Decorating contract sample collection of six
With the passage of time, the binding effect of the contract is more and more can not be ignored, and the signing of the contract is a very necessary behavior. So the question arises, how exactly should the contract be drawn up? The following is my help to organize the decoration contract 6, I hope it will help you.
Decoration contract Part 1
Party A:
Party B:
Adhering to the principle of mutual benefit, the existing Party A on the automotive beauty department of the vehicle cleaning and beauty service projects and Party B to reach an exclusive cooperation *** knowledge, by the two sides of the friendly negotiations, signed this agreement, both parties *** with the same to comply with:
First, the cooperation projects
Party A is paid to return to the daily repair and maintenance of the vehicle car wash and car beauty project in the form of package contract to Party B construction, Party B strictly quality and quantity according to the agreement standards to complete the project construction operations.
Second, Party A's duties and obligations
1, Party A to provide a fixed dedicated car wash and beauty site, water and electricity costs and bear the beauty of the project's sales promotion work;
2, Party A to provide the existing car wash equipment, Party B in the expiration of the contract period or the termination of the two sides to return to the Party. Return should ensure that the equipment can be used normally and functional integrity. (For the current shortage of equipment purchased by Party A, ownership of Party A) 3, the project cost and settlement form:
Party A of all vehicle cleaning, Party B has two kinds of automobile cleaning standard mode A, Party B to provide conventional vehicle cleaning in accordance with the 12 yuan / vehicle settlement; sales of goods vehicles in accordance with the 12 yuan / vehicle cleaning; painting vehicle cleaning treatment of an additional fee of 3 yuan / vehicle; the company's business car provides Free cleaning.
B, car beauty value-added projects between the two sides according to the attached price list, Party A to bear the sales task and incentives, accounting for %; Party B to bear the cost of construction and auxiliary materials, accounting for %;
C, all the vehicles are issued by the Party A, "car wash" Party B can be constructed at the end of the month, with a valid car wash single (fine washing) to Party A to reconcile the settlement of accounts. The settlement will be made by the end of the month with the valid car wash bill (fine wash) to Party A. Other value-added automobile beauty projects are sold by both sides according to the items and prices listed in the Annex, if there is a change in the project and price by the two sides to negotiate and then determine.
4, Party A bear Party B stationed construction staff daily meals, Party B stationed staff must be in accordance with Party A's work and rest time and daily management of the terms of the operation, subject to Party A's administrative management and work arrangements;
5, the two sides of the cooperative project sales work is mainly by the Party A staff responsible for the Party B stationed staff to coordinate with the promotion of the project and marketing and project training by Party B is responsible for;
6, the two sides of the cooperative project sales work is mainly by the Party A staff responsible for Party B staff coordination and cooperation, the project promotions and sales and project training. Party B is responsible for;
6, in order to protect the service interests of Party B, Party A in the car sales giveaway project, the two sides will give priority to the agreement project into Party A car sales boutique gift packages, (each merchandise sales car in the package contains a minimum of more than one)
7, Party A to ensure that the brakes package, air ducts cleaning, paint care, interior cleaning, four-in-one package, used car preparation project by Party B Exclusive right to operate guaranteed;
Third, Party B's duties and obligations
1, Party B needs to ensure that the project construction-related personnel to meet the workload requirements, and at any time according to the workload requirements of the personnel of the supplement;
2, Party B needs to ensure the quality of the project construction, to ensure the safety of vehicles in and out of the Party B stationed personnel no Any person without formal authorization shall not move the vehicle without authorization; if it causes Party A to lose, Party B is responsible for compensation.
3, Party B staff shall not take away all the items in the car owner's car for any reason, once indeed, Party B must require the relevant associates to compensate for the loss, while Party A has the right to transfer the parties to the legal department to deal with;
4, Party B undertakes the construction of the project process of all the auxiliary materials required (such as: car wash liquid / car wash gloves / car towel / car wash sponge / tire wax, etc.). Tire wax, etc.).
5, the construction of the later image of the beauty site, functional area labeling and operating flow charts show the costs borne by Party B, the rectification of fixed facilities costs borne by Party A; 6, in the scope of work, Party B construction personnel must obey Party A unified management and dress according to Party A's requirements, collectively referred to as Party A's service personnel, and violators are punished according to the chapter; Party B's staff clothing is provided free of charge; Party B's personnel access must comply with Party A's door. Personnel in and out must comply with Party A's access control regulations;
7, Party B sent to Party A to work staff, is Party B's employees. The personal and property safety during the employee's commute to and from work is the responsibility of Party B. Party B is not responsible for all relationships and responsibilities caused by work-related injuries, injuries, illnesses, diseases, etc.; 8, Party B guarantees that the stationed personnel in accordance with the store's traffic flow, in order to ensure the quality of the work and the progress of the personnel at any time to supplement;
9, all the vehicles into the Party A is regarded as a Party A customer, Party B shall not be any form of private transactions or change of customers;
9, all vehicles into Party A is regarded as a Party A customer, Party B shall not be any form of private transactions and Customers to carry out private transactions or disguised transactions, Party B can cooperate with Party A personnel to promote the project, but Party B shall not perform since the settlement, such as customer demand must be through Party A personnel, settlement by Party A is responsible for.
10, during the cooperation period, Party B's construction personnel shall have a nationally recognized motor vehicle driving qualifications or Party B designated personnel, due to Party B's responsibility for any damage caused by Party A and the customer's vehicle, Party B is fully responsible for the maintenance costs of Party A in accordance with the internal cost price settlement.
11, in the agreement period, the beauty area of the site facilities and car wash equipment maintenance and maintenance by Party B is responsible for, and bear the corresponding maintenance costs, such as equipment failure can not work properly, Party B must be overhauled within 1 day to ensure that its good working condition.
12, during the contract period, Party B actively cooperate with Party A to make promotional policies; Party B from time to time to make a demonstration of construction, discount promotional activities, Party A can also actively cooperate.
Fourth, the two sides of the settlement:
Party B car wash payments with receipts receipts; other beauty project payments with VAT tickets to Party A receipts; before the 15th of each month before the settlement of the previous month's payments, Party A shall not be in arrears with the payment of money to the Party B.
Party B is the only party that has the right to receive the payment of car wash.
Fifth, the duration of cooperation:
1, in view of the two sides to the sustainability of the development of the guidelines for the benchmark, the two sides formulated the cycle of cooperation for two years a sign, from 20xx year month to 20xx year month.
2, when either party does not comply with the terms of the contract and serious breach of contract, the other party has the right to request the termination of the contract and claim compensation;
Six, other terms
1, A and B during the period of cooperation, the unified external known as the "automotive beauty department".
2, this agreement in duplicate, with the same legal effect, consultation on outstanding matters to be resolved. Party A's representative: Party B's representative:
Date: 20xx Month Date: 20xx Month
4S store car beauty project price list
Unit: yuan
Note: 1, the above prices for five-seat cars, commercial vehicles and SUVs appropriate additional 20%;
2, the product has a unified supply of procurement;
3, the sales department sales vehicles to ensure that the sales department;
Decoration Contract Part 2
Contract No.:
Consignor: Consignee: Yantai Huaxin Shanghai Volkswagen Automobile Sales & Service Co. Address: No. 188 Airport Road, Zhifu District, Yantai City, Postcode: 264004
Phone: Phone: 0535-6678888
ID Card No.: Customer Service Hotline: 0535-6679999
In view of the Party A has signed a "contract of automobile sales" (Contract No.:), A and B are now on the vehicle purchased by Party A on the decoration of the matters reached the following terms. Reach the following terms.
2. If Party A agrees to use non-Shanghai Volkswagen original accessories in the decoration project, any problems arising from non-Shanghai Volkswagen original accessories in the decorated vehicle shall be borne by Party A, and Party B shall not bear any responsibility.
3, in the case of the owner agrees, in the installation of non-Shanghai Volkswagen accessories need to change the original power line.
2. Party B charges the following fees according to the services it provides:
3. Other instructions: .
Fourth, this contract in two copies, A, B and each side of a copy. Signed or sealed by Party A, Party B's authorized representative signed and sealed after the entry into force. p> Zip: Zip:
Phone: Phone:
In view of the A and B have signed the "car decoration contract" A and B are now on the vehicle purchased by the A party decoration matters to reach the following terms:
A, A entrusted to the B party to assist in the following car decoration services and agreed to prepay the relevant fees:
1, decoration items: Dongfeng Yueda Kia car all systems Leather seat cover installation.
2, the upholstery project, if Party B in the installation process of the installation of the vehicle caused by the damage caused by Party B, Party B must complete the installation within the specified time.
3, Party A must pay Party B at the end of the month when the installation of the month.
Second, the service fee: Kia's full range of leather seat covers are 590 yuan per set, capital: five hundred and ninety-five dollars.
Third, this contract in duplicate, A and B each party to take one. Signed or sealed by Party A, Party B's authorized representative signed and sealed to take effect.
Party A (signature): Party B (signature):
Manager (signature): Authorized Representative (signature): Manager (signature):
Decoration Contract Part 3Party A:
Party B:
A and B follow the principle of equality, voluntariness and fairness, on the office decoration construction of Huaning Thermal Power Co. /p>
A project content
(a) Project name: office remodeling, decoration project.
(b) project location: Inner Mongolia Huoning Thermal Power Co.
(C) project content:
1, the first floor to increase the light steel keel paper-faced gypsum board wall, room scraping putty, demolition of the second floor combination of writing partition reinstalled to the first floor.
2, the second floor to block a doorway, remove a partition wall; the second floor of the original office outside the room from one to two, and scrape putty.
3, detailed practice see attached drawings and instructions.
(d) contracting method: package package materials, there are additions and deletions can be adjusted, no other changes other than the implementation of a package of adjustments.
Second, the contract cost: thirty thousand yuan (¥ 30000 yuan).
Third, the project payment
After the start of the project materials into the field, pay the project payment of 5000 yuan, the project acceptance to provide construction invoices and then pay 90% of the yuan, the remaining 10% as a warranty, one year after the payment of the whole.
Fourth, the construction period requirements
(a) Start date: November 4, 20xx
(b) Completion date: November 11, 20xx
Fifth, the quality of the project and acceptance:
(a), Party B must be in accordance with the design documents and the current national technical standards and specifications for the construction.
(b), Party B must be in accordance with the requirements of the site visas and changes in the drawings of quality and quantity to complete the project.
(c), according to the contract agreed by Party A to provide materials, equipment, Party A should notify Party B before the material into the field, the two sides *** with the acceptance for handover procedures.
(d), according to the contract agreed by Party B to provide materials, equipment, Party B should be in the material to the construction site before notifying Party A, the material is not qualified Party A has the right to notify Party B to replace the time delays caused by Party B shall be responsible.
(e), where the construction quality caused by Party B unqualified works, Party B should be in the time specified by Party A free rework to achieve the acceptance of the project quality standards, rework is still not up to the Party B bear responsibility.
(F), Party A is responsible for checking the quality and progress of the construction site works, and with the construction.
(vii), the acceptance of the project: by the appropriate departments to check, acceptance and issued by the amount of work approved single, as a basis for settlement.
Sixth, safety requirements:
Party B in strict accordance with the "safety regulations" for construction management, all construction personnel entering the site construction must be through safety education and training, exams only after passing the post, if the construction personnel operating in violation of the law, Party B bear the corresponding responsibility.
Party A: Party B:
Legal representative: Legal representative:
Entrusted agent: Entrusted agent:
Year month month
Decorating Contract 4xxx Decoration Industry Association
Entrusted party (Party A):
ID card number: Residence:
Residence: business license number :
Entrusted agent: Legal representative:
Identity card number: Fixed telephone number:
Mobile phone number:
xxx family room decoration project design contract
Design party (Party B):
Identity card number:
Residence:
Entrusted agent: Legal representative :
ID card number: fixed telephone number:
cell phone number:
Engineering Designer:
Article I Engineering Design Project Overview
1, Party A commissioned the design of the engineering project location: District (County) Road
District No. Block Room.
2, engineering design period: days, calculated from the next day after the deposit.
Building area: square meters, the use of area square meters.
Article 2 design project selection (option √, no option to play "×"):
1, decorative design: indoor hexahedron and water, strong electricity, weak electricity ( )
2, environmental art design: greening, courtyard, sculpture ( )
3, other design:
Article III Design Charges
1, the total price of the design fee: (capital) yuan, ¥ . Among them:
(1) decorative design fee (including water, strong electricity, weak electricity): according to the building area per square meter yuan, subtotal yuan.
(2) soft decorative design fee: $ per square meter of floor area, subtotal $ .
(3) environmental art design fee: according to the building area per square meter yuan, subtotal yuan.
(4) other design fees: according to the floor area per square meter yuan, subtotal yuan.
2, design deposit (capital) yuan. (The amount of the deposit shall not exceed twenty percent of the subject amount)
Article IV Design Document Standards and Depth:
1, A, B both sides agreed that the design document standards for the Nanjing Decoration Industry Standard njbz-a-05-1 "Architecture". Decoration design drawing uniform standard" and njbz-a-05-2 "building decoration design document preparation depth regulations".
2. Party A and Party B agree that the preliminary design plan shall contain the following drawings: (tick one of the options)
(1) Indoor floor plan ( )
(2) Ground plan (if the floor material of each room can be marked on the indoor floor plan, it can be omitted) ( )
(3) Indoor ceiling plan ( )
(4) Main The perspective drawing of the main space (Party A does not require . Can not provide, such as providing, the cost of A and B agreed separately) ( )
(5) the main elevation: (refers to the decorative effect of the background wall, containing fixed furniture wall elevation, etc.) ( )
(6) other drawings:
3, A and B agreed that a full set of design documents in addition to the preliminary design of the program contained in the design drawings, it should also contain the following drawings and materials: < / p>
(4) the main space of the perspective drawing (Party A does not require.) And materials:
(1) catalog of design drawings
(2) design and construction instructions
(3) the original room survey
(4) alteration of the design plan
(5) sectional and elevation diagrams
(6) part of the node detailing
(7) various types of electrical socket location distribution
(8) power control circuit diagrams
(9) the design of the building and the design of the building and the design of the building and the construction of the building. (8) Schematic diagram of power control line
(9) Schematic diagram of weak power control line
(10) Schematic diagram of cold and hot water pipe installation
(11) Decoration material list
(12) Other materials:
Article 5: Design Procedures and Payment Methods
1. p> 1, the first stage:
Party B shall go to the door for the project survey within days after receiving the design deposit. After the end of the survey, Party A shall pay Party B the second stage of the design fee within days (accounting for % of the total price of the design fee, RMB (capital) yuan). Deposit received against the second stage of the design fee.
2, the second stage:
Party B received the second stage of the design fee, should be completed within days of the preliminary design and expansion of the preliminary design program, and notify Party A.
Party A shall pay Party B the second stage of the design fee (% of the total design fee, in RMB (capital) yuan), the deposit received against the second stage.
Party A shall communicate with Party B within days after receiving Party B's notice. Both sides of the second stage of the design documents to obtain consensus, and sign to confirm, Party A shall pay Party B within days
3, the third stage:
design fee (accounting for % of the total price of the design fee, counting the RMB (capitals) yuan) Party B should be in the third stage of the third stage of the third stage of the third stage of the design fee within a few days after receipt of a full set of drawings and notify the Party A.
Party A should notify Party A within days after receipt of the third stage of the third stage of the design fee.
Party A should communicate with Party B within days after receiving Party B's notice. After both parties agree on the full set of design documents and sign to confirm, Party A shall pay the balance of the design fee within days, and Party B shall deliver to Party A a set of design drawings.
4, the fourth stage:
Party B should go to the site when the project starts to carry out drawings, and in the process of construction, according to the progress of the project, to the site to guide the construction of not less than times, in order to achieve the design effect.
Article VI Design Modification:
1. During the construction process, Party A requires changes in the design documents, Party B shall actively cooperate. Party B, according to Party A's request, to redesign the changed project, need to negotiate and sign a supplementary agreement, and pay the corresponding costs.
2, the revised design documents should include the following:
(1) design drawings
(2) project cost
(3) the main materials list
(4) other materials:
3, the revised design documents need to be signed by both parties to confirm.
Article VII Party A's responsibility:
1, Party A should communicate with Party B in a timely manner within the agreed period of time, and confirm the design program.
2, Party A on the design program confirmation, should be in the agreed time to pay the agreed fee in a timely manner.
3. Party A shall participate when Party B makes the submission of drawings. At the same time to arrange for the person in charge of the construction of the project to participate in, make a good record of the submission, and signed by both A and B to confirm.
Article VIII Party B responsibility:
1, Party B's design program shall not violate the provisions of relevant state laws, rules and regulations. The resulting loss of Party A, Party B is responsible for compensation.
2, Party B shall deliver the design documents to Party A according to the content of the contract, time and agreed standards, and complete the after-sales service.
3, Party B is responsible for monitoring the quality and design effect of the construction party's project based on the design documents confirmed by Party A. Within days after the completion of the project, Party B will deliver to Party A the as-built drawings of the following hidden projects:
① Power control line as-built drawings;
② Weak control line as-built drawings;
③ As-built drawings of the installation of hot and cold water pipes.
Article IX Liability for breach of contract:
1, Party A unilaterally proposed termination of the contract, Party B will not refund the deposit paid by Party A, the design fee received will not be refunded. Party B unilaterally proposed to terminate the contract, double the return of Party A has paid the deposit and design fees.
2, Party A to the design documents to confirm the extension, Party B design period extended, Party A more than days without confirmation, Party B has the right to terminate the contract, and to Party A to recover the design costs incurred.
3 Party A late payment of design costs, each late payment of one day, should be paid according to the total amount of design fees, liquidated damages, overdue payment of more than one day, Party B has the right to terminate the contract, and recover the design costs incurred from Party A.
4 Party B has the right to terminate the contract, and recover the design costs incurred.
4. If Party B delays the delivery of design documents, for every day of delay, the design fee shall be reduced by one percent of the total amount of design fee of the project.
5, due to Party B's design reasons, resulting in the project can not start in time or delayed, every day of delay, Party B to pay compensation of yuan.
6, Party B did not deliver the as-built drawings of the hidden items to Party A according to the time specified in the contract, for each day of delay, Party B shall pay compensation of yuan to Party A.
Party B shall pay compensation to Party A for each day of delay.
Article 10 Other
1, Party A entrusted Party B to undertake work outside the content of this contract, the two sides need to negotiate a separate contract.
2, Party A to change the time specified in the contract, require early delivery of the design documents, should be paid to Party B
daily yuan rush fee.
3, due to force majeure can not fulfill the contract, according to the impact of force majeure, partially or completely exempt from the responsibility of both parties, except as otherwise provided by law.
4, the contract in the fulfillment of disputes, A and B can not be resolved through consultation, you can apply to the Nanjing Decoration Industry Association to assist in mediation, mediation does not work, can be resolved in accordance with the following way:
① submitted to the Nanjing Arbitration Commission arbitration;
② lawsuit to the People's Court.
5, the parties may sign a supplementary agreement as an annex to the contract, the supplementary agreement and the contract has the same effect.
6, this contract in duplicate, A, B and each party to sign a copy.
7, this contract shall come into force after both parties sign and seal.
Signature of Party A: Signature of Party B (seal):
Entrusted agent: Legal representative:
Address: Entrusted agent:
Phone: Phone:
Decorating Contract Part 5Party A:
Party B:
Party A and Party B in the spirit of cooperation in good faith, equality and mutual benefit in order to cooperate in the development of decorative beauty service project,
Party A and Party B in order to cooperate in the development of decorative beauty service project,
Party A and Party B in order to develop the decorative beauty service project. In order to cooperate in the development of decorative beauty service projects,
Increase the content of the service Improve the after-sales production value, improve customer satisfaction, the two sides on the car beauty related matters for friendly consultation, reached the following agreement, and commitment to *** with the observance of the
I. Cooperation period
1. Party A entrusted Party B as the exclusive operating partner of the beauty program. The term of cooperation is () years
2. The operation period is from January to September
3. Management
1 Party A entrusts Party B with full responsibility for the operation of the decoration and beauty business.
2 Party A provides independent decoration and beauty construction workshop. Water. Electricity, Party B is responsible for the decoration and listing of products. Party A is responsible for the proper storage and safe use of equipment and materials. Due to improper storage and loss. Compensation by Party A.
3 Party A list of existing equipment. Confirmed by Party B to use. Ownership of Party A. When the contract is terminated, Party B will return the list of all equipment in good condition.
4 Additional equipment required for work by Party B is responsible for bearing the costs. Ownership of Party B.
5. Tools required to carry out the business of decoration and beauty. Raw materials. Consumables borne by Party B.
6. Party B in the construction process due to technical. Accidental losses caused by errors in the construction process are borne by Party B itself.
7. Decoration and beauty projects require raw materials purchasing rights to Party B, similar products Party B has priority.
Chinggong 4S store cooperation agreement
8 In order to promote the decoration and beauty of the rapid development of the first line of sales staff incentives borne by the party. Invoicing tax to customers
borne by Party A.
9. Party B is responsible for the management and payroll of the decoration and beauty department. In order to better improve the quality of service. Party B in the store staff accommodation and food by Party A to solve. Party B personnel must strictly implement. Obedience to Party A's relevant management system.
Three. Costing
Party A decorative beauty projects are all handed over to Party B to develop and operate. Party B purchasing equipment, tools, decoration costs invested need to get Party A's signature confirmation. Included in the total investment.
Four. Settlement mode
According to Party A's financial cycle. Monthly settlement of the sold and gifted products. No payment shall be owed to Party B for any reason.
V. Product sales and gifts
1. Party A can give away Party B's products in promotional activities, gift products in accordance with the purchase cost of products and construction of 200 yuan each time the standard cost.
2 Party A can only sell Party B's products to end users. Without the written permission of Party B. Party B products may not be resold to other users.
3 Party A is not allowed to install in Party B's beauty program board. Post other similar products trademarks. Logo.
4 Once the decoration of the beauty program site is completed. No alteration or removal of any kind is allowed.
6 Rights and Obligations of Party B
1 Party B undertakes to ensure the quality of its products. Do not substitute good for bad or provide counterfeit products.
2 Party B will provide Party A with comprehensive professional knowledge of beauty and business management training. Provide product and business information. From time to time to provide technical training and guidance to the party.
3 Party B to ensure that the price of the products provided is not higher than the market price. If the price adjustment should be notified one week in advance.
VII. Party A's Rights and Obligations
1. Party A can designate or suggest Party B to use the brand of the product,
2. Party A can implement supervision of Party B construction . The unqualified products or unqualified construction from the new construction
VIII. After-sales service
By Party B construction. Product failure caused by the after-sales service in the installation place to deal with. If you need to go out to deal with after-sales party A need to pay party B 200 / time. (Limited to Kunming city)
IX. Liability for breach of contract
A. If either party defaults on any of the terms of this agreement. The other party has the right to demand the other party to pay damages of 100000 yuan. The other party has the right to claim damages of 100,000 yuan and compensate you for all costs invested.
10. This contract is in duplicate. The two parties shall negotiate and sign a supplementary agreement to resolve any outstanding issues. Supplementary agreement has the same effect
Signature of Party A Signature of Party B Date Date Date
Decoration Contract Part 6Yantai Huaxin Shanghai Volkswagen Automobile Sales & Service Co. (hereinafter referred to as "Party A") (hereinafter referred to as "Party B")
Address: Address: No. 188, Airport Road, Zhifu District, Yantai City, China P.C.: P.C.: 264004
Tel: 0535- 6678888
Contract No. 6678888
ID card number:
Customer Service Hotline: 0535-6679999
In view of Party A has signed the "Automobile Sales Contract" (Contract No.:), Party A and Party B are now on the vehicle purchased by Party A to reach the following terms of decoration.
I. Party A entrusts Party B to assist in the following car decoration services and agrees to prepay the relevant fees:
Note: 1. The fees for the above entrusted items are based on the actual amount incurred, and will be settled by Party B with Party A on a real basis based on the vouchers of the invoicing unit.
2, decorative items, if Party A agreed to use non-Shanghai Volkswagen original accessories, decorative vehicles because of non-Shanghai Volkswagen original accessories and any problems arising from Party A, Party B does not bear any responsibility.
3, in the case of the owner agrees, in the installation of non-Shanghai Volkswagen accessories need to change the original power line.
2. Party B charges the following fees according to the services it provides:
3. Other notes: .
Fourth, this contract in two copies, A, B and the two sides of a copy. Signed or sealed by Party A, Party B authorized representative signed and sealed after the entry into force. Party A (signature): Party B (seal):
Manager (signature): authorized representative (signature):
Signing Date: Year Month Signing Date: Year Month