Which friend can provide the template of hydropower construction labor contract?
Party A: (Employer) Party B (Contractor) On the basis of equality, voluntariness and mutual trust, Party A and Party B have reached the following agreement on the hydropower project of Party A.. Article 1: Project overview 1. Project location: 2. Project contracting mode: Contractor A undertakes the project and materials; The contractor's contracted part of the project package; The contractor guarantees cleaning work. 3. Construction period _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Article 2: Agreement on material supply 1. The materials supplied by Party A in this project shall be qualified products that meet the requirements and delivered to the site on time. Party B shall go through the acceptance formalities. If there is any quality problem or specification difference, Party B shall submit it to Party A in writing in time, but Party A still refuses to use it, and Party A shall be responsible for the engineering losses caused thereby. After the materials supplied by Party A arrive at the site, they shall be kept by Party B after passing the acceptance, and Party B shall be responsible for compensation for the losses caused by improper storage. 2. The decorative materials supplied by Party A shall be used in this project, and shall not be used for other purposes without Party A's consent. If Party B violates this regulation, Party B shall pay Party A double the material fee. 3. If the materials provided by Party B do not meet the quality requirements or have different specifications, they shall be prohibited from being used. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials provided by Party B are fake and shoddy goods, Party A shall be compensated for double the price of the materials. Article 3: Agreement on Project Quality and Acceptance 1. This project strictly implements the national Code for Construction of Residential Decoration Engineering GB-200 1 and Code for Quality Acceptance of Building Decoration Engineering GB-200 1, and refers to other local standards and quality evaluation and acceptance standards. 2. If quality problems are caused by Party B's own reasons, such as poor technology and weak sense of responsibility, Party B shall bear the cost of rework. 3. Project completion: Party B shall notify Party A of the acceptance in advance and go through the acceptance procedures. 4. The construction scheme of this project is designed by Party _ _ _. Article 4: Site Management Agreement on Fire Prevention in Work Safety 1. Strictly abide by the stipulated decoration construction time, reduce construction noise and reduce environmental pollution. 2. Without the consent of Party A and the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction. 3. Ensure that the decoration site is clean and tidy, and do a good job of cleaning and handling before completion. 4. Party B shall cooperate with Party A to keep the construction materials and prohibit other personnel from entering the site. 5. Without Party A's permission, Party B shall not take any decoration materials provided by Party A out of the house. In case of theft, Party B shall pay double indemnity according to the material price. Article 5: 1 Project payment method, contract content and settlement agreement. After the slotting is completed, Party B shall be paid 50% of the project cost, 30% of the project cost after the completion of water and electricity, and 20% after the overall completion and acceptance. 2. The warranty period of this project is five years, and the project payment will be settled in full. Party A and Party B sign the project warranty, and the warranty period is calculated from the date of signing the completion acceptance. 3. Both parties shall issue payment receipts. 4. Project settlement method: _ _ _ _ meters for waterway and _ _ _ _ meters for circuit. Contract contents of Party B: 1, water and electricity slotting, wiring, threading and trench burying; 2, all the garbage in the process of hydropower construction site classification and bagging; 3, hydropower construction wall, drilling, cutting; 4, switch socket panel installation; 5. Hardware installation; 6. Installation of lamps and lanterns in the later period (crystal lamps are counted separately); 7. Other charging items shall be calculated separately. Article 6: In case of any dispute over the quality of the project, both parties shall settle it through consultation. If the parties are unwilling to negotiate or mediate, or if negotiation or mediation fails, they may bring a lawsuit to the people's court in accordance with the provisions of this contract. Article 7: Modification and dissolution of the contract 1. After this contract is signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. Before the signing of the contract, if one party wants to terminate the contract, it should put forward in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures. 2. In the process of construction, if either party promises to terminate the contract, it shall give a written notice to the other party, and both parties agree to go through liquidation procedures, conclude a termination agreement and terminate the contract. Article 8: Other agreements 1. If the construction period is delayed due to force majeure or unforeseeable factors such as weather and power failure, it can be postponed after confirmation by both parties. 2. Before entering the site, Party A may require Party B to go to the site for three times to cooperate with other types of work for cross-construction, and Party A shall pay labor costs to Party B for each time exceeding three times. 3. During the warranty period, Party B shall repair the quality problems caused by Party B's construction equipment free of charge and must arrive at the site within 48 hours after receiving the notice from Party A.. In case of problems caused by Party A's improper use or force majeure, quality objection of main materials and products purchased by Party A, or unforeseen reasons, Party A shall pay the maintenance fee to Party B according to the actual cost. Article 9: Supplementary Provisions 1. This contract shall come into effect after being signed (sealed) by both parties, and shall be terminated after the performance of the contract. 2. After this contract is signed, the project shall not be subcontracted. 3. This contract is made in duplicate, with each party holding one copy. 4. This contract is valid until _ _ _ _ _. The warranty period of this project is five years. After the warranty period, Party B shall pay Party A the corresponding maintenance expenses .. Party A's signature (seal) Party B's signature (seal) Party A's signature (seal) Party B's signature (to be present according to the installation requirements) 2. The project is installed twice, with 50% paid after the first acceptance and the rest paid in full after the second acceptance. 3. The total price of the installed hydropower project is RMB. Four. Quality requirements of the project: Party B must carry out the installation according to the requirements of national electrical standards, so that the lights are on and the water is connected. All contents in the process of water and electricity installation must meet the requirements and pass the acceptance. V. Construction safety requirements: Party B must carry out the construction according to the safety construction specifications and technical requirements, and take strict safety measures. Party B shall manage all installation tools with him, and pay special attention to safety during construction to prevent all accidents. Party B shall be responsible for the accident and all expenses incurred due to inadequate or ineffective safety measures. In case of such situation, Party A will not be responsible. Matters not covered in this agreement shall be settled by both parties through consultation. 7. This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signature by both parties. Party A: Party B: Date of Signing: The previous one: Model Purchase Contract for Resettlement Houses and the next one: Model renovation contract 7. This content helps me. Relevant suggestions. Download the model labor contract for wine industry. Download the Family renovation contract Template. Model school store contract. Model computer equipment purchase contract. Model steel formwork contract. Cable procurement contract template 2065438+ 05. Model Purchase Contract English 2065438+ 05, Model International Trade Purchase Contract Column Recommended Contract Model House Lease Contract Model Loan Contract Model Labor Contract Model Other Contract Model Agreement Top Ranking Sales Contract Model Partnership Contract Model Simplest Purchase and Sale Contract Model Partnership Contract Model Cooperation Agreement Model Engineering Contract Model Company Purchase Contract Model Latest Engineering Intermediary Contract Model Supply Contract Model Recommended Reading ktv Design Contract Model. Fish pond management contract model home renovation contract model ore supply contract model industrial and mining enterprises order green seedlings contract model building planning and design contract model industrial and mining products purchase and sale contract model medical procurement latest model building decoration engineering construction contract model goods storage contract model closed warehouse.