Model Engineering Contract 2022 Part 1
Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the "People's Republic of China*** and the State Law", the "Chinese People's Republic of China*** and the State Construction Law", and other relevant laws, regulations, rules and regulations, Moral equality, voluntariness, fairness and the principle of honesty and credit, A and B on the Zhaodong Shuguang Driving School glass rain ride project construction matters agreed upon after consultation, to enter into this contract.
I. Project name:.
Second, the project address:
Third, the contracting method: package (big package).
Fourth, the content of the project: point glass rain lap.
V. Project materials:
1, frame: 15mm and 10mm iron plate made of glass rain hitch special frame, made after rust treatment, and then fluorocarbon baking paint.
2, Tension: point glass rain hitch special tension.
3, glass: 8mm + 8mm toughened laminated glass, with a special point glass bracket installed on the main frame driving.
Six, the total price of contracting: (1500 yuan) per square meter, about 66 square meters, a total of (99,000 yuan), rebar alone, not in the total square meter cost, the final settlement of the acceptance of the actual measurement of the area settlement.
VII, duration: one month from the date of receipt of the advance payment to complete the work.
VIII, payment: after the signing of the contract, the advance payment of 10,000 yuan deposit, the main frame steel plate into the site
30% of the payment for the project, the main frame installation is completed in the payment of 30%, completion and acceptance of the payment of 37%, to stay 3% of the quality of the deposit. (No quality problems in accordance with national regulations within one year to return the warranty).
IX. Liability for breach of contract:
1, the contractor to the contracting party commitment to construction in accordance with this contract, during the construction period, caused by Party B stoppage or insufficient personnel, the quality of the contract does not meet the requirements of the provisions of the contract, shall be reworked to start again, resulting in losses borne by Party B, the construction period will not be postponed.
2, the contractor to the contractor promised to pay the contract price and its payment should be made in accordance with the agreed period and manner of this contract, to fulfill all the obligations agreed in this contract. Because Party A does not pay for the work as agreed in this contract, Party B has the right to stop the work, and the work period will be postponed, resulting in the loss of personnel and machinery nesting and the corresponding costs incurred by Party A, and to pay the cost of breach of contract before resumption of work.
X. This contract, the two sides to solve the outstanding issues, consultation can not be litigated to the Zhao Dong City People's Court.
XI, this contract in duplicate, both sides of a, signed and sealed after the entry into force, hope *** with compliance.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day
Sample Engineering Contract 2022 Part 2
Party A: (hereinafter referred to as Party A) ____________ Party B: (hereinafter referred to as Party B) ____________
Party A power station water conservancy project with a total length of 2,800m, the two individual projects shall be completed by the end of 20 ______ Before completion. Now party B voluntarily lead the team to request the construction, the A and B parties agreed to sign the following contract terms.
First, Party B limited to package ditch project length of 500m, package retaining wall 500m.
Second, the unit price of the ditch by five yuan per meter, the retaining wall according to each cubic meter of ten yuan.
Third, Party B construction guttering, masonry wall of Woodbury meters completed subsequent package.
Fourth, Party A is responsible for the project for cement, stone powder, slate, corner board, water, electricity, mixer, rickshaw, etc. in place, the supply of Party B shed cloth by Party B scaffolding.
Fifth, the settlement method: the package of Woodbury meters after the completion of 100 percent of the checkout payment clear, during the period of Party A at any time to pay Party B living expenses, the checkout Party A as a number of deductions back.
Six, Party B has its own brick cutter, min knife, small hammer, quilt and daily necessities of vegetable pots, rice pots, chopsticks, car 40 yuan, 5 days living expenses of 60 yuan, each person from home to bring their own rice 20 pounds, Party B construction five days after the Party to pay the cost of living.
Seven, construction specifications:
1, Party B construction, should be the first berm wall height 1.4m, plane width of 50 centimeters;
2, followed by the frame angle plate, both sides of the height of 1.4m, the ditch mouth width of 1.7m, the bottom of the ditch 1.4m, the actual ditch is the bottom of the narrow ditch, the ditch mouth width of the three light gutter, such as the pattern of the concave, in short, the construction of the A side of the technician site guidance shall prevail! In short, the construction of the Party A technician on-site guidance shall prevail, Party B anyone must obey Party A's arrangements for guidance.
Eight, the above two single project B completed, the project command acceptance, the next day settlement payment.
IX, Party B construction period, night or rainy days are strictly prohibited playing cards, gambling, drinking, fighting, fighting, inside and outside the theft and robbery behavior. Such as the occurrence of such things, resulting in economic losses, by Party B, the individual responsible for the consequences, Party A is not responsible.
X. The terms of this contract are not exhaustive, in the construction, if found in conflict with the terms of the contract, must be negotiated between Party A and Party B, and obtain the consent of both parties to the contract terms of the additions and deletions, modifications, additional contract terms and the original contract terms have the same legal effect.
XI, this contract shall enter into force on the date of signing by A and B, and shall be protected by law. This contract is in triplicate, Party A holds a copy, Party B holds a copy, and the project command holds a copy.
XII, Party B in the construction, must be good safety first, such as accidents and casualties, by Party B, Party A is not responsible.
Party A's representative signed the following: ____________
Party B's representative signed the following: ____________
______ year ______ month ______ day
Sample Engineering Contract 2022 Part 3
The contract Both parties:
Commissioned by the unit (Party A):
Agent (Party B):
Date of signing the contract: Month of
Commissioned by the party will be the bidding matters entrusted to the agency of the Party B, according to the "Chinese People's Republic of China *** and the State Tenders and Bidding Law" and the relevant laws and regulations, the contract between the two sides by consensus, signed this contract.
First, the content and form of agency business:
Party A entrusted Party B to organize construction project bidding activities.
Overview of the project:
The scope of the tender: construction drawings.
1, the contents of the bidding agent: fill out the application form, preparation of tender documents (including the preparation of pre-qualification documents); review of the qualifications of the bidders; the organization of the bidders on-site and Q&A; the organization of the bid opening, bid evaluation, bidding; to provide pre-bidding consulting and other business;
2, the form of bidding agent: inviting tenders
Second, the conditions of work and collaborative matters:
1, the construction project planning license, construction project funding sources, etc. (see "do 1 construction project bidding and tendering information to be submitted" list).
2, the commissioner to provide construction drawings and technical information that can meet the construction, bidding price calculation requirements.
3, Party B agency process, comply with national and local laws and regulations related to construction bidding, tendering, adhering to the principle of openness, fairness, justice and honesty and credit, in accordance with the relevant procedural provisions, acceptance of bidding supervision and management supervision.
4. The commissioning agent shall issue a commissioning certificate when signing this contract.
3. Delegation period:
This contract shall be executed from the date of signing, and shall be annulled after the issuance of the notice of award.
IV. Payment of fees and date:
The cost of this project is RMB (capital), and the total agency fee is charged RMB (capital). Payment shall be made in cash or by transfer, and the whole fee shall be paid in one lump sum when the notice of award is issued. Party A may choose to pay a one-time payment of RMB or only RMB according to the completion of the work by Party B. Party B has no objection.
V. Liability for breach of contract:
1, both parties must strictly abide by the terms of the signed agency contract, shall not be in breach of contract;
2, the commissioning party should provide true and reliable information, and according to the fourth paragraph of the agreement to pay the agency fees, or all the responsibility by the commissioning party.
3, the two sides in the contract implementation process of disputes, can be resolved through consultation, but also by the relevant departments to mediate.
4, the two sides of the agency contract terms of change must be signed in addition to the terms of the contract, the terms of the supplementary contract as part of the agency contract and the main contract has the same legal effect.
5, the contract in triplicate, Party A, Party B, a copy of the bidding management organization.
6, the other terms of the agreement between the two sides
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ date
Engineering Contract Model 2022 Part 4
Contractor (Party A): Guiyang Jinhui Electric Power Industry Corporation.
Contractor (Party B): Zunyi City, Guizhou Province, Zhengye Electrical Installation Engineering Co.
Article I. Contract basis
The legal basis of this contract is the Chinese People's **** and the State "Contract Law" and "Construction and Installation Engineering Contract and Construction Regulations"; the content of the project and the amount of work is according to the design of Guizhou Nengda Electric Power Design Limited Liability Company, "Qingzhen, Hanpoling, 110kv substation new construction project, electrical part of the first volume of the sixth book of all the lighting and the first volume of the seventh book of lightning protection" construction drawings as the basis for the work. Grounding" construction drawings based on the calculation and approval.
Article 2: Project name, location, scope and content
I. Project name: Qingzhen Hampaoling 110kv substation whole grounding and lighting installation project.
Second, the project location: Qingzhen Hanpo Ling 110kv substation.
Third, the scope and content of the project:
1: Qingzhen Hanpo Ling 110kv substation lightning protection and grounding installation.
2: Qingzhen Hanpo Ling 110kv substation lighting installation.
Article III contracting mode
The project will be contracted to Party B in the way of contracting work and materials according to the actual settlement of the downward floating %. (Settlement quota using the 20xx Beijing price book; installation materials budget price implementation of Guizhou Electric Power Company QianDianDingZi (20xx price) notice; cost composition implementation of the "electric power industry capital construction budget management system and regulations" (20xx version); according to the Guizhou Provincial Electric Power Company electric technology and economic [20xx.
Article IV Matters of collaboration between the two sides
Party A is responsible for:
A: Party A should coordinate the project with the relevant units to ensure the construction progress of the project.
Second: Party A should be based on Party B's construction progress and hidden information in a timely manner to organize the relevant departments for intermediate acceptance.
Party B is responsible for:
I: Party B in the construction of the problem should be found in a timely manner to Party A response.
Second: Party B should complete all the work in the project on time and on schedule, without affecting other projects.
Third: the completion data reported to the relevant departments for review.
Article V. Liability for breach of contract
According to the relevant laws and regulations of the state to pursue the other party's liability for breach of contract.
Article 6: Handling of economic disputes
In case of economic disputes, both parties shall negotiate and solve the problem in accordance with the principle of seeking truth from facts, and if they cannot reach the goal, they can apply for arbitration to the People's Court.
Article VII Construction Period
The project will be completed before January of this year.
Article VIII Engineering Contracting Mode
The contract price of this project is the project's: labor, machinery, auxiliary materials, and main materials.
Article IX Safety Responsibility
Party B is responsible for its own safety in the construction and bears the corresponding responsibility independently.
Article X Project Cost
The project's project cost: tentative one hundred and twenty-nine thousand nine hundred and seventy-five hundred and sixty dollars (129760.00), the project package according to the actual settlement.
Article XI of the contract
This contract is the original 2 copies, both sides of the positive 1 copy.
Article XII of the contract signed by the representatives of the two sides, seal and enter into force.
Party A: (official seal) Party B:
Responsible person: (signature)
Date: January, 2012 Date: January, 2012
Engineering Contract Model 2022 Part 5
Commissioned by: (official seal)
(Party A)
Agent: (official seal)
(Party B)
Date of signing the contract:
Both parties to this contract:
Entrusted unit (Party A):
Agent (Party B): Haikou Jiancheng Engineering Bidding Agency Co. The entrusted party will __________ entrust the bidding of the project to Party B agent, based on the "Chinese People's** and State Tender Law" and the "Chinese People's** and State Tender Law" and the "Chinese People's** and State Tender Law", and the "Chinese People's** and State Tender Law" and the "Chinese People's Tender Law" and the "Chinese People's Tender Law". * and the State Bidding Law" and the provisions of relevant laws and regulations, the contract between the two sides by consensus, signed this contract.
I. Content and form of agency business:
Party A entrusted Party B to organize construction project bidding activities.
Overview of the project:
Scope of the tender:
1, the contents of the bidding agent: fill in the application form, preparation of tender documents (including the preparation of pre-qualification documents); review of the qualifications of the bidders; the organization of the bidders on-site survey and Q&A; organization of the bidding opening, bid evaluation, bidding; provide pre-bidding consulting and other business.
2, the form of bidding agent:
Second, the working conditions and collaborative matters:
1, temporary license for construction planning, construction projects, such as proof of the source of funds (see the list of "information to be submitted for the bidding and tendering of construction projects").
2, the commissioning party to provide to meet the construction, bidding price calculation requirements of the construction drawings and technical information; or by the qualification conditions of the engineering cost consulting organization to prepare the construction project investment pre-budget estimates.
3, Party B agency process, comply with national and local laws and regulations on bidding and tendering for construction, adhere to the principle of openness, fairness, justice and honesty and credit, in accordance with the relevant procedural provisions, and accept the supervision and management of bidding supervision and management departments.
4. The commissioning agent shall issue a commissioning certificate when signing this contract.
3. The period of entrustment:
This contract shall be executed from the date of signing and shall be annulled by itself after the issuance of the notice of award.
IV. Mode and date of payment of fees:
1. The cost of the project is RMB (in capitals), and the total agency fee is charged in RMB (in capitals). Payment shall be made in cash or by transfer, and the agency fee shall be paid in full before the opening of the bid. The agency fee does not include the cost of preparing the tender, pre-qualification and bid evaluation expert fees.
2, the bidding unit to buy the tender each copy of the cost of work of RMB yuan (capital), the proceeds of Party B.
5, the bidding unit to buy the tender each copy of the cost of work of RMB yuan (capital), the proceeds of Party B.
V. Liability for breach of contract:
1, both parties must strictly abide by the terms of the signed agency contract, shall not be in default;
2, the commissioning party should provide true and reliable information, and according to the fourth paragraph of the first agreement to pay the agency fee, otherwise all the responsibility by the commissioning party.
3, the two sides in the contract implementation process of disputes, can be resolved through consultation, but also by the relevant departments to mediate.
4, the two sides of the agency contract terms of change must be signed in addition to the terms of the contract, the terms of the supplementary contract as part of the agency contract and the main contract has the same legal effect.
5, the contract in triplicate, Party A, Party B, a copy of the bidding management organization.
6, the other terms of the agreement between the two sides:
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ date
Sample Engineering Contract 2022 Part 6
Engineering Contractor: _____________________________________ (referred to as Party A) Engineering Contractor: _____________________________________ (referred to as Party B) In accordance with the "Chinese People's **** and State Contract Law", "Chinese People's **** and State Construction Law" and other relevant laws and administrative regulations, follow the principle of equality, voluntariness, fairness and honesty and credit. On __________ waterproofing project contracting and construction of specific matters, the two sides formulated the following agreement:
I. Party A will be the above waterproofing project to Party B contracting and construction of the project is located in _______________, the project is expected to volume of work of about __________, the two sides agreed to use ___________________ for construction.
Second, Party A entrusted _________ comrades, Party B entrusted __________ comrades, as site representatives, *** with the supervision and management of the quality of construction works, coordinating and dealing with the construction of the project, including visas and other considerable matters.
Third, Party B in the construction should be submitted to Party A before the construction of the construction organization design and progress of the project plan for review and approval, Party A should ensure that the site meets the construction conditions, Party B can carry out the construction, the construction period according to the Party's requirements of a reasonable period of time, Party B to ensure that the completion of rainy days or can not operate to report the Party agreed to extend the exception. Otherwise, Party B will be willing to bear any penalties for delaying Party A's construction period. Construction, Party B life on their own, non-Party A reasons for the security consequences of their own.
Fourth, Party B in the construction, need to submit to Party A _______________ relevant construction information, and according to the construction specification construction, to ensure that ________ the leakage caused by waterproofing engineering style quality problems for repair.
Fifth, Party B project completion, that is, to provide Party A with the completion of the acceptance of the application report, the amount of work calculations, engineering bill. Party A should organize acceptance of the project within ____ days, accounting for the amount of work and the cost of the amount, the late view of the project as in line with the specifications of the work requirements, Party B's report, the settlement sheet is recognized, Party A needs to be based on Party B's settlement of the cost of the project to pay the money.
Sixth, Party A and Party B agreed to the cost of the project calculated in accordance with __________________, the total cost of about ___________________
Seventh, the two sides agreed to the project payment method:
VIII, the other agreed matters:_____________________
Nine.
X. This contract is a form of _______ copies, A and B parties to implement _______ each, since the two legal persons signed, stamped and entered into force. Party A (official seal): _________
Party B (official seal): _________ Legal representative (signature): _________
Legal representative (signature): _________ ________ year ____ month ____ day
________ year ____ month ____ day< /p>
Sample Engineering Contract 2022 Part 7
Party A (the commissioning party): _______________ Party B (the carrier): _______________
According to the "People's Republic of China*** and the State of China Contract Law" and other relevant state laws and regulations, through the friendly negotiation between the A and the B parties
Article 1 scope of cooperation: Party A entrusted Party B to undertake the transportation of goods from Party A's designated point of departure to the destination of the transportation business.
Article II Service Requirements
1, Party B should be based on Party A's demand for transportation of goods, the timely dispatch of vehicles to transport Party A's goods, the condition of the vehicles should be in line with the safety requirements of long-distance transportation of Party A's goods.
2, Party B shall make every effort to deliver the goods to the destination according to the time, place and consignee specified by Party A.
Article 3: The goods shall be transported in accordance with Party A's requirements.
Article 3: Determination of transportation price and payment
1. Transportation price: the price should be confirmed before each transportation.
2. The freight settlement period is monthly _____ days, i.e. the freight incurred in the month is settled in the next month.
3. Payment method: transfer
Article 4: Limitation of Contract and Dispute Settlement
1. This contract is valid from _________ ______ month __ to _________ ______ month __ expiration of this contract if both parties do not propose to terminate this contract, this contract automatically continues to be valid.
2, this contract ___ copies, signed and sealed by both parties, each party ___ copies, with the same legal effect;
3, this contract is not exhaustive, the two sides agreed to sign a supplemental agreement, confirmed as a necessary addition to this contract, and this contract has the same effect.
Party A: _______________ Party B: _______________
On behalf of: _______________ On behalf of: _______________
Signing place: _______________
Date of signing: _________ _____________ Date of signing: _________ _____________
Sample Engineering Contract 2022 Part 8
After the negotiation between the two parties, Party A agrees that the Xinyang Road No. 292 Flour Mill Old Reorganization Project, Blasting and Demolition of Vertical Cylinder Bank contracted to Party B for construction. According to the "People's Republic of China *** and the State Economic Contract Law" and the relevant provisions of national law, in order to clarify the relevant responsibilities, rights and obligations of both parties, we have signed the following terms of the agreement, the two sides *** with compliance.
First, the project name: Xinyang Road, No. 292 flour mill old renovation project, blasting and demolition of vertical storage
Second, the project location: Xinyang Road, No. 292 flour mill
Third, the scope of the project contract and the content of:
1, according to the Party's arrangements for the scope of the blasting and demolition of the order.
2, demolition demolition content includes: cloth hole charging, detonation network laying, warning detonation, post-blast inspection, concrete blocks larger than 50 centimeters as well as reinforcing concrete is not blown off part of the crushing.
3, for all blasting project approval procedures.
4, do a good job of building safety fences, and meet the acceptance requirements.
Fourth, the amount of work: according to the actual square footage.
V. Settlement: according to the actual square volume, with a single party RMB 1120xx0 yuan lump sum, settlement after deducting the tax paid to Party B.
VI, construction period: days
VII, construction requirements: to ensure safe and fast construction, the basic separation of reinforcing steel and concrete blocks after blasting, to meet the requirements of the Party, the supervision and the owner.
VIII, the responsibility of both parties:
(a) Party A's responsibility
1, to assist Party B for the blasting approval procedures and coordination of the construction site within the construction unit owners of the relationship;
2, is responsible for Party B to provide the construction of the two rooms, as Party B construction materials, construction personnel rest and blasting when the convergence of the point;
3, is responsible for providing the construction-related drawings;
3, is responsible for the provision of Construction-related drawings;
4, is responsible for undertaking Party B before blasting according to the program, regulations and other safety protection work, not in line with the provisions of the regulations, procedures must be rectified and improved;
5, to assist Party B in the construction of the blasting of the warning range of people (including the site of Party A construction workers and living quarters) of the evacuation work;
6, is responsible for the provision of Party B's construction of electricity.
7.
(B) Party B's responsibility
1, Party B must be "safety first" implementation of the demolition of the entire blasting work, strict implementation of the "Blasting Safety Regulations" gb6722-20xx and the state, provinces, cities and standards and regulations related to the safety of blasting works, not in line with the provisions of the regulations must be rectified and improved!
2, responsible for the preparation of blasting design and blasting related approval procedures, responsible for public security, traffic police and other departments of the coordination, and bear all the costs (including blasting safety assessment costs);
3, in the Party A gas cutting of reinforcing steel, Party B sent a safety officer to the whole process of guardianship;
4, is responsible for pyrotechnic materials purchase, storage, transportation to the site, back to the site, and the blasting project safety standards and regulations must be rectified and perfected. In the implementation of blasting, such as blasting rock vibration caused by the alert range of people, houses, vehicles, injuries, damage, bear all the safety responsibilities (including economic), and Party A has nothing to do;
6, Party B must take up the blasting Safety alert all the work, especially before the blasting cordon line and blasting site around the evacuation of people, such as Party B safety not in place and caused by safety accidents, all the responsibility (including economic) by Party B to bear;
7, to meet the owners, supervisors, the requirements of Party A, the owner, supervision, and the competent authorities of Party A due to blasting, protection, etc., owners, supervisors and competent departments of Party A's penalties borne by Party B, and have the right to Suspension of payment of the project.
IX, the contract on behalf of the two sides signed and sealed after the entry into force, such as disputes between Party A and Party B negotiation to resolve the coordination fails to be resolved by the People's Court.
X. This contract is in four copies, Party A holds two copies, Party B holds two copies, both signed and sealed after the entry into force, the project is automatically invalidated after the settlement.
Party A: legal representative (or proxy) Signature: Date: Monthly
Party B: legal representative (or proxy) Signature: Date: Monthly