Boiler emergency plan

Boiler emergency plan example (General 5)

In daily learning, work and life, there will inevitably be some accidents, in order to avoid things getting worse, from time to time to carry out emergency plan preparation in advance. Preparation of emergency plans need to pay attention to what problems? The following is my compilation of boiler emergency plan example (general 5), I hope to help you.

Boiler emergency plan 1

First, the alarm:

1, boiler accidents on campus, the first reaction is to call the "119" fire phone alarm, or report 110. alarm should be clear boiler accidents units, road name, accidents The police should be clear about the boiler accident unit, road name, the accident department, the accident occurred in the situation, to make clear my name, phone number, etc..

2, after the completion of the alarm, that is, to the principal report.

3, the principal received the report, immediately called the unit of the relevant personnel to arrive at the scene of the accident.

Second, the establishment of a temporary boiler accident command:

By the principal and the relevant personnel to choose the appropriate part of the establishment of the command, the principal for the command command.

Three, notification:

According to the guiding ideology of "saving lives first and accurate, rapid, concentrated efforts", the use of the unit's publicity tools, sent to the school personnel to inform.

The content of the briefing:

1, the occurrence of the accident;

2, the emotional stabilization of the personnel;

3, the evacuation and rescue.

Fourth, evacuation and rescue:

1, the power supply must be cut off immediately;

2, the development of the safety zone, to determine the evacuation of the collection of personnel to set up a safe channel;

3, the division of labor is clear, guiding and escorting the trapped people to the safety zone evacuation, and do the work of emotional stabilization.

4, on-site rescue: by the school hygienist in the safety zone in a timely manner to deal with the injured or sent to the hospital for treatment.

Fifth, the accident scene processing:

1, such as fire: must be organized to extinguish the fire equipment, the person in charge of fire fighting by the school fire fighting command, and isolate flammable items or materials, rapid organization of volunteer firefighters or know how to firefighting knowledge of the personnel, the use of firefighting equipment at the scene, the facilities and equipment to carry out the extinguishing of the fire.

2, such as the explosion: first isolate the flammable items or materials to prevent the fire and the second explosion.

Six, safety alert:

1, the school perimeter alert: eliminate barricades, persuade pedestrians to evacuate the scene. If the fire to meet the firefighters and police station personnel to arrive at the scene to create favorable conditions.

2, firefighters, police station personnel arrived at the scene, by the school command immediately to the fire command or police station personnel to report the occurrence of accidents, and the transfer of command, listen to the public security fire or police station personnel transfer.

3, protect the scene of the accident, prohibit the entry of relevant personnel, and actively assist the fire public security and other relevant departments to investigate the cause of the accident.

Boiler emergency plan 2

A boiler introduction

1, the logistics director for the leader, the boiler room of the technical backbone of the members of the emergency response team.

2, each boiler room is equipped with emergency lights and emergency accessories and tools.

3, a sound security-oriented fire protection system, equipped with qualified firefighting equipment, to ensure that firefighting equipment is safe and reliable.

4, do a good job of daily boiler maintenance, to ensure the integrity of the boiler, to ensure the safe operation of the boiler.

5, regular boilers, pressure gauges, gas safety alarm devices for inspection, inspection, to be safe and reliable.

6, regular manual testing of boiler safety devices to ensure that the safety devices are sensitive and reliable.

7, regularly check the fire safety channel to ensure safe and smooth evacuation of people.

8, the stoker for fault emergency treatment training, to ensure that the fault handling procedures are legal.

9, to maintain smooth communication, the establishment of the boiler room supervisor failure reporting system at all levels, in case of emergency, can be directly reported over the level.

10, the boiler room must be before the start of the annual heating and heating operation during a drill.

11, before the drill must fill out the required task plan for planning, approved by the top managers before implementation.

Second, the organization of emergency rescue and its responsibilities

1, the school set up a major accident emergency rescue command leading group. By the principal and the head of each department and other departments and managers of key positions.

2, the emergency organization by the fire fighting group, rescue and repair group, material supply group, transportation group, alert evacuation group, medical rescue group, communication and liaison coordination group and other seven groups.

3, emergency command leading group responsibility: responsible for organizing the development of the unit plan, revision; the formation of emergency rescue team, the organization of the implementation of the plan and exercises; check and supervise the preparation of the emergency rescue accident; the state of the accident in accordance with the emergency rescue plan to implement the rescue.

4, emergency duties

(1) commander-in-chief: responsible for announcing the start and release of the emergency state, the overall command and mobilization of emergency response organizations, deployment of emergency resources, emergency procedures in accordance with the implementation of emergency rescue.

(2) deputy commander-in-chief: assist the commander-in-chief to do a good job of emergency rescue specific command work, if the commander-in-chief is not, by the deputy commander-in-chief fully responsible for emergency rescue work.

(3) fire fighting group: in the event of a major fire or other major emergencies, immediately rushed to the scene of the accident for fire fighting or emergency rescue.

(4) rescue and repair group: emergency situation, fighting fires, equipment maintenance, equipment reset, develop safety measures, supervision and inspection of the implementation of safety measures.

(5) material supply group: responsible for the supply of emergency supplies under emergency conditions, such as equipment spare parts, tools, sandbags, shovels, firefighting foam, cement, protective gear.

(6) Transportation group: responsible for the protection of transportation vehicles.

(7) security alert evacuation group: responsible for arranging security alert, to ensure that the scene is in order; traffic control, to ensure that the site of the road is smooth; strengthen the security work, prohibit unrelated personnel, vehicle traffic; emergency evacuation.

(8) medical rescue group: responsible for contacting medical institutions; organization of ambulance vehicles and medical personnel, equipment into the designated location; organization of the scene to rescue the injured.

(9) communication and coordination group: responsible for emergency rescue process of communication, to ensure smooth communication, responsible for the coordination of the coordination between the groups and with external agencies, coordination.

Third, the start of the emergency plan

When the company's boiler accident, start the boiler accident emergency procedures.

Fourth, emergency procedures

(a) alarm

(b) the formation of rescue teams

Emergency leading group members were notified, and immediately organized the group's staff and rescue equipment, and then rushed to the scene of the accident, to the scene of the general director reported to accept the task of the site, to understand the scene of the disaster. The implementation of unified rescue work.

(C) the establishment of a temporary command and emergency medical point

1, the rescue team into the accident scene, choose favorable terrain to set up on-site command and medical emergency station.

2, the rescue team as close as possible to the site command, at any time to maintain contact with the command.

3, the command, the rescue team, the medical team should be set up conspicuous signs, hanging flags, easy to rescue personnel and the injured to identify.

(D) rescue rescue

into the scene of the rescue teams should be as soon as possible in accordance with their respective duties and tasks to carry out rescue work.

1, on-site command: open the communication network as soon as possible; quickly identify the cause of the accident and the degree of harm, the development of rescue programs; according to the severity of the accident, decision-making on whether the need for external assistance; organization and command of rescue operations.

2, the source of fire control

firefighters wearing fire suits to fight the fire, if the fire is too large, the fire point will be divided into pieces to fight the fire.

(E) on-site vigilance

Alert evacuation group according to the delineation of the hazardous area of the scene to do a good job of vigilance, in the main arteries leading to the scene of the accident to implement traffic control. Set warning signs at the border of the alert area, prohibit other people and vehicles close.

(F) on-site medical emergency

1, medical ambulance group in the initial stage of the accident should be with the hospital, explain the accident and casualties, ready for emergency ambulance.

2, the medical rescue team must be the first time on the scene of the injured to deal with first aid, first aid according to the principle of heavy first light treatment.

3, after the scene treatment, quickly escorted to the hospital for treatment.

4, sent to the hospital to make a good handover of the injured, to prevent multiple transfers of critically ill patients.

(VII) evacuation

1, set up a safe area in advance.

2, alert evacuation group organization and command to guide the contaminated area to evacuate the scene of the accident.

Boiler Emergency Plan 3

I. Fire alarm:

1. No matter when and where within the building, once the building staff found the fire, it is their responsibility to immediately report to the fire control room.

2. In the building met fire, such as the first small fire, should be near the use of lightweight fire extinguishers to extinguish the fire, protect the scene, the situation will be reported to the Security Department. If the fire is serious, you should immediately press the manual alarm device on the wall to alarm, or use the internal telephone to alarm.

3. telephone alarm, do not panic, be calm and cool, clear language will be the fire occurred in the area, burning material, fire big filial piety with or without casualties, the name of the alarm, the department, the location of the report of the fire control room.

4. Close the fire near the 'power, gas switch and doors and windows.

5. Do not shout "fire", so as not to cause unnecessary confusion, to remain calm, only authorized by the fire chief commander to "119" alarm.

Second, the fire confirmed:

1. Central control room received an alarm call to record in detail the name of the alarm, the department and the exact location of the fire and the burning material, the fire is big filial piety with or without casualties.

2. Central control room received a telephone alarm or fire mainframe fire alarm, immediately notify the police on standby to the scene to confirm, check the following issues:

(1) the exact location of the fire, burning material, fire Daxiao there are no casualties.

(2) What is the source of the fire, that is, electrical fire or other causes.

(3) to confirm the fire should pay attention to, shall not open the door recklessly, to try the temperature of the door, if normal can open the door to check, such as the door temperature is high, can be confirmed that there is a fire within the room at this time, such as people, should be set up first method to save, open the door to pay attention to the body is not directly to the open door, depending on the situation to enter.

(4) After confirming the fire, immediately feedback information to the central control room.

Third, the fire report:

1. After the fire confirmed the center control room watchman immediately (normal working hours) to the manager of the security department and the fire supervisor report (night, holidays) to the duty manager report, while the security dormitory alarm signal.

2. Alert the switchboard duty officer (normal working hours).

3. The switchboard duty officer will notify the Director of the Property Management Center and the department managers immediately after receiving the alarm.

Four, all levels of personnel action:

1. building management center director received the alarm immediately rushed to the control room to set up a fire command, commanding the fire and rescue evacuation operations.

2. After receiving the alarm, the manager on duty during non-regular working hours immediately rushed to the fire scene to direct the fire-fighting action.

3. security department manager received the alarm immediately rushed to the central control room, to assist the director of the property management center to command the fire and rescue evacuation operations.

4. property management center administrative office manager, customer service manager, engineering manager received the alarm, notify the department of each position to hold their posts ready for evacuation, immediately rushed to the central control room to form the fire command.

5. security department fire supervisor received the alarm immediately rushed to the fire scene, directing the volunteer fire department to implement fire rescue operations. Security Department of internal security supervisor received the alarm immediately rushed to the main entrance of the building, adjusting the deployment of police forces to maintain the main entrance and the periphery of the order.

6. the police captain received the alarm immediately led by the backup police formed a volunteer fire department, rushed to the scene of the fire under the command of the fire chief to carry out fire fighting and rescue operations

7. the other departments of the post after receiving the alarm to hold on to their positions, according to the order of the fire command action.

V. Fire fighting tactics:

1. Security Department fire chief rushed to the fire immediately after the organization of the scene to extinguish the fire, and at any time with the fire-fighting command to contact the fire-fighting director to report to the chief fire-fighting commander.

2. Cooling method of extinguishing the fire; volunteer firefighters rushed to the fire, immediately use the fire hydrant to extinguish the fire, clean up the fire scene in a timely manner of flammable materials, use the fire hydrant to wet the surrounding buildings, reduce the temperature of the fire scene.

3. Isolation of fire extinguishing methods: isolate the flammable materials from the fire source.

4. Asphyxiation method: close the doors and windows, and use refractory materials to cover a small area of the fire source.

5. Suppression of fire extinguishing methods: use abc dry powder fire extinguisher or carbon dioxide fire extinguisher to extinguish the fire source.

Six, fire extinguishing command:

The chief commander of the fire extinguishing according to the fire scene situation at the right time to give the following orders:

1. Start fire pumps, spray pumps, and with the fire extinguishing.

2. Open the smoke and fire damper to start the smoke exhaust fan to remove smoke from the fire.

3. Close the central air conditioning, and fresh air system to prevent the fire from spreading.

4. Cut off the power supply to the fire area and lower the elevator to the first floor.

5. Turn on the positive-pressure blowers to deliver fresh air to the fire evacuation stairs.

6. Order the Engineering Department to turn off the gas main switch.

7. Give the order to call the police to 119.

8. Give the order to evacuate.

VII. Organization of evacuation:

1. If the person in charge of fire fighting on the scene believes that the fire can not be controlled, the command immediately make the decision to evacuate.

2. fire control room open fire area and the upper and lower levels of the fire broadcast, with the radio repeatedly broadcast "emergency evacuation notice", the broadcast is as follows: customers and friends, please note that the building xx layer of fire accidents, firefighters are fighting, for your safety, please quickly leave the room, before evacuation, please keep your belongings, evacuation, please keep your belongings. Their belongings, evacuation, please do not take the elevator to avoid danger, please take the fire evacuation channel according to the direction of the evacuation instructions, thank you for your cooperation.

3. After the emergency evacuation of the fire area and the upper and lower floors, the evacuation of other floors will be broadcast according to the departure of the people.

4. Customer Service Department received the evacuation order immediately after the organization of personnel responsible for the safety of customers on all floors of the evacuation work, guiding the evacuees to take the fire evacuation channel. Remind the evacuees to remain calm, do not panic, do not take the elevator. Prompt evacuees to evacuate to the periphery of the building. After the evacuation of the personnel, check each room on whether there are people, confirm that no one labeled, if the personnel did not leave the room, to promptly persuade them to quickly leave the room.

5. Other departments receive evacuation orders immediately after the transfer of important materials, documents.

6. Internal security supervisor received the evacuation order to direct the peripheral police officers to clear the motorway, ready to guide the fire engines into the scene.

Eight, post-processing:

When the chief fire commander issued a fire exclusion order, the security department immediately do the fire scene guard work, protect the fire scene is not destroyed, to ensure that the investigation of the fire accident, the Ministry of Engineering as soon as possible will be the fire alarm system, automatic fire extinguishing system, the fire linkage system to return to normal, the Ministry of Customer Service is responsible for the fire The Guest Services Department is responsible for the cleanup work in the later stage.

Boiler Emergency Response Plan 4

1 General

In order to deal with boiler fuel system fire accidents in a timely, effective and rapid manner, to avoid or reduce the boiler fuel system fire accidents caused by the major economic losses and political impact, to avoid and mitigate the boiler fuel system fire accidents on the unit of the major equipment damage that may be caused by the accident. Combined with the characteristics of the work of the power generation department to develop this plan.

2 Overview

2.1 Overview of the boiler fuel system

The boiler fuel system is one of the main working systems of the power plant, which plays a considerable role in the startup of the boiler, stopping the furnace as well as the pulverizing system to ensure the stable operation of the unit in the event of a failure, and the boiler fuel system is made of fuel tanks through the pipeline to the front of each furnace burner. The fuel system of the boiler is made of fuel oil tank through the pipeline to the burner of each furnace, and then high pressure oil pipe to the oil gun, when the need to throw oil, open the relevant oil pipeline and steam pipeline valves can be. The system is fueled by light diesel oil.

2.2 Fuel system fire accident triggered by the following factors:

2.2.1 Oil pipeline leakage, and in the vicinity of the use of welding, welding operations, sparks flying, resulting in oil pipeline fire;

2.2.2 Powder system fire or cable fire leading to oil pipeline fire;

2.3 Diesel oil is a volatile, flammable and explosive substances, the operation of which is not possible in the process of pipeline and valve leakage. In the operation process, if the pipeline and valve leakage, oil and gas concentration is too high or pressure is too high, the temperature is too high to reach the explosion limit, and static electricity or open flame will explode, the explosion power is huge, the light is to endanger the explosion of the equipment itself and the staff on duty, the heavy is to cause a serious fire spilling over to the other equipment and the surrounding population, and cause serious environmental pollution.

3 emergency plan content

3.1 Emergency command organization and its responsibilities

3.1.1 Emergency Rescue Command

Leader: Director of Power Generation

Deputy Leader: Deputy Director of Power Generation

Standing Deputy Leader: Duty Leader Group Leader, Duty Leader

3.1.1 Emergency Rescue Command

The first step is the creation of an emergency rescue system.

3.1.2 Responsibilities of the emergency command organization:

a. After the boiler fuel system fire accident, according to the accident situation, immediately in accordance with the procedures set out in this plan, the organization of the unit's forces rushed to the scene of the accident to deal with the loss to a minimum, and quickly restore the fuel system operation and will be connected to the grid operation of the unit;

b. Responsible for the company's leadership report on the accident and the progress of the accident treatment. accident processing progress;

c. After the boiler fuel system fire accident, should immediately according to the division of responsibilities, rushed to the scene to organize the accident processing, first of all, in accordance with the principle of protection of the person, protection of the power grid, protection of equipment, to ensure the safety of shutdown, to avoid significant damage to the equipment accident;

d. During the accident processing, the requirements of all posts to do their duty, the contact channels should be clear and smooth, the contact The terminology is standardized, and the record of the situation is done carefully;

e. The phenomenon of the accident, equipment damage and accident processing must be recorded clearly, waiting for inspection;

f. Termination of the accident emergency response: all the out-of-operation units are restored to normal operation for the termination of emergency response for the boiler fuel system fire accident of the whole company;

g. Organize and provide the personnel, equipment and equipment needed for the recovery of the accident;

h. The company will continue to provide the necessary services for the recovery of the boiler fuel system fire accident. g. Provide personnel and spare parts required for accident recovery, organize production vehicles necessary for accident recovery, and organize the implementation of temporary measures required for accident recovery;

h. Complete the preparation and reporting of the investigation report on the boiler fuel system fire accident (the cause of the accident, treatment, equipment damage and economic loss).

i. The competent authority of this plan, the Department of Safety and Health.

j. The revision date of this plan is two years.

3.1.3 Emergency Communication

Phone number of General Commander:

Phone number of Deputy General Commander:

Phone number of Daily Management Office:

Fire alarm inside the plant:119

Outpatient clinic of New Downtown People's Hospital:

Emergency clinic of New Downtown People's Hospital:

Alarm on duty inside the plant:

Alarm on duty inside the plant:

Alarm on duty inside the plant:

Alarm on duty inside the plant:

Alarm on duty inside the plant:

3.2 Prevention of Critical Events

3.2.1 Operators must strictly abide by the duty discipline, monitor the concentration of thought, often analyze the changes in the operating parameters, adjustments in a timely manner, and accurately judge and deal with accidents, and constantly strengthen the training of operators to improve their ability to judge accidents and operating skills;

3.2.2 In the boiler design, the oil burner must be Equipped with regulator and flame stabilizer, to ensure that the root of the oil gun combustion of the required amount of oxygen, the newly installed oil gun, should be put into operation before the cold test;

3.2.3 boiler combustion of residual oil or heavy oil should be to ensure that the fuel oil temperature and oil pressure in the specified values to ensure that the oil gun atomization is good, combustion is complete. Boiler ignition should strictly monitor the oil gun atomization, once found that the oil gun atomization is not good, it should be immediately discontinued and cleaned maintenance;

3.2.4 If the boiler is a longer period of time low load fuel oil or kerosene mixing, according to the specific circumstances of the use of shutdown of the air preheater heated surface inspection, focusing on the inspection of the heat transfer components, if found to be scaling to alkaline cleaning.

3.3 Emergency plan start

3.3.1 The accident occurred by the duty chief immediately reported to the director of the power generation department, by the director of the power generation department in accordance with the situation of the issuance of an order to start the implementation of this emergency plan, the director of the power generation department issued the order to start the emergency plan, the operating personnel should be immediately in the operation of the scope of the emergency to start the plan, in position, the organization of the accident's emergency treatment;

3.3.2 Communication contact according to the company's online latest telephone directory implementation, in the event of an accident, the communications emergency team to ensure that the scheduling phone smooth, to ensure that the head of the post of the duty direct dialing phone smooth.

3.4 Response to Critical Incidents

3.4.1 In the process of accident handling, the accident handler should be calm and cool to ensure personal safety as the first principle;

3.4.2 Correct and rapid treatment to prevent the accident from expanding, and timely and detailed report to the competent leadership of the accident;

3.4.3 In the process of accident rescue, the commanding officer should know in detail the condition of the accident site. Personnel should understand the accident scene conditions in detail, orderly command, the staff should be the correct use of safety equipment, clothing should meet the requirements of safety regulations, and do a good job of their own protection;

3.4.4 on-duty personnel to ensure personal safety, quickly carry out self-help work, to take effective isolation measures, will be the tank supply and return throttle closed in time, to prevent the expansion of the situation;

3.4.5 The main watchman of the auxiliary network should immediately stop the operation of the oil supply pump, and contact the watchman to de-energize the fuel system and close the supply and return throttles in front of the 2 furnaces;

3.4.6 The operation emergency team should immediately carry out the rescue work on the injured;

3.4.7 Strictly carry out the requirements of the safe working procedures and this plan in the process of the emergency rescue, to prevent the occurrence of personal injury and death;

3.4.8 Protect the scene of the accident, prohibit the entry of unrelated personnel, and to ensure that all safe channels are open;

3.4.9 Timely dialing the fire alarm telephone "119", to the police officer to clarify the unit, the fire part, what items on fire, the size of the fire alarm with the telephone number and the name of the alarm;

3.4.10 Firefighting and rescue in the process of emergency rescue should be strictly enforced safety procedures and the requirements of this plan to prevent personal injury or death;


3.4.10 Firefighters arrive at the scene of the fire, to the firefighters to clarify the situation and precautions, and to assist the firefighters to extinguish the fire;

3.4.11 When the fire at the scene of the accident is a serious threat to the safety of the emergency response team, should be in the chief of the command to evacuate the scene of the accident in an orderly manner to reach the safe area;

3.5 Maintenance or restoration of life and production programs<

3.5.1 After the boiler fuel system fire accident, in the case of personal safety is not endangered to hold on to their posts, so that the production is normal;

3.5.2 according to the actual situation to resume production work, prevent damage to equipment, and pay attention to the safety of the operation;

3.5.3 security emergency team should arrange manpower, do a good job of safety and security work, fire emergency team should be ready at any time. security work, fire emergency team should be ready to rescue work;

3.5.4 According to the scene recovery, the director of the power generation department to announce the termination of the accident emergency treatment situation, the production order to return to normal.

Boiler Emergency Plan 5

I. Problems and hazards of the fuel system

Xuzhou Power Plant fuel system has been put into use for fifteen, six years, some oil pipeline corrosion is serious, valves, flanges, joints easy to leakage points are more, in the event of fuel system oil run. On the one hand, it is easy to cause a fire, explosion, endangering personal safety: on the other hand, fuel oil seepage into the gutter caused by water pollution, and cause waste, reduce efficiency. Seriously, it will lead to the casting of oil can not be ignited, and even cause the boiler fire, especially when the fire treatment, can not be cast in a timely manner with the oil gun, will delay the processing time, triggering and expanding the accident, and even cause the accident of the shutdown.

Second, the phenomenon of oil pipe leakage

1, fuel pipe burst when the fuel pressure is rapidly reduced, the burst at a large number of fuel spray.

2, cast oil fuel boiler combustion instability, and even lead to fire.

3, burst in case of open fire or high-temperature pipeline, the fuel spray will cause a fire.

Third, the emergency plan and response measures

1, the emergency plan

(1) Fuel piping, especially elbows or corrosion-prone parts should be inspected regularly.

(2) Valves are regularly overhauled and pressurized, cast iron valves are prohibited, the gaskets on the combined surface should be replaced regularly, and the live joints should be inspected frequently.

(3) oil gun hose should be regularly replaced; timely manual blowing of the oil gun, the end of the blowing, isolation of the fuel system before the furnace and check the system without leakage, stop blowing the steam (gas) source.

(4) boiler company should be fuel system all filters cleaned up once a quarter, the Department of Safety should be included in the quarterly countermeasures program. Supervision and assessment.

(5) After the completion of the overhaul of the oil system, the overhaul personnel should be required to carry out a pressure test on the parts of the overhaul, check that there is no leakage before the end of the work ticket.

(6) before the start of maintenance work, should be strictly implemented in the work of safety measures, long time maintenance, valves or flanges should be installed at the plug plate. Temporary overhaul, the scene should be supervised.

(7) each furnace oil pipeline drain door should be installed plug plate: equipment inspection should be meticulous, timely detection of hidden equipment.

2, response measures

(1) when the fuel pipeline, valve leakage, should immediately cut off the source of oil (if necessary, stop the fuel pump operation, and close the fuel pump outlet valve), and timely elimination of seepage, seepage oil should be cleaned up in a timely manner, and prohibited from being discharged directly into the gutter.

(2) when the furnace oil fuel, the operator should always check the tightness of the fuel system components, leakage found in a timely manner to contact the elimination.

(3) such as fuel pump inlet screen clogging, cooling water interruption, strong vibration, bearing temperature rises sharply above the prescribed value or motor failure, etc., should be immediately switched to the standby pump operation, reported to the main watchman contact maintenance processing.

(4) found that the fuel system serious leakage, should immediately take isolation measures, the scene set up fences and warning signs to prevent fire, and instantly notify the higher leadership, and actively organize the elimination of defects, the fuel system needs to fire should be strictly enforced the fire ticket system: such as the occurrence of fire immediately report to the chief of the duty. Contact the fire department and organize personnel to put out the fire in a timely manner.

(5) such as the boiler fire, fire threat to the safety of people or equipment operation should be immediately dealt with according to the emergency shutdown: such as oil tanks, fuel pumps on fire should immediately stop the fuel pumps, cut off the power supply, and other processing with reference to the fire regulations.

;