What are the overpasses on the Third Ring Road in Chengdu?

Chengdu Third Ring Interchange has (northeast clockwise from Chengmian Interchange):

Chengdu-Mianyang Interchange, Longtan Interchange, Chengnan Interchange, Shiling Interchange, Chengdu-Chongqing Interchange, Daguan Interchange (now called Aerospace Interchange), Lion Mountain Interchange (now called Jiaozi Interchange), Liuli Interchange, Guixi Interchange, Tianfu Interchange, Shiyang Interchange, Nanhua Interchange, Lantian Interchange, Sichuan-Tibet Interchange, Wuhou Interchange, Cao Jin Interchange, Su Po Interchange, Yangxi Interchange and Jinniu Interchange.

The total length of the Third Ring Road is 50.890 kilometers, and the whole process is designed at 80 kilometers per hour. There are 5 fully interchanged overpasses, 8 partially interchanged overpasses and 9 overpass bridges. After opening to traffic, the Third Ring Road will connect Chengdu-Mianyang Expressway, Chengnan Expressway, Chengguan Expressway, Chengya Expressway and Le Cheng Expressway.

Extended data

The Sichuan-Tibet Interchange and Lantian Interchange in Chengdu Third Ring Road will be opened to traffic by stages from now on.

Breakthrough progress has been made in the reconstruction of Sichuan-Tibet Interchange and Lantian Interchange on the Third Ring Road, which will be opened to traffic in stages from April 30th. The newly-built auxiliary roads and slow tunnels on both sides of the Sichuan-Tibet Interchange in the Third Ring Road will be officially opened to traffic on April 30, 2020 16: 00, effectively solving the problems of narrow auxiliary roads and mixed traffic between vehicles and roads under the bridge.

On April 30, 2020, the two ramps in the direction of high-speed entry into the city of Lantian Interchange Airport will be officially opened to traffic, and the two ramps in the direction of high-speed exit from the airport and the auxiliary road under the bridge will be fully completed and opened to traffic in stages after the "5. 1" festival. By then, the problems such as impassability of the auxiliary road of Lantian Interchange, long detour distance and weak traffic conversion will be effectively solved.

Baidu encyclopedia-Chengdu third ring road