The acceptance of instruments and equipment is the first step to ensure the quality of hospital medical instruments and equipment. Acceptance of the program is organized, complete relationship between the acceptance results are qualified. This article is my instrument and equipment acceptance report template for you to organize, just for reference.
Instrument and equipment acceptance report template a
Equipment name ______________________
Specification, model number ______________________
Use of units _______________________
The person in charge of the acceptance _______________________
Year month day
Acceptance report
_____________ purchased on ____ ____ ____ ____ ____ ______________ the ____________ instrument (or equipment) with a value of _________ and a contract number of __________.
The equipment arrived at ____ on ____ ____. By the supplier ______ to the school installation and commissioning. Various indicators, have reached the contract requirements, running so far, the equipment is all normal, good performance, acceptance. Hereby.
Ordering unit (seal) Acceptance:
Year month
Instrumentation Acceptance Report Template Part II
Equipment Funding:
Contract Amount:
Supplier:
A. Physical list and technical specifications
ii. Acceptance record
After installation and commissioning, the detailed acceptance record for testing and experimenting the equipment is as follows: ? Acceptance record of equipment A
1, operation steps and methods
2, operation results
? Equipment B acceptance record
1, operation steps and methods
2, operation results
......
(Each type of equipment should be given a separate acceptance record)
III. Acceptance conclusion:
Through the above tests and experiments to prove that the number of ____ and other equipment is consistent with the contract, and good performance, normal operation, the technical indicators meet the standards, in line with the relevant experimental requirements, acceptance qualified.
IV. Signature of the acceptor? Acceptance of time
Year month
Instrumentation Acceptance Report Template Part III
Project Name:
Contract No.
Acceptance Report
Contractor: Use Unit: Date:
Equipment Acceptance Report
User Unit: _____________
Supply unit: ___________
Acceptance date:
Acceptance place:
I. Equipment content:
II. Acceptance:
User unit (signature)
seal:
Supply unit (signature)
Seal:
Members of the acceptance group:
Members of the acceptance group:
Date of acceptance: month, year
Date of acceptance: month, year (with a list of the components of the equipment)
Attachment I:
List of components of the equipment
Acceptance of Instrument and Equipment Report Template 3 Model Article Related Article :
★ Instrument and Equipment Acceptance Report Template 3 Sample Articles
★ Instrument and Equipment Acceptance Report Sample Articles
★ 2020 Architectural Engineer's Annual Summary