attendant, cashier, clubhouse attendant is responsible for evacuating the crowd and rescue the injured, transfer the injured to a safe location and timely report to the municipal emergency services center;

3.3.4.3 lifeguards and home helpers are responsible for the rescue of property.

3.4 On-duty personnel

4.1.1 The on-duty personnel shall promptly notify the center and the shift supervisor on duty after discovering the dangerous situation;

4.1.2 The duty officer of the center shall take measures such as emergency assembly after receiving the information and convene the personnel who are not on duty to dislodge the dangerous situation in time;

4.1.3 The duty officer of the center shall notify the manager of the Management Office and the supervisor of the Management Office and the

4.1.4 The center watchman should inform the positions on duty;

4.1.5 The positions on site should do a good job of order maintenance and personnel and vehicle diversion;

4.1.6 The center watchman should pay close attention to the situation on the scene, and if necessary, seek other support.

4.1.7 Before the arrival of the typhoon, the management office positions need to carefully check the post range of potential safety hazards, and timely elimination of dangerous situations, the situation is serious and timely report to the superiors.

Note: All members must obey orders, follow the command; all members of the rescue process need to pay attention to their own safety.

;