Quality engineering work summary report

Summarizing the work of a period of time is to affirm the achievements, identify problems, summarize the lessons learned, raise awareness, and clarify the direction in order to further improve the work. Here let me take you to see the quality of engineering work summary report sample 5, I hope to help you!

Quality Engineering Summary Report 1

20____ years, I am in the station leadership of the cultivation and guidance, advancing with the times, solid work, and better complete the organization and the station leadership of the delivery of the various tasks, in order to complete the quality of the project tasks, make their own due diligence. Now the year's work is summarized as follows:

First, the daily supervision of the work

This year I participated in the supervision and management of new construction projects ***__, a total area of ________ million square meters; carry-over projects ____, area: ________ million square meters. There are __ projects in the carry-over projects have been accepted, there are __ projects in the new projects, ____ projects are organizing information to prepare for acceptance. Conduct on-site supervision and testing ____ times, the pass rate is 100%, in accordance with the arrangements and deployment of the station leaders, according to the relevant requirements of the station, the strict implementation of the written commitment, permanent signage, information files, such as the "three systems", to increase the daily supervision and random inspection efforts to strengthen the daily supervision of the construction process and guide the services of the problems and hidden dangers found. In accordance with the relevant normative documents, combined with the actual situation, the issuance of rectification notice and stop construction notice, urge the responsible units to take timely and effective measures to eliminate the problem of hidden danger, to ensure that the quality and safety of the project is stable and controllable.

Second, the implementation of the Supervisory Reporting System

"Supervisory Reporting System" at the beginning of the implementation of the station was identified as one of the pilot units of ____, in accordance with the requirements of the notice, in the ____ area of the project under construction in the implementation of the full Supervisory Reporting System. This year, as the contact person of this work, I have summarized some experiences in the process of implementing this system. In order to make the supervision fill in the form more standardized, intuitive and easy to understand, I designed and developed a ____ special form in accordance with the requirements of the system, which has also been recognized by the terminus. Before the introduction of the formal system, at the request of the terminus, to assist in the development of the supervision report "weekly statement", and the draft of the system put forward a number of recommendations adopted by the terminus.

Third, the project quality supervision statistics

In order to be able to complete the project quality objectives, regular analysis of the project quality situation, etc., at any time for the unit to provide accurate data, in the station under the guidance of the leadership of the leadership of the project I did a lot of work in this year, statistics. In the promotion of real estate license processing, produced ____ district has not been accepted, not filed project statistics; in the implementation of the "project quality and safety enhancement action", to the terminus of the quarterly report on the quality of regional engineering statements; in the analysis of the situation of engineering quality, statistics ____ region in the first and second half of the year, as well as the annual quality of the relevant project supervision data Supervision of the situation of basic data, the production of ____ district of many statistical tables.

Fourth, the completion of the financial work

In addition to the daily supervision and management of engineering quality work, I also undertook this year's station cashier work. For financial I did not go through a systematic study, but I did not slacken off, after two years of guidance from the accountant and their own learning, groping, and now familiar with and mastered the relevant business, the successful completion of the 20 ____ annual months of bookkeeping, closing and account processing; workplace insurance, medical insurance, personal tax, provident fund and other items of the declaration and payment; to and from the bank, such as the inter-departmental business and a variety of daily office expenses paid and so on. The company is also responsible for the payment of all daily office expenses.

Quality Engineering Summary Report 2

Time flies, time passes, in this day of resignation and welcome to the new year, looking back on this year's work, I am in the company's leadership and the support and help of my colleagues, with their own professional foundation and work experience, in accordance with the company's unified deployment and requirements, closely around the ____ construction project to Low-consumption, high efficiency, quality, according to the goal of the full implementation of the Ministry of Engineering management functions, in the project management work seriously responsible, innovative, coordinated and cooperative, solid work, do everything possible to ensure that the year's objectives to achieve the set, a better completion of the tasks assigned by the company, the Ministry of Engineering's overall construction has also jumped out of a new level, is now 20 ____ year's work briefly summarized as follows:

A full year of work task, the company's leadership and colleagues to support and help. p> First, the completion of the year's work tasks

At the beginning of the year began to contact the ground source heat pump, for me this is an opportunity is more of a challenge, and it is more important for me to meet such a challenge, for this reason, I use my spare time to collect and more in-depth study of the relevant knowledge of ground source heat pump information, in order to consolidate my professional knowledge to cope with the challenge. Preparatory work was started for the bidding of the piling construction unit and the supervision unit. The measured road elevation did not match, and there was a discrepancy between the four-line map provided by the planning and the actual mapped data of the land, which was later reflected to the design institute, which adjusted the general assessment with the actual measured data. Preparation of supplementary agreement and earth leveling contract for the supervisory unit and piling unit.

Cooperate with ____ to apply for the construction license, in the pre-application, I have a comprehensive understanding of the application work and research, familiar with the key aspects of the policy and regulations. Solve the problem of water and electricity at the construction site. Due to the ____ site leveling work time is tight, the workload is large, so I grasped the arrangements for the site earth leveling of the work, take the stubble operation, interlocking, the overall approach to promote the work, timely do the upper and lower links convergence work, in order to ensure that the piling construction is carried out normally. In the process of pile foundation implementation due to complex geological conditions, the length of pipe pile design does not meet the actual geological requirements, I organize personnel to re-conduct geological survey, overcoming no water, no electricity, no construction temporary setup and other difficulties, to assist the survey unit on time to complete the task of geological survey at the same time, but also to ensure the smooth progress of pile foundation work.

Due to the pit support and earthworks of the tight schedule, heavy task, in addition to daytime, the construction unit to carry out a lot of night construction, in order to ensure the progress of construction, I often in the winter at night, rainy days and other unfavorable natural factors of the conditions to the site to follow up on the construction, tracking around the clock for the construction unit to coordinate and solve the problems encountered at any time, but also for the earthworks project period of the main works to start ahead of schedule to create the conditions for the construction. Conditions. Due to the construction of things involved in the complicated, I have not rested a day since the start of the project, every day have to leave the scene after 9:00 p.m., giving up the opportunity to rest on holidays, and always adhere to the scene in a timely manner to coordinate and solve the construction of a variety of problems encountered.

Second, to strengthen their own learning, improve the level of business

After many years of work experience, I feel that their burden is very heavy, but also y feel the importance of learning, only to continue to maintain and improve the individual's ability to work and learn, in order to have a continuous combat and work innovation. This year, I strive to broaden my personal knowledge, strengthen the real estate profession and related legal knowledge, strengthen the real estate development pulse and direction of understanding, as well as understanding of the surrounding environment, the development of the same industry, a deep understanding of the company's overall planning, the company's various situations to do a good understanding. In the coming year, I will continue to study as an important program of the work, to improve personal practical work ability and professionalism, in order to adapt to the times and the development of the company, for the development of the company to contribute to the power they should have.

Third, grasp ____ project engineering quality

____ project is a key project, so grasp the quality of the project is particularly important. I always implement in the management adhere to the "excavation that is carving" the concept of high-quality engineering, the full implementation of refinement, scientific management, and seriously implement the quality of the measures to create excellence, carefully do a good job in every process, grasp every link, strict supervision, strict control. While assisting the work of the project supervision company, we gradually form our own project quality supervision system. Supervision-based, self-subsidized, and strive to build the ____ project into the ____ project.

Fourth, the completion of ____ project foundation works

In order to successfully complete the main project of ____ project, especially the main construction stage of the basement and waterproofing layer of the construction, taking into account the rainy weather of ____, as well as to improve the utilization of the company's funds, saving the company's resources, such as the use of small wells during the construction of the project such as precipitation Overcome the high water table, the rainy season, construction and other difficult issues to successfully complete the foundation of the high water table, construction and other difficult issues. Construction and other difficult problems to successfully complete the foundation project.

Looking back on the work of this year, although we have achieved certain results, the company's leadership has been recognized, but these achievements can not be separated from the leadership of the company's support and help, can not be separated from the encouragement and assistance of the brother departments, can not be separated from the engineering team's hard work, to summarize the results, I still see a lot of shortcomings, such as enhancing the field management experience, better improve the company's Resource utilization rate and so on. The results of the summary just let me more objective face to the actual work situation, but also more encouraging me and the team members to continue to work hard, in the next year to achieve better results, and the company *** with progress, *** with growth.

Quality Engineering Summary Report 3

Dear Leader:

Hello! First of all, thank you for the company to provide a good working environment, thank you for the leadership encouragement and support. In the work of this department, has been strict requirements for their own, conscientiously do a good job in the leadership of each task assigned, and humbly ask colleagues to learn from professional knowledge, and constantly improve to enrich themselves.

In the production, strictly in accordance with the process of inspection, the first product before the production of checking the sample standard for self-test to ensure that the production in the normal situation. The first piece of product inspection, the first piece of the process to confirm. In the work of inspection tours and production site inspection, in order to timely detection of problems to prevent the emergence of nonconforming products. Carry out process control, whether the quality data fluctuation is reasonable, whether the process is in a stable state, analyze and find the causes of nonconforming products in cooperation with the relevant departments, and take corrective and preventive measures to prevent the occurrence and recurrence of nonconforming products. Participate in the handling of quality abnormalities, and follow up on corrective and preventive measures, and confirm their effects.

Do a good job of supervision in the inspection process, timely detection and correction of problems in the inspection process, and strict control of the higher quality requirements of the process. According to the production situation, we will continue to improve the quality, and further improve the product qualification rate.

Work more carefully, carry forward the advantages, improve the shortcomings of the place, clarify the work of thinking, improve efficiency, with a modest attitude, positive work enthusiasm to do their jobs, create value for the company, and the company colleagues united to create a better future.

Quality Engineering Summary Report 4

____ The project has lasted more than a year since its official start. In this more than a year, ____ project department always adhere to the "implementation of comprehensive management, enhance the implementation of" as the core concept of project management and carry out the work of the guiding ideology. We carefully study and implement the provisions of the company's management system, based on the characteristics of the project, combined with the owner's quality requirements, elaborate design, integrated planning, establishment and improvement of the project's internal quality management system and related procedural documents. Clearly defined job responsibilities and basic work ideas for the smooth and orderly development of the construction of housing projects has laid the foundation. Now on this year's quality management work is summarized below.

First, the project's internal quality system and the implementation of quality responsibility system

Combined with the actual situation of the project and the characteristics of the project,____ the project department established a project manager as the core of the quality assurance system, the implementation of the project manager under the leadership of the quality management of the system of responsibility. To do all departments, each team, each position of the work function and responsibility is clear, the competent elements are clear, the professional interface is close, the quality management of each department is coordinated, the quality management information channel is smooth, to ensure the efficient and orderly operation of the project's internal quality system.

The project leadership team also analyzed the project structure and quality control work with members of the project department to analyze the project structure and quality control work of the key difficulties, and the weakness of the previous project quality management work, serious planning, careful deployment, to achieve key control of key parts, the main processes are responsible for the quality of the person responsible for the management and control of the construction of ____ building, the project from the new determination of the responsibility of the person, to truly realize the responsibility to the post, the responsibility to the person, the responsibility to the person. Duties to the post, duties to the person, duties to the process. In accordance with the requirements of the company's management system, identify the laws and regulations involved in engineering construction and the standards and specifications to be adopted to ensure their effectiveness and practicality. Effective implementation of continuous improvement, and constantly improve the quality management system of the project department, so that it can better guide the work of the project department to ensure the smooth realization of the project to develop the quality objectives, quality and efficient completion of the construction tasks.

Second, the quality management procedures and systems for the preparation and implementation

According to the requirements of the company's system documents and project control focus on the difficult, targeted preparation of special work procedures and implementation of the program. For the current change of construction process, ____ project has newly revised many quality management systems and sub-construction programs, such as document preparation regulations, project quality plan, project measuring instruments and equipment management regulations, project quality inspection plan, project defective products handling regulations, quality awards and penalties, etc. The technical delivery system is strictly implemented. Strictly implement the technical delivery system, effectively do not construction without delivery, before the start of each job to all participate in the main sub-projects and processes of construction and management personnel to carry out detailed technical delivery, clear construction procedures, processes, operation points, quality requirements and safety precautions.

According to determine the inspection, test object, the way, according to the requirements of the selection to meet the accuracy requirements of a variety of inspection, measurement and testing equipment. Project use of all measuring and metrological instruments and equipment before entering the field, be sure to follow the project measuring instruments and equipment management regulations, check the measuring instruments and equipment is intact, whether it has a qualified verification report and identification of the results in the validity of the measurement certificate or more than the validity period of the measuring instruments, prohibited for use in the quality of the project related to the inspection and testing. Qualified measuring instruments and equipment to enter the site for registration, the establishment of measurement accounts.

In advance of the development of measuring instruments and equipment inspection plan, and timely recovery of measuring instruments and equipment in use is about to expire, to prevent the use of unqualified measuring instruments and equipment to affect the quality of the project, and even cause rework. The establishment of an effective incentive mechanism to stimulate the enthusiasm of the majority of workers. The project department compiled the quality work award and punishment rules, and weekly/monthly cycle for assessment and selection, on the project quality management work in the outstanding performance and engineering entity quality of the masses and individuals for notification of praise and material rewards.

Third, quality education and training

The project department since the beginning of this year, the organization of two ____ labor competition activities, two system internal audit, a system external audit. Owners, higher competent units and development zone leaders have been to my project department for many times to carry out special inspection activities, it can be said that a variety of inspection work throughout the entire construction process of the ____ project. Numerous inspections and quality activities to the project quality management team put forward a higher and more serious challenges, but also brought the opportunity to exercise the team and platform. The project department took this as an opportunity to do a lot of heartfelt and effective quality publicity work, and strengthened the quality awareness of all levels of management and all construction personnel.

The project department for the spirit of the activities, carried out the corresponding quality culture, professional and technical knowledge of special education and learning. In the actual work, pay attention to carry forward the "pass, help, take" the spirit of mutual assistance, to create a "catch up, help, super" competitive atmosphere, cultivate a good learning atmosphere. Organize professional and technical proficiency, experienced workers in the conference room to other construction personnel to lecture, share their own work experience. We speak widely, *** with the discussion of the construction process quality problems, summarize the experience of improving the level of personal technology skills, complement each other's strengths, *** with the improvement.

In the education and training and daily work, and every master worker to make friends, so that the young technical cadres in the quality of education and training in the actual education, improve, and receive the effect, so that every employee of the Ministry of the project to establish "my quality, my responsibility, my commitment" and "the pursuit of never-ending, product quality" and "the pursuit of never-ending, product quality. "The pursuit of never-ending, the product represents the human character" concept, promote the majority of workers from "I want to learn", "I want to advanced" to "I want to learn ", "I strive for advanced" change of mind, greatly improving their professional and technical level and product quality awareness. The project department always adhere to each outstanding workers as a branch of the valuable resources and wealth, set up a good example of staff, for the future control and improve the quality of construction has laid a solid foundation.

Fourth, the construction phase of quality control

Project quality management work adhere to the "weekly plan control, monthly plan mandatory" site management system. Quality departments should be coordinated, *** with the analysis of the quality control focus of the sub-projects and construction difficulties, the detailed development of practical solutions, the development of detailed measures. The establishment of a number of communication platforms such as pre-shift meeting, technical briefing and special meetings, strengthen the construction process quality inspection and acceptance, strengthen communication, to ensure the smooth flow of quality information channels in the project department, thus ensuring the quality of construction.

The organization of the professional and technical leaders and team leaders, widely carried out "comprehensive inspection, special treatment, one by one exclusion" of the comprehensive inspection, and will be included in the project quality management system, normalized. Combined with the inspection status, the development of corrective and preventive measures, and write a written circular, the implementation of the model to lead the way, praise the advanced, spurring the latter. Obedience to construction units, supervision units, design units, quality inspection station inspection, guidance and supervision of the work, a modest understanding of their recommendations, and heart and construction units, supervision units to do a good job with the work.

The project quality control focus, difficulties and check out the project work weaknesses in the list, as the weekly quality work theme. Concentrate on the quality control key points, difficulties and weak links one by one to track and check the cycle of quality main week. Each profession establishes a perfect on-site inspection database, analyzes the on-site quality data, summarizes this week's quality rectification status, and formulates the next week's quality work plan. Engineering technology and quality personnel follow the work and solve the technical problems in construction at any time. Quality inspectors have the right to veto quality, found contrary to the construction procedures, the use of unqualified materials, quality inspectors have the right to stop, found that the problem was immediately reported to the competent leadership, and quickly put forward a solution to nip quality problems in the bud.

Fifth, do a good job of acceptance of the completion of the project

At present, the date of handover from next year has been very close to ____ relocation of housing is a relatively special project, next year, in addition to handover after the need for construction, supervision units acceptance, but also need to be through the acceptance of the tenants that is, the owners of the small owners in order to ensure that next year's successful completion of the acceptance of the work on the site quality inspection and acceptance of work to be Strictly in accordance with the quality inspection plan approved by the units for control. Each sub-project must be in accordance with the quality inspection plan to determine the inspection level and control point requirements, one by one for closure. Before the acceptance of the project, organize the relevant departments and personnel within the project to carry out pre-acceptance, make a list of the problems checked, and each must be responsible for the duties, personnel, measures, and rectification time, and follow up and check the rectification results. Through the above measures in the construction and the completion of the acceptance of the project before the self-inspection measures to ensure the smooth acceptance of the completion of the project.

In the past year, through the project department of all members of the *** with the efforts of the ____ project department successfully through the various inspections and reviews, the quality of work by the owners, supervisors and all parties involved in the unanimous praise. We believe that as long as the quality management personnel at all levels of the project department make concerted efforts, the top and bottom of the heart, we must be able to complete the project in the quality of work, and constantly improve the level of quality management, the successful completion of the project construction tasks and the quality of the objectives.

Quality Engineering Summary Report 5

A year's work is coming to an end, in this year's overall construction of the project, I y realize the importance of teamwork, some of their own shortcomings, the team's rapport, and so on, are the key factors affecting the smooth progress of the project. To this end, the quality of this year's work is summarized as follows:

First, the progress of the schedule

The project in the pre-construction period, in the company's concerted efforts, the overall operation of the good, the project from the safety, quality, progress and so on the various aspects of the good trend, but the processing of raw materials is a good or bad is an important part of the process of the materials into the field for this reason, the material audit acceptance Relationship to the project safety, progress and other major aspects.

In the basic construction, the weather and other irresistible factors, is the biggest stumbling block affecting the smooth completion of the overall project, the site manager should be based on the actual situation on the site, the A party, the weather and other factors to make the appropriate adjustments to rationalize the construction schedule, the preparation of effective progress to catch up with the system measures. Here, I also y realize their own shortcomings, in the face of rainy weather can not reasonably organize and arrange workers to do a good job in the late progress of the project preparatory work, accordingly, in the conditions allowed to cause the corresponding extension of the construction period, the project progress to step up, the corresponding sudden rush to catch up with the schedule is also the inadequacy of my own management experience, can not be reasonable and effective deployment of workers to fully implement the work in the future there are a lot of places to learn to be long. Need to learn to be long.

Second, engineering construction safety

Site construction to be able to truly realize that production safety is the premise and protection of enterprises and individuals casting too fine. To be able to recognize the "people-oriented, safety first" social attitude, to be able to do the investment in safety facilities, safety education, prevention-oriented importance and necessity. In the pre-construction phase of the project, do a good job of worker safety education, sign the appropriate labor contract, safety briefing, always keep in mind the safety awareness.

____ reserved warehouse project midway through the construction process of workers construction fall, as the site responsible for me have an unshirkable responsibility, in the company's leadership up and down the efforts of the appropriate emergency measures for the injured in a timely and effective fight to the most valuable rescue time, so that the workers' final health recovery to provide a strong guarantee, for which I have also y reflect on their own, bearing in mind the Fault, in the future construction site safety management, always do a good job "three treasure, four mouth, five edge", civilized construction site, the workers' safety education, checking for hidden safety hazards as the focus of the work, and to develop a specific safety implementation programs and measures for the smooth progress of the project escort.

Third, the quality of engineering construction

Summary of the work of a hundred years, quality-oriented. ____ project, with has been completed, but still left a lot of thorny issues, such as: roof panels, sun tiles, water leakage at the lap, wall window leakage, etc., really to the production of the A party has caused a certain impact, but also for the company has caused unnecessary losses, for which I feel guilty, and has been trying to repair. I think that in the process of construction of the project always monitor its construction procedures, to avoid paralysis of the workers, to sign a technical briefing with the operating team, if necessary, signed a quality agreement, and the development of the corresponding quality inspection cycle, the quality defects found in the construction process in the construction of the implementation of the solution to the quality problems in the quality of the inspection of the dynamic management of the real thing. Strictly in accordance with national norms, standards and sub-household acceptance standards construction, the quality of the implementation.

Fourth, cost control and project prepayment

The construction of the early stage of the preparation of a detailed construction budget and the amount of materials used in the plan, in the construction process according to changes in site conditions, design changes, negotiation and other factors of change and gradually be improved. Each construction team with the task list to receive materials, materials in and out of the warehouse has a detailed record. Under the condition of ensuring normal supply of materials, waste is eliminated. Adoption of new technology, reduce the amount of labor, improve efficiency to increase efficiency.

With ____ company signed a construction contract in the construction of the advance payment terms, the construction unit there are delinquencies and delays, which makes the smooth progress of the project has been affected to a certain extent, in view of the problem of the site managers to do a good job of the project under the premise of the work, cut the time to do a good job of communication with the party to ensure that the payment of funds to ensure that the company to do a good job of the most practical and powerful back-up guarantee. Signed labor contracts with the operating teams, we have never been in arrears in accordance with the contract, with the occasional delay, the scene also try to do a good job of appeasement, to ensure that the last so that the migrant workers to work safely and securely, and go home happily.

Looking back at this year's work, there is growth and shortcomings, sober analysis of their own work deficiencies and strengths, recognize the gaps, accept the experience, learn the lessons in the future work to build on the strengths and avoid the shortcomings of the construction methods to improve and improve the work, which is the future work of the valuable assets. In the future, gradually improve their own views and awareness, and constantly improve the professional quality and level, strengthen the sense of responsibility, cultivate the spirit of love and dedication, people-oriented, strengthen management, and enhance the spirit of teamwork.

Quality Engineering Summary Report Related articles :

★ Quality Department Summary Report Sample Selected 5

★ 2016 Quality Engineer Work Summary Sample

★ Quality Department Year-end Summary Report Selected 5

★ Quality Supervisor Individual Work Summary Report

★ 2020 quality department year-end work summary sample

★ 2020 company quality department year-end work summary selected 5

★ quality supervisor year-end work summary selected 5

★ QC engineering work summary sample five 2020

★ quality supervisor half a year work summary report

★ engineering quality The work of the management summarizes the report