Summary refers to a certain stage of work, study or thought in the experience or situation to analyze and study, make a written material with regular conclusions, he can improve our ability to express ourselves in writing, let's write a good summary of it. So how do we go to write a summary? The following is my personal summary of the power outage emergency drill, for reference only, I hope to be able to help you.

The power outage emergency drill personal summary 1

In order to further strengthen the school safety work, improve the safety of all teachers and students to prevent escape, self-rescue, mutual rescue awareness, the morning of April 17, the school organized the whole school teachers and students to carry out safety evacuation emergency drill, in the process of the drill, the teacher calm and collected, commanded as if certain, the students were not afraid of the danger, swift and orderly, the drill was a complete success.

First, the leadership attaches importance to the drill activities in place

In order to ensure that the drill activities to the implementation of the school set up by the principal as the leader of the school, other school leaders as deputy leader of the school of the middle cadres and all levels of the Department of the person in charge of the members of the leadership team, and held a leadership team and the whole school will be deployed in the work of the drill. At the meeting, Chen Zirong, principal of the school asked all teachers to first from the idea to pay great attention to enhance the awareness of safety precautions, as well as crisis awareness, seize the opportunity of this drill, patriotic education in the students, improve the potential to deal with emergency emergencies. At the same time, emphasized that the drill, must pay attention to the activities of the security itself, safeguards must be in place to ensure that the drill activities carried out smoothly.

Two, meticulous planning, the drill program safe and feasible

The school seriously developed a thorough and meticulous drill program. The moment, route, information, object of the drill made a specific description, the drill of the specific operating procedures, evacuation requirements and precautions were explained one by one, the classroom teachers, guides and related teachers made a specific division of labor. In order to ensure that the drill activities according to the program carried out smoothly, classroom teachers are required to educate students, clear evacuation meeting place, evacuation order and precautions. After hearing the alarm, all students should obey the command, follow the order, fast, safe and orderly evacuation, not to pack up the goods, crowded each other, pushing and shoving, go downstairs first, not to return to the classroom, loud noise, jokes. If you find someone falling down, you should pick him up immediately and help him to escape from the dangerous place quickly. The first thing you need to do is to check the number of people in each class immediately after the class arrives at the designated location, and then report to the leader of the field command of each grade.

Three, orderly, drill effect is good

The school through the radio instructions, "All teachers and students, please note that there is an emergency, please do not panic, all listen to the teacher's command, immediately and orderly evacuation." The teachers present instructed the students to evacuate in an orderly and rapid manner. After arriving at the designated location, the class president immediately counted the number of people and reported to the on-site command. The drill command team strategized and managed the whole situation.

The activity of all secondary students from the classroom evacuation to the destination in 2 minutes and 45 seconds, the elementary school safety evacuation in 1 minute and 12 seconds. The exercise was carried out according to the plan, the whole process of the exercise is both intense, intense, but also organized. This drill is not only an air defense evacuation drill, but also an emergency evacuation drill for school safety emergencies. Once again, the implementation of our school to deal with emergency precautions, improve the actual potential to deal with and dispose of security emergencies, and further enhance the awareness of teachers and students of the safety of teachers and students to enhance the true feelings of distress between teachers and students, and really mastered in the danger of rapid escape, self-rescue, mutual rescue of the basic methods, to reach the desired goal.

The power outage emergency drill personal summary 2

According to the higher level of safety production month requirements, combined with the mine power supply instability of the actual situation, in order to prevent accidents caused by sudden power outages, to improve the organization of the mine disaster relief ability of the leadership at all levels after the occurrence of the disaster, to improve the ability of the workers encountered disaster resilience and self-help awareness of the risk of avoidance, to find the problems in the emergency plan, and then improve the emergency plan to improve the emergency plan, to improve the practicality and operability of emergency plans, and to improve the emergency plan. Practicality and operability of the emergency plan. I organized a large area power outage emergency rescue drill, now the drill is summarized as follows:

First, drill time: June 27, 20xx at 16:00 pm

Second, drill location: and good coal mine

Third, drill content: and good coal mine system unplanned large-area power outage emergency disposal.

Fourth, the purpose of the exercise:

1, test the plan, according to the emergency drill, to find the problems in the emergency plan, and then improve the emergency plan.

2, improve the preparation, through the emergency drill, check the emergency response team to deal with emergencies, materials, equipment, technology and other aspects of the preparedness, found insufficient to be adjusted in a timely manner to replenish, and then do a good job of emergency preparedness.

3, exercise team, through the emergency drill, enhance the drill participants on the emergency plan to familiarize themselves with, and improve their emergency response capabilities.

4, improve the mechanism, through the emergency drill, to further clarify the responsibilities of the relevant units and personnel tasks, rationalize the working relationship, to achieve the purpose of unity and cooperation.

Fifth, the drill through:

1, June 27, 20xx 16:00, the mine duty dispatcher received the ground 10KV substation duty officer Li Yusheng report, the mine main power supply line 543 line blackout, the standby line 521 also shows power outage, resulting in the whole mine power outage. The dispatcher immediately notified the duty officer of the substation to start the generator power supply immediately. At the same time, the dispatcher immediately notified the duty officer of the main fan fan to open the explosion-proof door immediately to take natural ventilation. At the same time, the dispatcher immediately called the duty office of 543 line Guzhai to inquire about the reason for the blackout, and the duty office of Wangtao substation to inquire about the reason for the blackout and the time of the incoming call. The duty officer told the quick break fault has been sent out of the high-pressure class to inspect the line, the call time is not clear.

2, 16:01 immediately reported to the director of the scheduling office, on-duty mine leaders and deputy duty. 3, 16:02 immediately reported to the mine director, chief engineer, electromechanical mine director, safety mine director, production mine director, ventilation district director, the company's scheduling, the project manager, electromechanical manager, production manager, safety station manager, technical manager, the middle of the coal scheduling.

4. 16:03 notify the machine transportation area, safety supervision office, production section, geodesy section, labor and management section, comprehensive office, ventilation area, security, supply section, the main person in charge of each production section to the dispatching room standby.

At the same time, the implementation of the "Heshang Mine Emergency Rescue, emergency shutdown and evacuation authorization" granted the right to the scheduling room, the use of internal and external telephone lines to notify the underground operating points along the evacuation lines:

①, the sub-slope east wing of the railroad track working face → 1320 car yard → sub-slope → ground. ②, the working face of the 9-1 railroad track in the deputy inclined shaft → west wing railroad track → 1320 car yard → deputy inclined shaft → ground.

③ Main inclined shaft working face → main inclined shaft → ground.

④. Working face of inlet traveler's inclined shaft → return wind inclined shaft → ground.

⑤, the working face of the return air shaft → the return air shaft → the ground.

5. At 16:04, the east wing track lane notified the vice captain Yuan Xianpei to organize the working face personnel to evacuate quickly, and at the same time, the electric clampman hit the working face equipment switch to the zero position.

6, 16:05 west wing track lane notified the vice captain will be Jianpai organizing the working face personnel to quickly evacuate, at the same time the electric clampman to the working face equipment switch to zero position.

6:05 notified the pedestrian inclined shaft 6 # coal working face vice captain Huamin due to double circuit power supply all power outage, the call time is uncertain, organizing the underground personnel all along the original wind back to the inclined shaft withdrawal, at the same time, notify the electric clerk to the working face equipment switch to zero.

7, 16:06 notified the pedestrian inclined shaft 9 + 10 # coal face deputy team leader Li Xiaoma organization of working face personnel to quickly evacuate, while notifying the electric clerk to the working face equipment switch to the zero position.

8, 16:07 notification back to the wind shaft due to double circuit power supply power outage, call time is uncertain, let the organization of underground personnel to withdraw

16:07 notification of the main inclined shaft due to double circuit power supply power outage, call time is uncertain, the organization of underground personnel to withdraw, and at the same time, notify the electrician to the electric equipment switch to the zero position.

9. 16:10, the main fan engine room duty officer Guo Qihai reported that the explosion-proof door has been opened.

10, 16: 11 to receive the substation watchman reported generator has started, whether to send power to the ground. Informed that the power can be sent.

11, 16:08 commander-in-chief (mine manager) arrived at the dispatching room:

Dispatch director immediately reported on the scene after the blackout of the organization

After listening to the report, the mine manager immediately announced the start of the emergency plan to set up the emergency command of the mine and the good mine

12, 16:10 members of the command department arrived, the commander-in-chief in accordance with the situation downhole to quickly issued the order of rescue and assistance

(1) Declare the whole mine into a state of emergency.

(2) order: scheduling coordination group Guo Dengliang quickly notify the underground operating locations of the evacuation of personnel in accordance with the disaster line, statistics on the number of people in the affected area, set up a special person to record the time and place of the accident and in the case of accidents, the evacuation of personnel from various operating locations. Report the accident to the superior (the nature of the accident, the time and place of the accident, the scope of the accident, the number of people in the well, the measures taken, etc.).

(3) Order: Li Zhongjin, the power supply security team, started the generator to supply power to the distribution room and the main fan.

(4) Order: the technical support team Ji Minghua immediately bring the mining engineering plan, disaster avoidance route map to the command center.

(5) Order: ventilation safeguard group Zhang Chunguang detects the outpouring of harmful gases underground.

(6) Order: safety supervision group Li Shulin, labor Du Jianguo in 10 minutes to identify the number of people trapped underground, reported to the mine dispatch room.

(7) Order: material security group Zhu Wucheng quickly organize personnel to prepare rescue supplies on standby.

(8) Order: Ground integrated coordination group Wang Jishan notified the first aid station to send rescue personnel and rescue equipment to the wellhead, ready to implement personnel rescue. Send vehicles to the wellhead to carry out the task of picking up and dropping off people

(9) Order: vigilance and security group Wen Zhiqiang quickly organize personnel to the wellhead, security and vigilance work, strictly prohibit unrelated people to stay near the wellhead.

(10) order: communication group Guo Qiwei check the communication system up and down the shaft, to ensure that the mine inside and outside, up and down the shaft communication smooth.

(11) Order: monitoring and control group Zhang Yong timely observation of underground gas outflow. 13, 16: 13 security reported that the wellhead guard has been set up

14, 16: 15 office reported that the emergency vehicles are in place

15, 16: 20 labor and management reported that the number of people counted into the well

16, 16: 25 electromechanical report line contact Status report

17, 16:26 rescue team and medical team in place

18, 16:27 into the wind traveler slanting shaft personnel have all safely withdrawn 30 people, no casualties.

16: 27 back to the wind vertical shaft 6 people reported personnel have been withdrawn, no casualties.

19, 16:41 main inclined shaft personnel 11 people have all withdrawn, no casualties.

20, 16:54 deputy inclined shaft all withdrawn, *** counted 30 people (east track 16:39 withdrawn 10 people, west track 16:54 withdrawn 10 people, transport and handling team 16:39 withdrawn 10 people), no casualties.

21, 16:54 safety supervision team, labor and management team reported that all the underground personnel have been withdrawn, no casualties.

22, 16:59 to the substation duty officer reported 543 line power supply is normal.

23, 17:00 reported to the commander-in-chief, the commander-in-chief immediately issued an order to stop the generator work, switch to 543 lines, and immediately send power to the distribution points, notify the wellhead in the wellhead detection of the gas situation, according to the gas detection situation in the wellhead and monitoring and control of uploaded data to determine how to discharge the gas, such as gas concentration in line with the requirements to immediately open the main fan fan machine.

24, 17:02 to the main inclined shaft Chen Xiliao report back to the wind flow gas normal with start fan conditions. 25, 17:05 to the wind back to the vertical well Zhang Aihua report back to the wind flow gas normal with start fan conditions.

26, 17:10 to the deputy inclined shaft Wang Kaijin reported that the return air flow gas is normal with the conditions to start the fan. 27, 17:12 to the wind into the traveler's inclined shaft Zhang Chunguang reported that the return air flow gas is normal with the conditions to start the fan.

28, 17:20 general director announced the start of the fan order, to be fan start normal, gas detection in line with the provisions of the regulations to arrange for the tile inspector and the safety officer, electric clampman, anemometer along the mouth of the well to check the gas situation in the operating points, the detection of the gas is normal, reported to the dispatch office, according to the order of the command to start the local ventilator.

29, 17:30 each operating site tile inspector reported normal gas underground, resumed local ventilation fan air supply.

30, 17:40 reported that the water pump has been started, drainage is normal

31, 17:50 the commander-in-chief announced the end of the drill

Six, the drill effect evaluation:

From the effect of the drill to see the drill work well-prepared, the leadership in place to arrange, start fast, and a clear division of labor. Participate in the drill workers are able to quickly evacuate the ground according to the predetermined methods and lines of disaster avoidance. The whole drill process is relatively smooth, the command members can arrive at the dispatching room at the first time, according to the emergency rescue plan to carry out the work. Achieved the expected effect, realized the drill team, grinding mechanism of the drill objectives, completed the scheduled drill tasks.

Seven, there are problems and countermeasures:

1, the scene of the participants and scheduling coordination link is not compact, reporting is not clear, scheduling personnel to convey the order is not concise, decisive, on the operation of the location and the person in charge of the phone number is not clear. To strengthen the learning of personnel emergency disposal, improve the emergency disposal ability of the operating personnel.

2, after the blackout of the main inclined shaft, back to the wind wells inside the line phone can not be used, is now ready to the main inclined shaft, back to the wind wells laying fiber optic cable, need to be resolved by the company telephone optical two pairs, cable and telephone line, telephone.

3, some of the personnel in charge of the scope of responsibility is not clear, after the accident reporting confusion, not clear.

4, the wellhead check body record book on the number of people entering and leaving the well is incomplete, the record is not clear. Requirements in strict accordance with the entry and exit of the well body check system for body checking, registration.

5, the generator capacity is small, after the blackout can not meet the requirements of the mine power supply. Improve the power supply system to ensure that the mine double circuit power supply requirements.

6, drawings filled in a timely manner, the power supply system map did not increase the main belt equipment into the wind traveler inclined shaft. Requirements for timely filling of various drawings.

7, some people do not pay enough attention to emergency drills, slow evacuation after power failure. Strengthen the study of emergency disposal of the operating personnel, improve the emergency disposal ability of the operating personnel, and evacuate in a timely manner according to the instructions of the scheduling after the accident.

8, in the power outage process, the operator still exists in the operation of the idea is not clear phenomenon. Requirements to strengthen theoretical learning and practical operation.

June 27, 20xx

Power outage emergency drill personal summary 3

February 20, 20xx at noon xx:30 ~ 17:00, in my section of the hole in the beam tunnel inlet, the organization of a more than two hours long. Tunnel collapse emergency plan drill. Now the drill is summarized as follows:

First, the drill process records:

June 3, 20xx xx:30, assuming that the hole in the tunnel inlet palm face at the collapse, the hole on duty to quickly evacuate, guiding the hole construction personnel to evacuate the palm, after the report of the deputy manager of the Wang, so that the Kang Wei on the one hand, after the roll-call way counting people, on the other hand, after the counting of people, after the counting of people. After Wang's report, Kang Wei, on the one hand, counted the number of people, on the one hand, through the mobile phone to report the danger to the manager Yuan, who immediately reported the accident to the higher leadership, and led the relevant departments in charge of the command department to arrive at the scene within 10 minutes to organize the rescue.

Upon receipt of the report of the danger, the project department immediately through the tannoy, cell phone and other contact information to organize the rescue group, logistical support group, alert group, the technical program group to enter the emergency state. After observing the scene, the leader and members of the emergency rescue leading group formulated the emergency treatment program and division of labor. In accordance with the development of rescue program requirements, the alert group on the road, hole and construction site alert, strictly prohibit people from entering the project has nothing to do with the rescue; correctly and quickly guide the rescue, ambulance vehicles; and is responsible for the rescue site security alert, to play a scenario timely reminder of the purpose of ensuring that the safety of the rescue personnel. Logistics support group timely notify the Yan'an Municipal Bureau and the hospital to make rescue preparations, medical personnel in the hole on the assumption that the injured personnel carried out the initial treatment, and with the rescue vehicle together with the assumption of the injured in time to the hospital for rescue. Rescue and rescue group, logistics support group seriously fulfill their duties, to be assumed that the injured were rescued from the hole, the hole machinery, materials withdrawn to a safe zone, the rescue materials (φ200 seamless steel pipe, φ42 steel pipe, φ22 reinforcing bars, reinforcing bar mesh, steel arches, I16 I-beam, square logs, round logs, wooden boards, etc.), machinery and equipment (loader, excavator, dump trucks, welding machine, oxyacetylene welding, etc.) transported into the hole in batches, the hole. Under the premise of confirming safety, quickly organize personnel to reinforce the collapse of the body treatment and spray concrete reinforcement, to prevent the spread of the accident.

Second, the drill achievements

In the current national security type of tension, urgent premise, to carry out tunnel construction safety special management activities, through the adoption of thematic meetings, on-site inspectors, emergency response drills and other forms of different forms of education, play a role in the prevention and reduction of hazards brought about by the construction of tunnels, and effectively improve the construction line personnel of major accidents, the construction of the construction of the tunnel construction safety management activities. Improve the construction of the front-line personnel on the rescue of major accidents and emergency awareness, after the tunnel exit organization workers in the hole "tunnel collapse" emergency emergency response plan simulation exercise activities to reach the following objectives:

First, before the accident really happened, to test the practicality of the major emergency response plan for tunnel collapse,

First, before the accident really happened, to test the major emergency plan practicality, feasibility and reliability;

Second, to test all the staff in the event of an emergency, whether to clarify their responsibilities and emergency action procedures;

Third, to improve the team's level of coordination and emergency response to the actual ability to enhance the workers' awareness of the safety;

Fourth: after the drill to achieve the emergency response to the practical experience.

Third, the drill deficiencies

1, construction workers in the rescue process is not serious, awareness is not in place, in the rescue of the phenomenon of mutual jokes;

2, the medical staff need to strengthen the training;

3, rescue personnel to strengthen the transmission of information;

4, the drill steps To be organized, the drill process site some confusion.

The drill took 2 and a half hours, the overall drill is relatively successful, to achieve a strong organization, proper command, to determine the accuracy of the measures used effectively. The groups acted in a timely and methodical manner, so that the participants in the exercise fully recognized the importance of emergency drills, for the tunnel construction may occur in the rescue of dangerous situations laid the foundation.

After this drill, it increased the safety awareness of construction workers, improved people's ability to avoid accidents, prevent accidents, resist accidents, and raised vigilance against accidents; and supplied experience for the rescue of similar accidents in the future.

Overview of the mine power supply system

Our company uses high-voltage double circuit power supply, Ⅰ circuit power supply from the Yan'an Power Supply Bureau Diantou 110KV regional transformer out of the cabinet, the voltage level of 10KV, the length of the overhead line into the line 4.2KM. Ⅱ circuit comes from the Huangling Mining Industry 110KV The maximum load of the whole mine is 1500KVA.

Our company set up 10KV ground substation and 6KV ground substation each one, 10KV substation was completed and put into operation on April 26, 20xx, 6KV substation was completed in October 20xx after the renovation and upgrading of the KYN28-12Z vacuum high-voltage switchgear. -12Z vacuum high-voltage switchgear adopts YH-B300 series digital protection, measurement and control automation device, capacitor bank adopts DWK/BR-IV type substation voltage reactive power automatic compensation control device, and the backstage adopts YH-2100 backstage software. Version 3.0, which can realize the functions of telemetry, remote control, telecommunication and remote adjustment of 10KV and 6KV high-voltage systems.

The underground adopts high-voltage double-circuit power supply, and there are four substations, with two trips of MYJV22-3×70 type cross-linked polyethylene steel belt armored PVC sheathed cables for underground power supply fed from the ground 6KV substation to form a double-circuit into the well, and each underground substation is a double-circuit introduction and feed-out, and the junction mode is a single-bus segmentation. The high voltage of underground substation is installed with PBG series PLC-controlled high voltage explosion-proof distribution device and KBSG-400 type mining explosion-proof high voltage dry-type transformer, and the low voltage is installed with KBZ and KJZ5 series PLC-controlled mining vacuum distribution device.

All kinds of high and low voltage power supply and feeder equipment in the mine are in perfect working condition, complete protection, system stability, underground power supply system has leakage, overcurrent, grounding three major protections, with a complete grounding network, substation equipment and cables by the Yan'an Power Supply Bureau of the electrical preventive test inspection pass.

In order to strengthen the effective control of the company's power supply system large-scale power outages, improve the ability to deal with emergencies, timely, rapid and effective measures to prevent power outages caused by accidental casualties and major economic losses, minimize the risk of accidents and reduce the power outage

time, to ensure that the stability of the power supply system of the entire mine, the company decided on June 19, 20xx 16:00-18:00 p.m. to carry out emergency drills for large-scale power outages.

Second, the organization and leadership and preparation

To ensure the success of this large-scale emergency drill, the company in June 17, 20xx set up a large-area blackout drill leading group.

Commander-in-chief: Xue Guohua

Deputy Commander-in-chief: Yuan Hongping, Tian Guangjun, Xing Taijun

Members: Fan Junyi Yu Jiandong Zhang Ping He Guoping Pan Long Chen Tingshe Yan Liao'en

Liang Hui Yang Zhonghua Qiang Yuan Xiaodong Wang Yalin

The large-area blackout emergency drill headquarters in the dispatch room, Xue Guohua by the command of the unified.

Third, the large-area blackout emergency drill through

The number of people who participated in this anti-wind drill is as follows: command and leadership group of 16 people, 55 people in the coal mining team, 34 people in the preparation team, 36 people in the machine transportation team, 13 people in the safety supervision department, 18 people in the electromechanical team, 4 people in the Department of Electrical and Mechanical Services, 3 people in the Department of Production, 2 people in the Ventilation Division, 3 people in the Department of Logistics and Defense, the Hospital 4 people, this mine temporary rescue team 10 people.

20xx June 19th afternoon 13:00, our secretary Zhang, Xue manager, Tian manager, electromechanical minister, ventilation section chief, safety supervision minister to organize all the mine to participate in the large-scale power outage emergency drill departments and individuals held a special meeting, the large-scale power outage emergency drill general mobilization, carry out the study of the emergency drill plan and safety measures. 13:55, electromechanical mine director issued a large-scale power outage order. 14:00 high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure, high pressure At 14:00, the high-voltage one circuit and two circuits stopped running, making the whole mine without electricity and ventilation interruption. 14:02, the dispatching office actively contacted various underground workplaces to evacuate people, before evacuation, the electrician on duty and the post worker of each underground team must cut off the power supply of the equipment of each subordinate precinct (all the feeder switches are played to the zero position), and lock before they can be withdrawn from the well. The dispatch office is responsible for counting the number of people in the well at the entrance. 15:00, each area team supervisor

Captain reported that all the people in the well have been all in the well and signed to confirm, the dispatch office to further verify that all the people in the well all the people in the well all the people in the well all the people in the well. 15:05, the director of the electromechanical mine ordered to restore the first circuit, the second circuit of the high-voltage normal operation, the main fan room to start the main fan. 15:10, the main fan normal operation. 15:15, the main fan is running. At 15:15, the mine manager issued an order, underground ventilation professional group, mine rescue workers, downhole in accordance with the provisions of the gas and air volume measurement, to be measured air volume and gas have reached the requirements of the regulations, reported to the dispatching room. 18:10, underground ventilation professional group reported that all the data measurement is completed. 18:15, the manager of electromechanical issued an order, the underground mine room transformer downhole to restore the power supply in the shaft. 19:30, the substations in the shaft to restore the power supply. 19:30, the substations in the shaft to resume normal operation, the main fan room start the main fan: The first step is to make sure that you are able to get the best out of the situation.

Four, the emergency drill power supply and ventilation equipment operation time

1, 13:55 minutes the command of the mechanical and electrical manager ordered a circuit, two circuits of high-voltage stop running, 14:00 high-voltage power outage operation is complete, lasted 5 minutes.

2, 15:05 start the main fan operation, 15:10 main fan operation is complete, lasted 5 minutes.

V. Summary of experience

Successful:

1, all personnel in the receipt of a large-scale power outage, able to operate in accordance with the operating procedures in an orderly manner. And timely report the situation to the dispatch office.

2, distribution workers can effectively take responsibility, keep calm at the critical moment, bold and careful, can be operated in accordance with the operation, accurate power outage.

3, mine leaders and section leaders on duty can stick to their posts, get the news can be rushed to the dispatch room in time to sit in the command, to maintain the rescue first work in an orderly manner.

4, the underground workers and the relevant district team to get the order can seriously implement the order to unite to complete the task.

5, this drill to complete the booking of the task, to meet the requirements.

6, emergency preparedness, mine leadership attaches great importance to the drill plan electromechanical department, electromechanical team of the mine power supply system to carry out a comprehensive inspection of the equipment for the explosion check, to ensure the smooth progress of the emergency plan; safety supervision department, the ventilation team of the wind meter, optical gas detector together with centralized calibration to ensure the accuracy of the instrument.

Shortcomings:

1, individual locations did not set up a person to answer the phone.

2, after receiving the call did not immediately remember the evacuation, in the process of evacuation of individual workers move slowly.