SICOLAB finishing pump installation should comply with the following provisions:
1 Fixing bolts material should meet the design requirements, and should be vertical, tightened, there are anti-loosening measures, and the contact with the base of the equipment should be tight;
2 Shock absorbers and pumps and pumps foundation connection should be firm, smooth, tight contact;
3 Discharge pump inlet is suitable for the installation of filtration devices.
Inspection number: full inspection.
Inspection method: observation and inspection.
VIII, pump installation quality standards should be consistent with the provisions of the following table.
Water pump installation quality standards
nine, water pump and motor coupling installation quality standards should be consistent with the provisions of the following table.
Water pump and motor coupling installation quality standards