NEEDED EQUIPMENT:
1. injection molding machine
2. pumps {pumping water to the machine mold cooling, two then, single-phase can be}
3. cooling towers or water chillers {if the cooling pool is relatively small to buy}
4. crusher {the production of the head of the material under the crushing and recycling}
5. mold temperature machine {products Higher temperature requirements for the mold to buy}
6. Oven {drying materials, it is recommended to buy directly mounted on the machine, drying faster, floor-standing type because there are several materials, at the same time drying, the temperature is not good control.
7. Mixer {materials dress color or join back with}
8. Moulds to be loaded when large gourd, molds on the small to buy a lift cart, molding tool set.