Six months, in the care and support of leaders at all levels, through the comrades of the Section **** with efforts to successfully complete the work plan scheduled at the beginning of the year, and achieved good economic and social benefits.
I. Strengthen the prevention and control of cholera, the CDC held a special intestinal clinic diarrhea patient testing work conference, the examination of cholera pathogenic bacteria to implement the delivery system, including sea (water) products and other food samples 105, 7 cases of cholera isolates detected (non-01/non-0139 group), 60 samples of the body of water, 5 cases of cholera isolates detected (all non-01/non-0139 group), 62 patients with diarrhea, did not Cholera pathogenic bacteria were detected.
II. Iodine deficiency disease prevention and control work, iodized salt monitoring 300 copies.
iii. Do a good job of emergency sampling and testing of public **** health emergencies, prepared for emergency sampling kit, which is equipped with common food poisoning, water treatment, diarrhea disease, respiratory and intestinal infectious diseases, such as sampling supplies and on-site rapid detection with reagents.
IV. Strengthen food and drinking water hygiene testing, protection of people's health, the food service industry and public **** place practitioners for health check-ups, as of June 20, 20xx **** physical examination of 3310 people, testing of various types of food, water quality and other samples of 105, public **** place (air, public **** utensils) 171, eating utensils 1224 copies.
V. Strengthen the protection of occupational diseases, benzene exposure to workers in the jurisdiction of occupational disease physical examination, **** physical examination of 4492 copies, workshop air monitoring 570 copies.
VI. Strengthen the rat defense monitoring work, serum sample monitoring 107, 52 liver and spleen, the results are negative.
VII. Strengthen business learning, and constantly improve the laboratory testing level, and actively participate in the provincial disease control system organized by the laboratory proficiency testing activities, including anti-HIV antibody, iodized salt and plague serum antigen antibody test are excellent grade.
Summary of the first half of the test 2This year is an important turning point in my life journey. Leaving school to society is the starting point of a new life for me, a new beginning and a new goal. The company gave me a real theory and practice opportunities. During the time I work colleagues are very caring to me, always give me encouragement and help. After several months of quality control work, I summarize as follows:
First, the work gained. In the past few months, as a quality inspector, to seriously study and learn the company's set of quality control system, according to the requirements of the job responsibilities, the main gains are as follows:
1, physical samples of the storage of physical samples I strictly in accordance with the requirements of the company's physical samples of the storage of physical samples, so that no leakage, not less than the take as well as a variety of profiles of the reasonable storage.
2, sample testing and inspection work is a fine testing process, the so-called "details determine success or failure". In the inspection work to always maintain a rigorous working attitude, serious and prudent in every step of the test. Now I have mastered most of the material samples testing methods. This is very grateful to take my teachers and colleagues, it is you who taught me these.
3, data processing quality testing data recording is also very important. I want to seriously and pragmatically record the measurement data of each experiment, summarize and report on the test data, so that there is no misreporting, no misreporting.
Second, work thoughts and experiences.
1, attitude determines everything. The work must be meticulous and serious. Can not always be wrong, when necessary, you need to test their own work to determine their own work to do foolproof. Spare time, often to review the work, correct the shortcomings of the work, improve the working methods, study hard, and constantly improve their own efficiency, from the lessons learned in the summary of the experience gained. Encountered errors in the work, to listen to the criticism of the leadership, do not think that mistakes are a shameful thing, should be considered a mistake is an opportunity to grow and exercise.
2, think hard about the daily work, although busy and tedious, a week of boring work down, the weekend break in the mind can not be very lax, in the spare time should be diligent thinking, thinking about ways to improve the quality of their own work, thinking about how to improve efficiency, how to reduce the work time.
3, continuous learning to enrich their own ` professional knowledge and professional skills, so that the work of their hands more and more easy. A person to make a difference in his position, it is necessary to continue to learn specialized knowledge, broaden their knowledge frontier. My initial entry into the company, like a blank sheet of paper, the need to constantly fill in the color on it, so that constantly fill in the paint, and ultimately let me become a beautiful picture.
Third, summarize the shortcomings of their own work.
1, in the work, I occasionally appear to be not concentrated, thought (detailed finalized version) desertion. Bring unnecessary trouble to the work. In the future, I will be serious and rigorous work attitude to complete their work.
2, and other people to deal with, often not active, not enthusiastic. In order to be able to complete the work as soon as possible, often I will not take the initiative to communicate with the leadership and colleagues. This makes me in the company's interpersonal relationship processing there are certain problems. In the future, I will not delay the work of the premise, proactive and friendly communication with colleagues, and colleagues to learn from each other, mutual love and mutual assistance. The above is my summary of the past year's work in quality control, in the face of the new year's work, I want to make persistent efforts to create better work performance.
Inspection and testing of the first half of the work summary 3The first half of 20xx, Dancheng County Quality and Technical Supervision, Inspection and Testing Center, under the correct leadership of the party group in the county bureau, conscientiously implement the provincial and municipal bureau of the work of the spirit of the full implementation of the inspection and testing functions, closely around the county bureau of the overall work of the idea, for the development of the local economy to make its due contribution. Over the past six months, my center to vigorously develop the construction of inspection and testing, comprehensively enhance the level of testing business as the center, the work of the organization is strong, stable work, running well. Center team after a serious summary of previous achievements and work methods, to further improve the rules and regulations, to take practical measures to increase the work force, all cadres and workers glowing with a new state of mind, enthusiasm for work has been a new improvement. Work achievements are also to build on the success, a new high, the first half of the year as of June 8, Dancheng Testing Center *** check measuring instruments 1608 units, inspection of 280 batches of goods produced, business income of 440,000 yuan, has completed the year's total income target of 68%, the successful completion of the party group and the center of the team at the beginning of the year the scheduled work plan. Specific work is summarized as follows:
First, the quality inspection work
According to the Municipal Bureau of the first half of 20xx issued by the regular supervision and inspection program and food inspection and its implementation rules, in line with the spirit of service to enterprises, service to the community, six months, *** test samples of 280 batches, of which 128 batches of inspection, commissioned the inspection of 152 batches, involving food, food, food, food, food, food, food, food, food, food, food, food, food, food, food, and food. 152 batches, involving food, chemicals, light industry, fertilizers, building materials and other 16 kinds of products. In accordance with the 20xx regular supervision and inspection program, food inspection and its implementation rules, this quarter **** 106 enterprises carried out supervision and inspection, inspection coverage of 100%, **** 106 batches of samples taken, of which 99 batches were qualified, batch qualification rate of 93.4%, unqualified products supervision of enterprises in a timely manner to rectify, the rectification rate of 100%, a better completion of the department's responsibilities and the higher level! Under the inspection program.
Second, the measurement of the calibration work
In accordance with the mandatory calibration specification requirements, increase for trade settlement, safety and security, health care, and other key national requirements of the measurement of the calibration of measuring instruments, to increase the market, health care, gas stations, catering and acquisition of the market in the use of measuring instruments in the calibration. Develop a detailed work plan, the responsibility to a person. The first half of the first half of the year up to June 8 **** calibration of measuring instruments 1608 units.
Three, industrial clusters laboratory construction work
Henan Provincial Bureau of Quality and Technical Supervision on March 2 in the Henan Province Quality Supervision Kofa [20xx] No. 165 agreed to Dancheng County, Dancheng County Quality and Technical Supervision, Inspection and Testing Center as a basis for the construction of Henan Provincial Lactic Acid Quality Supervision and Inspection Center. At the same time, the construction of Henan Province Lactic Acid Quality Supervision and Inspection Center has also received strong support from Zhoukou Municipal Bureau of Quality Supervision and Dancheng County Party Committee and County Government. Dancheng County county party committee, the county government in Dancheng County, on the basis of gratuitous allocation of 1500 square meters of testing room, and then allocated 600,000 yuan of testing and development funds. Dancheng County, Dancheng County testing center reasonable layout, high standard planning, to the provincial lactic acid quality inspection center construction as the basis for the national lactic acid quality inspection center as the goal, and self-funded more than 300,000, in Dancheng County Industrial Clustering Zone Service Center of the high standards, strict requirements for the construction of Henan Province, the lactic acid quality supervision and inspection center. Specific work is as follows:
1, reasonable layout, high standard planning
For the high standard planning of lactic acid quality supervision and inspection center in Henan Province, Dancheng County Quality Supervision Bureau has repeatedly organized the business backbone of the Henan Provincial Quality Supervision and Inspection Institute, Zhoukou Quality Supervision and Inspection Center, Luohe City, Zhumadian City, Zhumadian City, testing centers, Yongcheng City, National Wheat Flour Quality Supervision and Inspection Center, Ducheon County Quality Supervision and Inspection Center, and other development of advanced quality inspection centers. Visiting and learning, and with reference to the Linying County, Henan Province, puffed food quality inspection center and Minquan County, Henan Province, wine quality inspection center and other provincial centers of the design and planning, high-standard design of Dancheng, Henan Province, lactic acid quality supervision and inspection center. Laboratory layout infrastructure has been completed, to achieve the office area and the inspection area is clearly separate, food and chemical testing is clearly separate. A change in the past the phenomenon of overcrowding in the test room, an increase of 60 square meters of microbiological testing room, high standards for the construction of the sample pre-treatment room, high greenhouse, and atomic absorption and chromatography and other wave detection may affect each other's detection equipment were installed in different rooms. The foundation of a high-standard laboratory has been laid from the starting point.
2, a large number of purchases of testing equipment to strengthen the inspection infrastructure
We built in the first half of this year, high-specification aseptic testing room, aseptic testing room area of 60 square meters, and includes a standard P2 testing room and the overall 10,000, local 100 purification laboratories, has now passed the acceptance by the Henan Provincial Building Decoration and Decoration Quality Supervision, Inspection and Quarantine Center. Reinstalled the experimental bench, laboratory cabinets, sample cabinets, ventilation and light facilities and office facilities. And invested more than 200,000 yuan to purchase a biological safety cabinet, ultrapure water, ultrasonic cleaner, vertical autoclave, mercury meter, enzyme labeling instrument, whiteness meter, viscosity meter and a large number of experimental instruments, comprehensively enhance the testing facilities and testing precision.
Fourth, the system construction work
In the first half of this year after the completion of the laboratory industry cluster relocation, my center in a serious thorough the Executive Board formulated the rules and regulations on the basis of the actual technical institutions, according to the center of our specific, detailed, professional rules and regulations, such as: attendance, health system by the office to ensure that implementation, laboratory instrument management system, precision instrument operation and management system, drug storage system, sample management and processing system, etc., to achieve layer by layer planning, responsibility to a person.
In the specific system reflects my center on all aspects of meticulous, standardized, and clear responsibility for serious implementation, to ensure that we test the work of the provincial quality inspection center operation.
Fifth, personnel training
In the first half of this year, we have repeatedly sent the backbone of the laboratory business to Zhoukou City testing center focused on learning the gas phase, liquid phase detection technology, and Zhengzhou City, something electronic engineering and technical personnel invited many times, focusing on the study of the detection of atomic absorption of heavy metals, improve and enhance the detection technology. Detection technology. For the provincial quality inspection center business to lay a solid technical foundation.
Six, business promotion
In order to increase the business, image publicity, mailing and distributing the center publicity materials, so that the county enterprises to understand us, so that the surrounding counties and cities to understand us to increase our business, to set up our image, for example: through our publicity and excellent testing technology, absorbing a lot of commissioned tests. For the inspection of our fixed products inspection, quarterly through the news media quality information, qualified products classified, batch, sub-bulletin, so that consumers do have a clear idea of the actual protection of the legitimate interests of consumers, by the masses of the people's unanimous praise.
VII, personnel and business adjustment work.
At the beginning of this year, we according to the nature of the work and the size of the workload of our building materials room, mechanics room and flow room room and other rooms and teams to carry out a reasonable division of labor of personnel and business, so that everyone has a business, everyone has a responsibility. Run down, the work progress faster and more efficient. As of June 8, the testing center's overall business income has been completed more than 68% of the annual target plan, and business carried out in the steady growth.
Eight, the second half of the focus and work intentions
(a) focus on strengthening the construction of industrial clusters testing laboratory, focusing on the purchase of funds to purchase a dual-channel atomic fluorescence photometer, increase the detection of a more stable atomic absorption instrument and gas-phase liquid chromatography, from the hardware to improve and upgrade the level of detection.
(ii) to strengthen the project construction, the establishment of length and other new measurement standards, and strive to expand the scope of new business.
(C) focus on strengthening the Dancheng testing center professional and technical staff training and learning, so that the professional and technical staff to further improve the level of inspection and calibration.