From the cost-effective analysis I recommend TongYang pipe industry
HDPE winding pipe is a kind of high toughness pipe, its elongation at break is more than 500%, the adaptability of the uneven settlement and misalignment of the pipe foundation is very strong, good seismic resistance, therefore, suitable for the project. In addition, the direction of HDPE pipe is easy to change according to the requirements of construction methods. During construction, obstacles can be bypassed within the permissible bending radius of the pipe, reducing the difficulty of construction.
In this regard, the more professional is Zhengzhou TongYang pipe industry, Zhengzhou TongYang pipe industry main products: polyethylene double-wall corrugated pipe (HDPE)) DN225mm to DN600mm five specifications models and carbon spiral pipe, DN50 to DN150 and so on six models), steel belt reinforced polyethylene spiral corrugated pipe DN200 to 2600 and other models. Our HDPE double-wall corrugated pipe is widely used in municipal engineering rainwater, sewage discharge; living community sewage discharge; industrial and mining enterprises sewage discharge, drainage pipes; municipal sewage, rainwater collection; ventilation systems, etc..
hdpe double walled bouron
Pipe connection adopts in the socket pre-installed electrofusion wire with the same material socket electrofusion connection technology, connection quality is high. Can do 100% no leakage, to ensure the same life of the pipeline system and the safety of operation. At the same time, because the product in the same application conditions than other pipe light weight, easy to transport, construction is convenient and fast, can reduce the construction cost, in the scope of application, do not need a concrete bedding and concrete pipe base trench can be laid directly after qualified, basically to achieve the side of the excavation, the side of the pipe, the side of the backfill, to simplify the construction process, shorten the period. In the acceptance of the project, the use of closed gas test instead of water closure test, both to speed up the acceptance of speed, but also the section of water closure test in the complicated work and a large number of test costs.