How to debug Covisint ultrasonic machine

Hello!

Ming Yang ultrasonic small for you to answer:

1. Tuning before the preparation:

First open the ultrasonic work of the air pressure source to ensure that the mechanical air pressure gauge is being able to operate normally index.

2 the original equipment mold unloading:

Use of ultrasonic wrenches on the machinery of the original welding mold unloading, loaded with ultrasonic molds need to weld the product clockwise for the loose, remember to be tightened.

3 start to check the equipment:

Turn on the ultrasonic equipment power supply, turn on the start button, wait 3-5 seconds, that is, turn off the power. Then press and hold the controller on the sonic detection button, hear the machinery to emit ultrasound should be crisp, no hoarse and excess noise, if the sound of screaming or hoarse, you must check whether the mold is loose or broken, and take countermeasures to adjust.

4. Rack debugging:

Loosen the two fastening handles at the back of the rack, according to the product will be swung to the height of the mechanical head to adapt.

5 ready product mold debugging:

Shut off the air supply, air pressure controller to adjust the air pressure value to "zero", need to weld the product on the bottom of the mold, and ensure that the mold.

6 product mold debugging match:

Pull down the whole mold vibration cylinder, so that the upper mold close to the bottom mold, shaking the head lifter, so that the upper mold pressed to the product, and keep the product and the upper and lower mold must match.

7 equipment mold debugging:

Add the air pressure to 0.1MPA, selector switch dial to manual, press the two green start button in front of the machine, so that the mold is lowered and pressed to weld the product.

8 Rocking lift debugging:

According to the products to be welded plus or minus the rocking lift, so that the limit screws and the vibration cylinder to maintain a distance of 1MM.

9 Welding debugging ready for production:

Finally, tighten the frame fastening handle, fix the bottom mold, press the red emergency stop button to make the machine head rise, the selector switch is dialed to automatic, adjust the welding parameters of the product, and prepare for production.