Equipment
Need to be determined according to your water quality requirements and water production requirements, and production **** with the decision.
Your production
yield and automation level need to be determined. Infrastructure, financial readiness, purchase of equipment, the normal operating conditions of the plant.
You first need to understand the water plant, the required documents.
Below to give you a little equipment advice:
Production equipment process introduction:
Raw water tanks--
--
--
--
--
--
--
--Ultraviolet sterilizers--
The machine
The above process is only a reference, specific process needs to be adjusted according to the raw water quality report.
Production process introduction:
Full-automatic cap puller - Full-automatic barrel brushing machine - Full-automatic bottle loading machine - Full-automatic
- Full-automatic light checking and film collecting machine ---- Full-automatic barrel lifting and bagging machine
Capacity and automation degree of the above filling system can be configured as an option.
The two combined, it can be produced
But this is only the production on the equipment, does not include the water plant internal aseptic workshop construction equipment and water plant laboratory equipment. If you want to run into a certain scale
factory must start from the following procedures: "health license" "production license" "environmental protection license" "practitioners health inspection"
"tax registration.
Production enterprise procedures and declaration materials
One, to the Industrial and Commercial Bureau of the name pre-certification
Two,
The
Declaration of materials:
Application form;
2. Practitioners
Copies (1 person, 1 certificate, not in the Audit Section in a timely manner);
3.
3.
Approval notice;
4. A copy of the ID card (
, the person in charge of).
5. Health license commitment notice;
6. Production
and the surrounding environment
(marked functional distribution, sanitation and production facilities and production equipment set up layout map);
7.
, formula (production and processing industry);
8. Health
book;
9. There is a corresponding health system, on the wall.
Third, the Industrial and Commercial Bureau for business license
1.
In the business office where the enterprise;
2. Limited liability company in the
Industrial and Commercial Bureau window
Declaration materials
1, the company chairman of the board of directors signed an application for the registration of the establishment of a copy of the application form;
2, all the shareholders to designate the * **** or *** with
certificate;
3,
Original copy;
4, with the legal qualifications of the capital verification agency issued
Original copy;
5, shareholders of the
certificate or
copy of identification; (copy of the company's business license) < /p>
6. One original document containing the name and residence of the company's director,
, manager and the proof of appointment, election or employment (
);
7. One copy of the document of appointment of the
definitive ***** person;
8. One copy of the notification of the company's pre-approval of the company's name;
9, A copy of the certificate of the company's domicile;
10. Approval documents that must be submitted for approval as stipulated by laws and regulations.
4, engraved official seal
5, the Quality Supervision Bureau for the organization code
1, the original business license and a copy of each;
2, a copy of the legal person or person in charge of the ID card;
3,
book declaration form (stamped with the official seal) a copy.
6, tax registration
1, the original business license and a copy of each;
2, a legal person or the person in charge of a copy of the ID card;
3, tax registration application form (stamped with the official seal) a copy.
4,
Book
seven,
for the water permit
Declaration materials: 1. "Application for Water Permit" a copy of;
2, construction
or water resources demonstration report;
3, a third party has an interest in a copy of the supporting materials.
Eighth, the Quality Supervision Bureau for
Procedure: the county preliminary examination - the city review and inspection - reported to the state for approval
Declaration of materials:
1.
Application
; <
2.
Copy of industrial and commercial
;
3.
Copy of
;
4.
Copy of certificate in triplicate;
5.
5. Copy of ID card of the person in charge of the enterprise (the legal ***** person) in triplicate;
6. Production place of the enterprise Layout plan in two copies;
7, the enterprise production of arts and crafts
two copies;
8, the enterprise
documentation in one copy;
9,
Text in one copy;
10, H ***** system certification certificate, the export of food hygiene registration (registration) certificate copy of the construction of aseptic workshop, a primary bucket washing pool, a secondary bucket washing pool, a locker room, a secondary bucket washing pool, a locker room, a locker room, a locker room, a locker room, a locker room and a locker room. Wash bucket pool, locker room, foot pool,
and other purification equipment and laboratory construction. For the construction of the height of the plant, you need to refer to the height of the equipment; inside the plant
Note the size of the equipment and placement of the orientation; the floor needs
, filling workshop needs to be affixed to the wall tiles.
As for the specific
, the need for equipment production plant design, we do customers are first by the customer to provide detailed plant
, and then according to
and equipment size design corresponding to the plant diagram.