Time always inadvertently slipped away in a hurry, and our work has come to an end, looking back on this period of time, must have made a lot of achievements, to write a job summary for this year's work. You have seen the work summary should be what kind? The following is my carefully organized EIA acceptance of the work summary, for your reference and reference, I hope to help friends in need.
EIA acceptance work summary 1First, the project background
The project was approved by the Hebei Provincial Development and Reform Commission Ji Ji Ji Ji, in xx City, Lubei District, xx City, the cylinder kiln thermoelectric power plant in xx City, the expansion of the site reserved for the construction of the talk about the meal of domestic waste incineration project, the project in the preliminary preparations and the construction of the construction process, *** to obtain the national bond funds 48 million yuan, including special funds from the central budget and local budgets. Including the central budget and local budget special funds in place a total of 85 million yuan: the project in December 20xx, complete the construction plan design, in the cylinder kiln thermal power plant within a year and a half after the start of construction, due to changes in the external economic situation, xx city re-amended the master plan, the original construction site is planned as a wetland reserve, the project stops construction: April 20xx, according to the requirements of the xx city master plan planning requirements, project The project was restarted in a different location. The total size of the change to 1500 tons of garbage per day, in accordance with the spirit of 20xx April 20, xx municipal government special meeting minutes, xx Xinfeng Cogeneration Group Co., Ltd. is responsible for the full acceptance of the construction of xx Clean City Energy Co.
Second, the project overview
The project has not been with the xx city xx district Jianzigu landfill northeast of the city, the main treatment of xx city Lunan District, Lubei District, Kaiping District, Fengan District, Caofeidian Industrial Zone, Fenghuang industrial area, Nanbao Development Zone and other territories within the domestic garbage, the construction scale of the day to deal with domestic garbage 1500 tons, set up Three 75t/h circulating fluidized bed waste incineration boiler production line, each line daily capacity of 500 tons of garbage, supporting (1x12 + 1x25) MW turbine generator set, the total investment of 440 million yuan, of which environmental protection investment of more than 80 million yuan. Accounting for 12.5% of the total investment .
Third, the completion of environmental facilities
xx Shanwei Energy Co., Ltd. is responsible for the construction of waste incineration project, are based on the feasibility study report and preliminary design approval, in strict accordance with the EIA report and the EIA approval requirements for the construction of the project, the current plant environmental protection facilities have been completed in full, which is briefly described below.
(a) Unloading hall
The garbage unloading platform is indoor arrangement, in the main plant 8.00mm layer, the unloading platform is equipped with a special import and export of garbage trucks, 10 unloading positions, the platform is 24m wide, it can satisfy the maximum garbage transfer vehicles driving, turning around and unloading without influencing the operation of other vehicles, the garbage unloading platform meets the requirement of rinsing impermeable, the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door above the import and export and the platform is equipped with electric roller shutter door. The platform is equipped with electric roller shutter door and air curtain wall above the entrance and exit to prevent the spread of odor.
(ii) garbage storage tank
The total effective volume of garbage storage tank is 17,955m3, which can store more than 7,000 tons of garbage, and can satisfy the garbage incineration quantity of 5-7 days: the concrete panels of the garbage storage pit and the garbage leachate collection pool adopt the anti-seepage measures to prevent the leachate leaking out and to avoid the seepage of the groundwater
There are the suction air ports of the incinerator's primary and secondary fans in the upper part of the garbage storage tank, and the suction air ports of the secondary fans are maintained to prevent the spread of odor. The suction port of the secondary fan is provided on the upper part of the garbage storage tank to maintain the negative pressure of the garbage storage tank. In the garbage storage tank thatched with an accident fan, in the case of the whole plant shut down for maintenance or sudden accidents, the garbage storage tank gas can be processed by the top of the plant activated carbon adsorption device discharged into the atmosphere, to avoid the escape of odor.
(C) slag warehouse
Slag warehouse effective volume of 1225m3, storage of 7 days of slag. Equipped with bag duster and 15 meters high smoke pipe.
(D) Lime storage bin
Lime storage bin is set up according to the lime consumption of 3 flue gas purification lines and 3 days' storage. The silo V=130m3 is equipped with bag filter and 15 meters high smoke pipe.
(E) activated carbon storage warehouse
Set up three activated carbon storage warehouse, one for each line, according to the 5 days of . The volume of activated carbon is 5m3. The exhaust port is connected to the bag filter of the lime silo.
(F) Fly ash storage warehouse
Fly ash considering three lines of two days of storage capacity, set up two 800m3 storage bins. It is equipped with bag filter and 29 meters high smoke pipe.
(G) Garbage leachate treatment system
Garbage leachate is treated by the process of "dynamic anaerobic + membrane bioreactor (MRB) + first-stage sodium filtration (NF) + first-stage low-pressure reverse osmosis (RO)".
Now has built 300 tons / day leachate leachate treatment plant, its treatment effect reaches (GB18918-2002) a A standard, 70% of the treated water as greening, spraying roads and water towers with supplemental water, the remaining 30% of the concentrate sprayed back to the boiler incineration. The domestic sewage is treated in the leachate treatment plant through septic tank and domestic waste water tank.
(H) waste incineration system
process using circulating fluidized bed waste incineration boiler, furnace according to the "three high" principle of combustion, that is, high temperature, high perturbation degree, high residence time. Furnace combustion is not less than 850 ℃ flue gas residence time of more than 3.5 seconds to inhibit and reduce the flue gas in the dioxin, CO content, under the bed of slag in the slag discharge, and the rest of the furnace back to the use.
(IX) pharyngeal gas purification system
Incinerator flue gas treatment using "combustion control + semi-dry scrubbing + activated carbon adsorption + dust bag". Exhaust gas treatment process, the use of alkaline semi-dry reactant lime milk as an adsorbent, the absorption of flue gas in the acidic components; while using powdered activated carbon porous and heavy metals and other toxic components down to within the standard range, by the bag dust collector capture, dust removal rate of 99.5%, while the use of blended limestone desulphurization rate of more than 85%. Online monitoring of the smoke tube has been networked with the Municipal Environmental Protection Bureau to achieve real-time monitoring.
(J) water supply and drainage system
water according to the design of the use of xx City, Fengnan District, Chengnan sewage treatment plant water, water pipeline, sewage pipeline according to the requirements of the environmental assessment of the same road paved to the Chengnan sewage treatment plant.
(XI) Solid Waste Disposal
Risky solid waste is fly ash, general solid waste is slag, domestic garbage.
(1) hazardous solid waste:
Fly ash: incinerator outlet flue gas dust collection dust ash to pneumatic method sent to the ash silo after the xxx city of Funing Xu Shankou hazardous waste treatment station with closed tanker trucks.
(2) general solid waste:
Slag: solid waste slag discharged from the furnace bed after the combustion of garbage and coal in the incinerator is cooled by a slag chiller and then transported by the slag conveyor chain hopper to the slag storage, sold to Changzhou City Baojiang Furnace Material Processing Co.
Living garbage: collected and sent to the incinerator for incineration.
EIA acceptance work summary 2
First, the basic situation of the hospital:
I hospital since April 10, 20xx received the municipal bureau set up since the instrument of approval of the medical institutions,, in the leadership at all levels and the relevant departments of the care and help, the work is progressing smoothly, the work is completed better. In the early stage, according to the hospital functions and departments set up to complete the decoration and supporting facilities, recruitment of various types of professionals at all levels, the introduction of technical personnel, the purchase of various types of large and medium-sized medical equipment. Some of them are entering the stage of installation and commissioning one after another. The construction of various systems and the training of all staff have been completed. According to the current situation of the hospital, has basically with the opening conditions, please leaders, experts to further work guidance.
Second, the hospital department set:
According to the hospital work we set up the emergency department, internal medicine, surgery, gynecology, pediatrics, traditional Chinese medicine, stomatology, otolaryngology, ophthalmology, anesthesiology, laboratory, pathology, medical imaging, dermatology, preventive health care, and other clinical departments, and operating room, supply room, Sick room and other supporting departments, office, medical department, nursing department, hospital sensory department, financial department, general affairs department and other administrative departments set up a reasonable, well-staffed to meet the needs of the development of the hospital work. *** There are 100 beds set up in the ward, medical room ***30800 square meters. The ward is spacious and bright, and has an independent bathroom. The facilities in the ward are all in place to meet the needs of patients hospitalized. (Attached to the medical institution department set up)
Third, the hospital staff composition:
The current hospital staff total 121 for people. High, middle and junior levels of personnel of all kinds of basic in place, the structure is reasonable, can meet the needs of clinical medical work. According to the actual situation of our hospital, we have formulated various medical rules and regulations, administrative management system, medical and nursing technical operation procedures, hospital emergency plans and staff manuals, etc., and compiled into a booklet for the convenience of the staff to learn. The establishment of the above systems will undoubtedly provide sufficient protection to strengthen and improve the management of our hospital, standardize medical behavior, further improve medical quality and promote the healthy development of the hospital. Outpatient wards of the basic equipment, infrastructure are complete, can meet the needs of clinical medical work. (Attached to the list of equipment)
Six, the hospital staff training:
In order to further improve the quality of staff, to fully explore the potential of each employee, and constantly enhance the staff's awareness of the ideology, sense of work, sense of responsibility, sense of service, and to establish the staff's spirit of hard work, dedication, dedication, and teamwork; the hospital on the staff training is very important. The hospital attaches great importance to the training of staff, and has carried out various types of training for all staff. We also organized staff to learn different knowledge of hospital regulations, technical operation procedures, infectious disease prevention and control law, knowledge of nosocomial infection, knowledge of disinfection and isolation, and disposal of medical waste. We also organize lectures on fire fighting, thus enabling our staff to enhance their fire fighting awareness, learn fire fighting knowledge, avoid and eliminate the occurrence of potentially hazardous factors, and safeguard the safety of national, collective, and individual lives and properties. The hospital often organizes business lectures for its staff to continuously improve their business knowledge and skills, enhance their academic awareness and level of learning, thus improving their medical knowledge. Above, we do the preparatory work before the opening of the clinic, the smooth opening of our hospital laid the foundation for the future work of the hospital will also have a positive role in promoting.
VII, disinfection supply room basic situation:
Disinfection supply room is an important department of the hospital, is mainly responsible for the hospital's medical disinfection supply work. In this regard, the hospital leadership attaches great importance to the professional health professionals to guide the construction of the commissioning is now complete, and equipped with senior nursing staff as the head of the department, can meet the hospital disinfection supply work.
Eight, medical waste treatment:
The hospital leadership attaches great importance to the treatment of medical waste. We have signed a medical waste incineration contract with Kangsheng Company, and the hospital's medical waste is all recycled and disposed of by the company.
Our hospital has a temporary storage of medical waste, and separately marked medical waste, living waste different storage points, set up a person in charge of recycling, and do a good job of the registration work. Medical waste temporary storage in line with the requirements of the room closed, locked, anti-rodent, anti-theft, security measures in line with the requirements. Indoor lighting, and the installation of ultraviolet lamps, to achieve regular disinfection, in order to prevent medical waste caused by environmental pollution.
Nine, on the hospital environmental assessment:
The hospital attaches great importance to environmental protection. Medical waste hospital has signed a medical waste incineration contract of intent with Kang Sheng company, the hospital medical waste all by the company recycling and disposal, and into the infection section, the establishment of the hospital infection, disinfection supply, garbage disposal and other relevant rules and regulations as well as the hospital sensory team, the protection of the environment, to reduce the pollution have a positive significance.
In view of the hospital's preparations have been ready, special application for the higher arrangements for experts to visit our hospital acceptance guidance.