Backstage of bidding management manual for project manager of Weinan construction unit

Complete all procedures of a construction project from project initiation to completion (including project initiation, planning, design, construction project application and completion acceptance).

Project approval

1 project application report (original)

2, ( 1)

Project proposal or project feasibility study report (1 copy)

Certificate of ownership of construction land or pre-trial opinions on land use for construction projects, project construction investment budget (I)/> capital certificate issued by bank credit department (original)

Business license of enterprise legal person (copy); (A copy of qualification certificate is required for real estate projects)

7. Topographic map of the project (1)

8. Opinions of relevant functional departments.

Second, planning and design.

According to the overall urban planning and project documents, the Municipal Planning Bureau issued the red survey and design, planning and design conditions.

Architectural design is divided into three stages, namely scheme design, preliminary design and construction drawing design.

3. The Urban Construction Bureau is responsible for contacting relevant municipal departments for preliminary design approval.

, building engineering construction.

(1) To apply for a construction project, you must first register the following information provided by the Construction Committee.

1, the project plan approved by the planning department or the competent department issuing the investment license for fixed assets;

2. Construction land planning permit and construction project planning permit issued by the planning administrative department;

3. State-owned Land Use Certificate issued by the land department;

4, in line with the construction drawing design documents of construction drawing design review qualified project design approval;

& gt5. Construction permit issued by the Civil Air Defense Bureau of the Civil Air Defense Office;

6, issued by the fire department of building fire design audit opinion;

7. Issue the Design Audit of Lightning Protection Facilities for the detection of lightning protection facilities; BR/>; 8 issued by the "seismic fortification audit office submitted";

Proof of construction funds;

10 Letter of Approval for Construction Project Category issued by the Department of Engineering Budget and Cost;

& gt 1 1 other materials required by laws and regulations.

(b) When the construction project is invited for public bidding, the following information shall be added for the convenience of handling the formalities.

1, the legal representative of the construction unit or the certificate of entrustment of the legal representative;

Application form for public bidding for construction;

Application form for public bidding of construction supervision.

(3) For construction projects, invitation to bid will add the following information in the bidding procedure.

1, certificate of the legal representative of the construction unit or certificate entrusted by the legal representative;

2, the construction project construction bidding invitation;

Supervision bidding approval form for engineering construction;

4. Issuing certificates from business departments and private sectors;

5. Business license of enterprise legal person;

Tender reasons for other applications.

(four) the construction project directly contracted, supplement the following information, and go through the bidding procedures.

1, the legal representative of the construction unit or the certificate of entrustment of the legal representative;

2. Arrange the construction unit and the construction unit;

3, the construction unit construction project supervision unit arrangement report;

4. Issuing certificates issued by private sector business departments;

5. Business license of enterprise legal person;

6. Approval Form for Direct Contract of Construction Project.

(five) apply to the quality supervision station for quality supervision of construction projects, and provide the following information to go through the formalities.

1, Planning Permit;

2. Construction bid-winning notice or construction contract and approval form;

3. The bid-winning notice of project supervision or project supervision system and contract approval form;

4,

5. Qualification certificate of supervision contract unit;

6. Review and approval of construction drawing design documents;

Application form for quality supervision of construction projects; Other laws and regulations.

(six) to apply for construction safety supervision, the safety supervision station shall provide the following information to go through the formalities.

1, information provided by the construction unit:

(1) construction safety supervision report;

(2) Construction bid-winning notice or construction contract approval form;

(3) The bid-winning notice of engineering supervision or the approval form of construction supervision contract;

(4) Engineering geological investigation report (conclusion part);

(5) Construction drawings (including plan, vertical and cross-sectional drawings of the basement);

(6) Project budget (total construction area, number of floors, total height cost);

2. The construction unit:

(1) Information provided by the civilized construction responsibility system for safe production;

(2) Management objectives of safe production and civilized construction;

(3) Construction organization design and special technical scheme;

(4) Safety production and civilized construction inspection system;

(5) Education system for safe production and civilized construction;

(6) The original and photocopy of the quality system certification certificate of the project manager, and the work certificates of security personnel and special operations personnel;

(7) Site facilities, safety signs and general layout; /(8) Purchase the certificate and license invoice of safety net and the original;

(9) Responsibility letter for construction safety production;

(10) Application Form for Construction Safety Supervision

(1 1) Other materials required by laws and regulations.

(g) To obtain the construction permit, in addition to the information provided in paragraph (a), the following information shall be added for the Project Construction Committee to handle the formalities.

1, bid-winning notice or construction contract and approval form;

2. Letter of acceptance, project supervision contract and project supervision contract;

Certificate of project manager of the construction unit (driver management manual for pile foundation engineering issued by the construction administrative department);

The use of "commercial concrete purchase and sale contract" or by the construction administrative department responsible for the approval of the site mixing approval;

Schedule of 5 games;

6. Safety management plan;

Construction project quality supervision book;

Building construction safety and certificate;

Application form for construction permit;

4, the completion of the construction project acceptance

(a) when the construction project is completed and accepted, the quality supervision station shall provide the following information for review, and the quality supervision station shall complete the review within 7 working days, and organize the acceptance unit to set up the quality supervision station to send personnel to supervise on the spot.

1, engineering design and contract have been completed;

2. Application form for project completion acceptance;

Engineering quality evaluation report;

4 survey and design documents quality inspection report;

5. Complete technical documents and construction management (including equipment data);

6. Test report on main building materials, building components and equipment used in the project;

7. Test report on important parts of foundation, foundation and main concrete structure;

8. The construction unit shall pay the project payment according to the contract;

9, the project quality warranty signed by the construction unit; /& gt; 10, quality inspection and function inspection data of municipal infrastructure;

1 1, the planning acceptance certificate issued by the planning department;

12, submitted acceptance or acceptance certificate issued by public security, fire protection, environmental protection, lightning protection, elevators and other departments;

13, all the problems ordered by the quality supervision station to be rectified;

14, the statement issued by the completed project cost station.

(two) before the completion of the construction project, the construction unit shall provide the safety evaluation issued by the construction project safety supervision station.

(3) Within 15 working days from the date of completion and acceptance of the construction project, the quality supervision station shall provide the following information for formalities.

1, project completion acceptance report;

2. Construction permit;

3. Completion acceptance record;

Project quality supervision report;

5,

Engineering quality evaluation report;

7. Construction safety evaluation;

Engineering quality warranty;

Complete the project completion acceptance application form before the end of September; Project book;

10 commercial housing provides the Residential Quality Guarantee and the Residential Instruction Manual;

1 1 Other information of laws and regulations.

(four) the construction project has completed the balance sheet audit, and the cost station provides the following information to go through the formalities.

1, actual settlement item, providing the following information:

(1) power of attorney of the construction unit and the construction unit;

(2) the project approval; & ltBR/(3) Letter of Acceptance of Construction Contract or Construction Approval Form;

(4) Construction contracts;

(5) Construction organization design;

(6) Drawing review records;

(7) Commencement Report and Acceptance Record of Concealed Works

(8);

(9) Construction progress;

(10) List of materials (tendons) for the converter and pump of this project;

(1 1) engineering design change;

(12) construction site visa information;

(13) as-built drawing.

2. Settle according to the fixed price (or total cost) agreed by both parties, and provide the following information:

(1) power of attorney of the construction unit and the construction unit;

(2) The original project contract;

(3) as-built drawings.