Seek supervision company instrument management system? Urgent urgent urgent urgent!

I, the configuration of instrumentation

The project should be combined with the specific circumstances of the project, the owner and supervision requirements, as far as possible, equipped with advanced measuring equipment, improve the degree of automation of engineering surveying work, reduce the labor intensity of the surveyor, improve efficiency and ensure that the results of the survey.

Second, the allocation and purchase of instruments

For the general project now more total station configuration, according to the actual situation of the project to be reasonable, applicable, economic. For the new project if you need to measure the instrument by the Ministry of Engineering Management according to the company's distribution of measuring instruments, such as the need to purchase measuring instruments need to fill out the "Instrument Purchase Application Form", the company's competent leader for approval before purchasing. For the transfer of measuring instruments for the project, the transfer unit and the transfer unit should fill out the "Instrument and Equipment Transfer Sheet" and indicate the integrity of the instrument and the instrument supporting accessories and other corresponding content.

Three, the use and management of instrumentation

(a) the instrument of the box, into the box and placement

1, the instrument before the box, the instrument box should be placed flat on the ground, it is strictly prohibited to handheld or embracing the instrument to open the box, so as to avoid damage to the instrument in the opening of the instrument on the ground. After the opening of the box should pay attention to see clearly the state of the instrument placed in the box, so as not to be used up after the original into the box.

2, the instrument in the box before taking out, should be loosened the brake screw, extracting the instrument, to use the hand to hold the base of the instrument, the other hand holding the bracket, the instrument will be gently taken out, is strictly prohibited to use hand-held telescopes and horizontal axis. After the instrument and its components are removed, the lid of the box should be closed in time to prevent dust from entering the box. Instrument box placed near the station, the box is not allowed to sit on people.

3, according to the location of the control point when placing the instrument, try to choose the location of flat terrain, construction interference is small, the placement of the instrument must pay attention to the instrument, check whether the instrument tripod is reliable, to confirm that the connection of the screw connection is firm, before letting go. However, it should be noted that the connecting spiral should be moderately tight, not too loose or too tight.

4, after the end of the observation should be the foot spiral and brake, micro-action of the spiral back to the normal position, and with a mirror paper or soft brush to remove the dust on the surface of the instrument. Then remove the instrument with both hands, according to the location of the box into the original box. Cover the box should be gently tighten the brake screw, check the accessories can be gently close the lid, the lid can be covered only if the lid matches, do not apply strong pressure to avoid damage to the instrument.

(B) the use and management of instruments

1, a variety of measuring instruments should be in line with the bureau group companies on the management of measuring instruments.

2, the newly purchased instruments, tools, in the use of the national statutory measurement of technical verification organizations should be certified. Newly purchased instruments, transferred to other projects of the instrument, should be combined with the instrument to carefully read the manual, from primary to advanced, the first basic operation after the advanced operation, repeated learning, summarizing, and strive to do "handy" to maximize the role of the instrument, not familiar with the operation of the instrument shall not be blindly using the machine.

3, before and after the use of a variety of measuring instruments must be routinely inspected and calibrated, the use of the process of good maintenance, timely maintenance after use.

4, a variety of photoelectricity, laser instruments must be regularly sent to qualified departments for identification. Identification time should not exceed the specified time to ensure the accuracy and precision of measurement.

5, it is strictly prohibited to use the instrument without inspection and identification, correction of the factory precision, more than the identification cycle, as well as missing parts and display value is difficult to defend.

6, the use of total station, photoelectric rangefinder, in the absence of a filter prohibit the telescope directly to the sun, so as not to harm the eyes and damage to the distance measuring part of the light-emitting diode.

7, in strong sunlight, rain or humid environment, be sure to work under the cover of an umbrella.

8, the instrument should be carefully and gently put to avoid strong impact vibration, the placement of the instrument should be checked before the firmness of the tripod, the entire process of operation staff shall not leave the instrument to prevent accidents.

9, transfer station, even if very close should be removed from the instrument box. After the measurement work is finished, turn off the machine and remove the battery before packing, and provide suitable shock absorption measures for long-distance transportation to prevent the instrument from sudden vibration.

10. Measuring instruments should be stored in a special warehouse in a dry, ventilated, shock-proof, fog-proof, dust-proof and rust-proof environment. Instruments should be kept dry, in case of rain, wipe it dry, put it in a ventilated place, dry and then boxed. All kinds of instruments should not be subject to pressure, freezing, moisture or high temperature, the instrument box should not be close to the stove or heating pipe.

11, the instrument long-distance transportation, should do a good job of shockproof, moisture-proof work. When loading must make sure that the instrument is placed, not upside down. Measuring personnel to carry the instrument in the car, the instrument should be placed on the shock pad or leg hold, in order to prevent damage to the instrument vibration bumps.

12, must establish and improve the measuring instruments and equipment ledger, precision measuring instruments card, instrument files and other systems, instruments out of storage, storage and relocation of the project, should be registered, signed procedures.

13, the management of measuring instruments, by the company's precision measuring team to develop inspection and evaluation methods, the maintenance of instruments with remarkable achievements in units and individuals to reward, due to improper use, poor storage caused by damage to the instrument should be held accountable in a timely manner, according to the circumstances of the punishment.

14, when the measuring instruments, tools for the following conditions are unqualified: has been damaged; overload or misoperation; the function of the suspicious; display is not normal; more than the required weekly inspection to confirm the time interval; the integrity of the instrument gag has been destroyed; photoelectricity, laser instruments more than the service life of the zero drift is serious, unstable measurement results, measurement results of the reliability of the low, you must apply for the scrap! When the routine instruments are damaged beyond repair, or when the instruments are worn out, difficult to recognize the value, unstable performance, affecting the quality of measurement, they must be applied for scrapping.

15, the application for the purchase of measuring instruments and scrapping by the project department reported to the company's engineering management department, the company's chief engineer and the competent leader is responsible for the approval of the company's precision team of the project's instrumentation and management of semi-annual inspections, the requirements of the accounts, objects, cards in line with the technical file is complete.

16, measuring instruments must be fixed person custody, valuable precision measuring instruments (such as total station, precision level, laser plumbing instrument) should be stipulated in the custody of a special person, a special person, a special person to send inspection, others are not allowed to use, in order to prevent damage to reduce the accuracy.

(C) instrument management rewards and punishments

1, in order to strengthen the management of engineering measurement, to promote the scientific management of our company's engineering surveying work, to prevent the occurrence of measuring accidents, to adapt to the needs of economic development, and to give full play to the enthusiasm and creativity of the majority of the surveyors, the completion of the project, the advanced units of the engineering measurement management, the relevant leaders to give the necessary spiritual and material incentives. material rewards. Measurement of active and practical work, serious study, business proficiency, skills improvement, outstanding achievements, can be recommended for promotion.

2. Those who violate the regulations on measurement and metrology, make false statements, do not strictly implement the management system of measurement and metrology, and cause losses to the project due to the errors in measurement work in the production and business activities shall be given the necessary penalties. Those who conceal and do not report the measurement accidents shall be held responsible for the leadership and relevant personnel.

3, the measurement instrument management is lax, poor storage, resulting in damage, affecting the normal use, depending on the severity of the case, the responsible person shall be punished.

4, the project engineering department should be based on the actual situation of the project to develop appropriate management of measuring instruments, to ensure that the measuring instruments are intact and accurate.

In short, in order to strengthen the management of measuring instruments, so that the standardization of measuring instrument management system, to ensure that the correct use of measuring instruments, precision to meet the requirements of the measurement specifications, accurate and reliable measurement data, to better serve our engineering and construction services to ensure that the project measurement control is effective, and hope that we consciously abide by.