Air conditioner maintenance contract
Party A:
Party B:
Based on the "People's Republic of China **** and the State of the Contract Law" and related laws, A and B reached agreement on air conditioner maintenance through friendly consultation, agreed to sign the contract to perform according to the agreement of both parties.
One, the subject of the contract
Party B was commissioned by Party A to provide paid maintenance services for the air conditioning system of the business hall xxx brand in use. The scope of maintenance is: host, end, the maintenance of the entire system.
Including: business hall 1 floor host 2, end 10; business hall host by yuan / unit maintenance fee, end by yuan / unit maintenance fee. The above total, the total annual contract price of $. ¥: $
Two, maintenance period:
Year month to year month.
Three, payment:
Contract signed within ten days of the date of Party A to pay the full amount of RMB yuan, ¥: yuan
Four, maintenance service standards and content:
Strictly in accordance with the xxxx air conditioning system maintenance manual, air conditioning maintenance.
Specific content is as follows:
1, air-conditioning end system every year at the beginning of summer and winter to carry out a sterilization, disinfection, purification treatment, removal of microbial growth, eliminate the root cause of bacteria, so that the fan sent to regulate the wind in line with the air health standards.
2, the host system and pipeline anti-corrosion treatment once a year.
Electricity check solid wiring connectors Main power supply
Control power supply
Compressor motor
Exhaust fan motor
measurement of insulation resistance Distribution cable
Electric heater
Compressor motor
Exhaust fan motor
Measurement of DC resistance Various sensors
Electric heater
Compressor motor
Exhaust fan motor
Measuring DC resistance
Electrical heater
Compressor motor
Exhaust fan motor
Check temperature and pressure in normal use Compressor cylinder
Water inlet and outlet of evaporator
Water inlet and outlet of condenser
Compressor refrigerant inlet and outlet
Check current and voltage in normal use Mains power supply
Compressor Motor
Exhaust fan motor
Control power supply
Normal use checking of on/off valves Temperature control switches
Water flow switches
Exhaust valves, make-up valves
Indoor duct checking and repairing Once a year
Combing of the ribs Once a year (at the time of seasonal change)
Cleaning of the ribs Once a season
Cleaning the filter once a year
Replacement of the system circulating water once a year
Fifth, Party A's responsibility:
1, for Party B to access the air conditioning maintenance work to provide convenience.
2, to provide complete air conditioning technical information.
Sixth, Party B's responsibility
1, strictly in accordance with the company's air conditioning maintenance manual to provide air conditioning maintenance services to the party.
2, accept Party A supervision to ensure that the service is in place.
3, within 24 hours after receiving Party A repair notice to the scene.
4, replacement of faulty spare parts to Party A inspection, maintenance only charge for accessories and materials, accessories prices see accessories price list.
5, each maintenance must have a repair order, and reported to the use of the department and the property department to sign the confirmation; outside the contract costs incurred in the maintenance project to be signed by the power division to confirm.
Seven, the contract termination:
A, in one of the following cases Party A has the right to terminate the contract by written notice to Party B:
1, Party A to provide proof of change of property rights.
2, the maintenance program is not fully performed on time and quality for more than a quarter, and by xxx city authority to identify the real problem.
3, Party A due to force majeure reasons can not fulfill the contract.
B. Party B has the right to terminate the contract by written notice to Party A in one of the following cases:
1. Change of ownership.
2. Party B is unable to fulfill the contract due to force majeure.
3. If Party A is in bankruptcy, liquidation (except for merger or reorganization) or fails to repay the debts due.
VIII. Liability for breach of contract:
1. If Party A defaults on the contract: Party B shall pay liquidated damages of xxx dollars. And pay off the outstanding amount, Party B has the right to request Party A to continue to fulfill the contract.
2. If Party B is in breach of contract: Party B shall pay Party A a liquidated damages of xxx dollars. Party A has the right to require Party B to continue to fulfill the contract.
9, other agreed matters:
1, air-conditioning repair if the replacement of spare parts within xxx yuan costs borne by party B, xxx yuan from party A.
2, if the third party repair air conditioning damage caused by Party B is not responsible.
3, the contract of the two sides to resolve any outstanding issues through friendly consultation.
Ten, this contract in one copy, Party A holds three copies, Party B holds a copy of the two sides since the establishment of the signature and seal, and in accordance with the law.
Party A: Party B:
Legal representative: Legal representative:
Clerk: Clerk:
Date: Date:
The contract is signed and sealed by both parties.