In order to standardize the discharge of production and domestic wastewater from enterprises and charge reasonable treatment fees, the following agreements were signed on relevant matters after negotiation between the two parties:
1. Discharge specifications
1 , All wastewater in the production area, such as production wastewater, flushing water, boiler wastewater, circulating water, etc., is fully enclosed in the production area, and all domestic sewage in the living area enters the collection pool of Party B, and reaches the specified sewage treatment plant interface after pretreatment After meeting the standards, Party B will discharge it into Party A's sewage pipe network and enter the sewage treatment plant for treatment.
2. Ground water in living areas and idle plots can enter Party A’s rainwater pipe network.
3. Party B shall discharge according to the discharge time required by Party A. Party B shall build a collection pool within the enterprise that can store production wastewater for two days to adapt to emergency storage under special circumstances.
2. Pipe network layout
1. All sewage from the production workshop must enter the collection pool for unified pretreatment, and prevent the sewage pipes from the workshop from being directly connected with the pipes discharged into Party A’s sewage pipe network. join.
2. A check valve must be installed at the interface where Party B discharges into Party A’s sewage pipe network to prevent backflow; a stop valve must be installed to facilitate maintenance and control under special circumstances; and a water intake valve must be installed to facilitate sampling at any time.
3. Fee collection
In - year, all wastewater of Party B will be pre-treated by Party B to reach the interface standard. After Party A’s acceptance, Party B will discharge it into Party A’s sewage pipe network. Party A's sewage treatment plant meets discharge standards. Party B pays Party A a sewage treatment fee of RMB 10,000.
4. Other matters
1. Party B should take the initiative to pay the treatment fee to Party A, otherwise Party A has the right to control Party B’s pollution discharge. The processing fee is paid in advance on a quarterly basis, that is, RMB 10,000 is paid within three working days after signing the contract, and the balance is paid in one lump sum before March 2008.
2. If Party B fails to comply with the above discharge requirements and discharges water into Party A's rainwater pipe network, Party A is found to have charged Party B an additional 20,000 yuan for sewage treatment and water and electricity charges.
3. This contract applies to Party B’s existing production scale. If the production capacity is increased, the fee collection method will be negotiated separately.
5. This contract is made in two original copies, with Party A and Party B each holding one copy; and there are two copies, with Party B’s head office and Party A’s sewage treatment plant each holding one copy. This contract will come into effect upon signing.
Representative of Party A
Representative of Party B