The secondary water supply facilities referred to in these measures, refers to the secondary water supply because of the need to set up the cistern (box), water pumping station and ancillary facilities (pipelines, valves, pumping units, water treatment equipment, disinfection equipment, air pressure tanks, etc.). Article 4 The municipal construction department is responsible for the supervision and management of secondary water supply, and its Yinchuan City, urban water conservation management organization is specifically responsible for the day-to-day supervision and management of secondary water supply.
The municipal health department is responsible for secondary water supply water quality health testing and health supervision. Article V new construction, alteration and expansion projects, in accordance with national regulations require the construction of secondary water supply facilities, secondary water supply facilities should be designed at the same time as the main project, the same time the construction, and at the same time the delivery of use.
Construction and construction units should be in accordance with the design of secondary water supply facilities and construction programs for construction. Secondary water supply facilities design, construction program and change, should be filed with the municipal water conservation management agency.
Secondary water supply facilities should be accepted at the same time as the main project, the construction unit in the organization of acceptance, should be invited to the competent department of municipal health, municipal water-saving management agencies and urban water supply enterprises to participate in the acceptance; secondary water supply facilities without acceptance or acceptance of unqualified, shall not be put into use. Article VI design of secondary water supply facilities shall be in accordance with the design specifications for secondary water supply facilities, the material shall comply with national standards and installation specifications.
Prohibit the use of poured concrete tank (pool) and steel plate tanks and other water quality impact on the water tank (pool), prohibit the use of fire, life mixed water tank (pool). Being used by the property rights unit is responsible for rectification.
The use of secondary water supply non-negative pressure equipment caused by the public **** pipe network pressure relief, affecting the normal use of water by the surrounding residents, the property rights unit is responsible for rectification. Article secondary water supply project is completed, the construction unit of secondary water supply facilities for cleaning, disinfection, water testing and water quality testing, shall notify the city of urban water conservation management agencies to supervise the scene. Water quality testing should be qualified by the appropriate agency to issue a "water quality test report". Article VIII has been built secondary water supply facilities, any unit or individual shall not be removed without authorization, deactivated or diverted to other uses.
Secondary water supply facilities by the management unit (property management unit or property rights unit) is responsible for the management and maintenance, and in accordance with relevant regulations for the "health license. Article IX secondary water supply facilities construction unit or management unit without approval, shall not be unauthorized secondary water supply facilities and public **** water supply network connection, the overflow pipe shall not be directly connected to the drain, the overflow pipe mouth should be equipped with protective net. Drainage outlet should be equipped with sealing protection facilities, the materials used should be non-toxic, harmless. Water tank should be covered, locked, no running, bubbling, dripping, leaking phenomenon. Article X secondary water supply facilities management unit shall regularly overhaul, cleaning, disinfection of secondary water supply facilities, the establishment of overhaul, cleaning, disinfection files, the implementation of the card system, the overhaul, cleaning, disinfection, registration.
Water supply tank cleaning, disinfection, not less than once every six months, water quality testing once a quarter, the results should be made public to the user. Article XI of secondary water supply facilities, cleaning, disinfection, cleaning, maintenance work, should be undertaken by the appropriate qualified units. Cleaning, disinfection, cleaning, maintenance work should be chosen not to affect the residents or units of normal living water hours. Each cleaning, disinfection, cleaning, maintenance, water quality testing should be carried out, water quality testing before being put into use. Article XII engaged in secondary water supply facilities cleaning, disinfection, cleaning, maintenance of the unit should have a fixed workplace, set up cleaning, disinfection tools disinfection room, regular cleaning, disinfection tools for disinfection. Cleaning, disinfection, cleaning, maintenance personnel should be trained in health knowledge and health checks, and obtain a health certificate issued by the municipal health department and to the municipal water conservation management agency registration record before taking up their duties. Article XIII of secondary water supply facilities management unit shall establish a monitoring system, monitoring information should be saved for 30 days.
Secondary water supply facilities, equipment should be taken between the locks and other protective measures, the implementation of personnel management. Specialized management of the establishment, change should be promptly reported to the municipal water conservation management agency for the record. Article XIV of secondary water supply facilities management unit shall be in accordance with the "secondary water supply facilities health norms", the daily water quality of water tanks for testing, making good operational records, and to the municipal health department and the municipal construction department in charge of the test information. Article XV secondary water supply facilities management unit shall not stop the water supply without authorization (except for emergencies). Due to equipment maintenance and repair of water stoppage is necessary, the user should be notified 24 hours in advance; stopping water for more than 24 hours, reported to the competent construction department for approval, to take temporary water supply measures.