Pure water production process and the equipment required.

Depending on the quality of your raw water and the quality of the water you need to produce.

Equipment

Need to be determined according to your water quality requirements and water production requirements, and production **** with the decision.

Your production

yield and automation level need to be determined. Infrastructure, financial readiness, purchase of equipment, the normal operating conditions of the plant.

You first need to understand the water plant, the required documents.

Below to give you a little equipment advice:

Production equipment process introduction:

Raw water tanks--

--

--

--

--

--

--

--Ultraviolet sterilizers--

The machine

The above process is only a reference, specific process needs to be adjusted according to the raw water quality report.

Production process introduction:

Full-automatic cap puller - Full-automatic barrel brushing machine - Full-automatic bottle loading machine - Full-automatic

- Full-automatic light checking and film collecting machine ---- Full-automatic barrel lifting and bagging machine

Capacity and automation degree of the above filling system can be configured as an option.

The two combined, it can be produced

But this is only the production on the equipment, does not include the water plant internal aseptic workshop construction equipment and water plant laboratory equipment. If you want to run into a certain scale

factory must start from the following procedures: "health license" "production license" "environmental protection license" "practitioners health inspection"

"tax registration.

Production enterprise procedures and declaration materials

One, to the Industrial and Commercial Bureau of the name pre-certification

Two,

The

Declaration of materials:

Application form;

2. Practitioners

Copies (1 person, 1 certificate, not in the Audit Section in a timely manner);

3.

3.

Approval notice;

4. A copy of the ID card (

, the person in charge of).

5. Health license commitment notice;

6. Production

and the surrounding environment

(marked functional distribution, sanitation and production facilities and production equipment set up layout map);

7.

, formula (production and processing industry);

8. Health

book;

9. There is a corresponding health system, on the wall.

Third, the Industrial and Commercial Bureau for business license

1.

In the business office where the enterprise;

2. Limited liability company in the

Industrial and Commercial Bureau window

Declaration materials

1, the company chairman of the board of directors signed an application for the registration of the establishment of a copy of the application form;

2, all the shareholders to designate the * **** or *** with

certificate;

3,

Original copy;

4, with the legal qualifications of the capital verification agency issued

Original copy;

5, shareholders of the

certificate or

copy of identification; (copy of the company's business license) < /p>

6. One original document containing the name and residence of the company's director,

, manager and the proof of appointment, election or employment (

);

7. One copy of the document of appointment of the

definitive ***** person;

8. One copy of the notification of the company's pre-approval of the company's name;

9, A copy of the certificate of the company's domicile;

10. Approval documents that must be submitted for approval as stipulated by laws and regulations.

4, engraved official seal

5, the Quality Supervision Bureau for the organization code

1, the original business license and a copy of each;

2, a copy of the legal person or person in charge of the ID card;

3,

book declaration form (stamped with the official seal) a copy.

6, tax registration

1, the original business license and a copy of each;

2, a legal person or the person in charge of a copy of the ID card;

3, tax registration application form (stamped with the official seal) a copy.

4,

Book

seven,

for the water permit

Declaration materials: 1. "Application for Water Permit" a copy of;

2, construction

or water resources demonstration report;

3, a third party has an interest in a copy of the supporting materials.

Eighth, the Quality Supervision Bureau for

Procedure: the county preliminary examination - the city review and inspection - reported to the state for approval

Declaration of materials:

1.

Application

; <

2.

Copy of industrial and commercial

;

3.

Copy of

;

4.

Copy of certificate in triplicate;

5.

5. Copy of ID card of the person in charge of the enterprise (the legal ***** person) in triplicate;

6. Production place of the enterprise Layout plan in two copies;

7, the enterprise production of arts and crafts

two copies;

8, the enterprise

documentation in one copy;

9,

Text in one copy;

10, H ***** system certification certificate, the export of food hygiene registration (registration) certificate copy of the construction of aseptic workshop, a primary bucket washing pool, a secondary bucket washing pool, a locker room, a secondary bucket washing pool, a locker room, a locker room, a locker room, a locker room, a locker room and a locker room. Wash bucket pool, locker room, foot pool,

and other purification equipment and laboratory construction. For the construction of the height of the plant, you need to refer to the height of the equipment; inside the plant

Note the size of the equipment and placement of the orientation; the floor needs

, filling workshop needs to be affixed to the wall tiles.

As for the specific

, the need for equipment production plant design, we do customers are first by the customer to provide detailed plant

, and then according to

and equipment size design corresponding to the plant diagram.