2022 maintenance work summary sample 5 articles

Light like an arrow, the years have no trace, a period of time has come to an end, recalling this period of time, must have made a lot of achievements, we have to do a good job of reviewing and combing, write a good job summary Oh. But how to write a work summary to be colorful? The following is my careful to organize 2022 maintenance work summary sample, I hope you like!

2022 maintenance work summary model 1

20__ year is about to pass, in this year, I unremitting efforts, hard work, the courage to attack, became the station's technical "big", for the enterprise to create direct economic value of more than 1.5 million yuan. The value of more than 1.5 million yuan, in the ordinary repair positions, with the spirit of selfless work and skillful repair skills, won the respect of everyone and the user's praise, for the development of the enterprise has made due contribution.

First, study hard, and strive to be a technical leader.

The book mountain has a road, the sea of technology without end. To the maintenance station, only junior high school culture, I know: as a technical worker, if you can not read the drawings and information, can not figure out the principle of the equipment, drilling through the vehicle structure, not only very embarrassing, and not qualified workers. I overcame the disadvantages of low cultural level, with a not to achieve the goal of not stopping the "bull", and strive to "refueling and charging" for their own. In order to buy some useful technical books, I often squeeze out some change from my living expenses, and put books to study technology. I have studied "vehicle structure", "mechanical foundation" and other technical theories, and apply the learned knowledge to the actual production, and constantly improve professional skills. Sometimes, in order to figure out the ins and outs of a certain accessory, against the technical data, all night pondering research, do not understand, never hand; sometimes, in the workshop to do things, take home to get, over time, my home has become my "Institute". The work is not responsible for the person who has the heart, after hard work and study, to achieve a specialized skill, in several times to participate in the city or the company's technical competitions, time and time again, small show, back to the top of the list. In front of the results, I do not have the slightest complacency, I know, although I am an external employee, but the maintenance station has given me a real platform to display their talents, in the study of professional and technical road, can not afford to be a little false and slack, to use their own unremitting efforts to continue to make new contributions to the enterprise.

Second, the courage to attack, to solve the repair problem.

I used my own smart and learned professional skills, for the user to solve a difficult problem, overcome a difficult pass, so that we trust the "technical master". Nowadays, all the workshop some technical problems, as long as there is a master Zhao on the hand, will be solved.

In April of this year, the scheduler informed me that there is a Passat 2, 0 car, forced downshift, went to several repair shops have not been repaired, to my station to repair. To repair the car to the car, I immediately bring the instrument with the owner of the test drive, driving found that the speed to 100 yards, four automatically down to three gears, the engine noise is serious. The owner said: the problem has appeared three months ago, looking for a number of repair shops, just can not find the problem, in the maintenance of the second station repaired three times, it is recommended to change the transmission, think the cost is too high, so come to my station overhaul and then make a decision. I judge: "engine power, caused by forced downshifting" the cause of the problem, most likely caused by three catalytic blockage, the owner said that has been in the second station with a short-circuit method of checking, did not find a problem. Test drive back, I again detailed inspection, or identified as three-way catalytic blockage. The owner of the car is half believing, I promised the owner, if the problem can not be solved, this site does not charge any fees. After disassembling the three-way catalytic device, found that the blockage area has reached more than 85%, after replacement, the fault was successfully eliminated, not only lifted the user's worries, but also save a large amount of money. The user said with satisfaction: "troubled me for three months of fault, less than three hours to get it done, your repair station technology is too hard."

Third, love and dedication, to meet the needs of users.

"The user is God, must make me satisfied", this is my work creed, no matter when and where, as long as the user a phone call, I am on call. Last year, the Fourth of July, I have not been home for a long time, I intend to use the holidays and his wife and children back home with their parents for the holidays. That day, I was with my wife in the hair salon head dyeing hair, just put the ointment on the half, received a repair station manager's phone: oil technology research institute of a car broke down on the highway in Hadamaru, in urgent need of rescue. I knew in my heart that the unit was already on vacation and the repair staff was insufficient. Strong sense of responsibility, I do not care about the dyed half of the hair, quickly let the barber with a piece of plastic film to wrap the head, and immediately set off to the scene. My wife advised me to go after I finish my work. I said: "No, the user for help is a silent order, the car is broken on the highway, people do not know how to anxious which". When customers see me like this to save the emergency, gratitude, overflowing. Vehicle troubleshooting back to the unit, has been more than seven o'clock in the evening, the user insisted on treating me to dinner, I politely declined, the user said: "your station is not only a first-class technology, but also service to the home,". This is how I think of the user's thoughts, anxious user's urgency, to help the user's needs, time and again with their passion and practical action, won the user's praise.

Fourth, pass on the skills, for the teacher to take the apprentice to educate people.

"A flower open is not spring, a hundred flowers bloom spring garden". 15 _ not only their own technical excellence, but also enthusiastic apprenticeship, dedication to educate talent for the long-term development of enterprises, play their own light and heat. I have taken more than 30 apprentices, and in practice summarized a set of "two hearts", "three diligence" of the "apprentice method", that is, the skills to learn to be dedicated, attentive; practical operation to be "Mouth hard", "hand hard" and "leg hard". Each of the apprentices they have taken to insist on doing: good guidance, teach by example, not only teach business skills, but also with the character of the person. I have taken the apprentice, some have embarked on the unit technology management positions, some have become the unit's production backbone. Years and years of peach and plum fragrance, year after year wave by wave, I use blood and sweat, for the enterprise accumulation of talent and strength.

20__ years, I will continue to serve the user with enthusiasm, with excellent technology to win the customer, with a loyal attitude to contribute to the enterprise, in the ordinary post writing a moving song of youth.

2022 maintenance work summary sample 2

In order to ensure that the 20__-20__ annual heating period heating work smoothly, the company's staff vigorously carry out energy saving and consumption reduction work, in the staff *** with the efforts of the majority of residents in the warmth and comfort through the Continuously low winter temperatures. In response to the actual outdoor ambient temperature continues to be low, the company raised the heating temperature at the right time, and timely acceptance of user complaints, processing and temperature measurement, so that the quality of heat supply and service quality has been further improved. Review 20__-20__ years of heating work, we have made gratifying achievements, safe production and heating quality double standard. These achievements were made in the **** with the efforts of all employees. Summarized, we mainly grasp the following aspects:

First, with advanced cultural concepts to guide the work of safety

I asked the Division of the chemical personnel to firmly establish the life above all, the responsibility is heavier than Mount Taishan's concept of safety, depending on the safety of the soul of life, the foundation of happiness, the basis of the benefits of the source, the source of stability, and meticulously and conscientiously comply with the implementation of the country, the Group and the mine indicators of the spirit, learning Advanced cultural concepts, and actively carry out more than learning, more than technology, one to help one, one to one activities and job training activities, so that the division of chemical personnel to further enhance the theoretical knowledge and practical skills, to do a good job laying a solid foundation.

Second, sound safety management system, standardize safety management

At the beginning of the year, the mine leaders in charge of boiler safety management personnel signed a security responsibility, Division chemical personnel each wrote a security guarantee, the formation of self-insurance, mutual insurance, joint insurance system, in the merger of the property company and the plumbing team after the system is incomplete phenomenon, modify and improve the safety of the positions of the security responsibility system, security management system

Third, pay close attention to staff safety education and training, to create a safe cultural atmosphere

In order to improve the division of chemical personnel operating skills and theoretical level, our company actively formulate the division of chemical personnel training program, the division of chemical personnel seriously open every Friday safety study session, the week there is a summary of the problem, the staff find each other gaps, suggestions, find their own position in the operation of the equipment deficiencies, the use of Tuesday study time to hire a teacher to teach the equipment, and the equipment is not enough. The use of Tuesday study time, hire a teacher to talk about the boiler operation of theoretical knowledge, operational experience and accident cases, every week out of a boiler knowledge exercises, requiring the Division of chemical personnel to go down to think, the next week to ask questions, answers, and actively carry out job training, technical competitions, the year *** to carry out the Division of chemical theory test 4 times, the organization of job training 4 times, the training staff reached 100%.

Fourth, increase the maintenance of equipment during operation to prevent the occurrence of various types of failure

During the winter equipment operation, my company pay close attention to the boiler and auxiliary equipment maintenance work, equipped with two full-time maintenance workers to engage in routine maintenance, the requirements of the class to check the integrity of the safety accessories, and to do a good job once a week to check the test of the safety valve and once a week to slow down the gearbox, the grate axle, Water pumps and other equipment, oil injection work, the technician weekly review of maintenance records, maintenance requirements during the maintenance period can not miss any piece of equipment, any part, any accessory, so as to achieve the efficient and safe operation of the equipment.

Fifth, energy saving and consumption reduction, technological innovation work is remarkable

Small reforms, repair and waste, technological innovation work has been the theme of energy saving in our company. First, we strictly control the coal saving. In the process of coal transportation and daily management, strict management, pay close attention to the coal combustion work; in the operation, the furnace staff according to the external network load, timely adjustment of the grate speed, the thickness of the coal layer and the drum, induced draft fan air volume, so that the coal combustion rate increased substantially

high, from the previous 70% to 96%, and last year compared to the coal savings of 1,680 tons. The second is to strictly control power saving. In each boiler room are on the make-up water pump using frequency conversion speed control technology, reducing power consumption. Third, strict water conservation. Maintenance team insisted on regular inspections of the external network to prevent the occurrence of running, risk, leakage, so that water consumption has been effectively controlled. Fourth, strict environmental protection. Require the boiler room to take effective measures to ensure that the smoke emission standards, to do the slag day to day, to meet the environmental requirements.

1, the pipe network is in disrepair, corrosion is serious, the phenomenon of serious leakage, a serious waste of water.

2, a mining area industrial boiler 2 # furnace life of up to 20 years, has exceeded the service life, maintenance difficulties, and high annual maintenance costs.

3, outsourcing boiler room management is difficult, the work can not be implemented after the arrangement.

4, the overall quality of staff is not high, the concept of service quality is weak. In this heating period, there are users repeatedly call to reflect the problem, but our maintenance staff did not go to deal with timely, and finally the user reflected to the company's scheduling office and the company's leadership, to the company has caused a negative impact on the company, damage to the interests of the company. In the future, to strengthen the staff service quality concept of education, and strive to improve the overall quality of staff, for the company to enhance the quality of service to make a positive contribution.

2022 maintenance work summary sample 3

Near the end of the year, the equipment security center to do a good job in the maintenance work to protect the safety of the premise, and actively communicate with relevant departments to carry out a number of maintenance work. Work appliance maintenance, focusing on the completion of the nickel mine elevated hopper clearing tool production, lighthouse maintenance, and so on.

First, the material out of the warehouse

December, the equipment security center material out of the warehouse 2775.9 yuan, including fuel oil out of the warehouse 212.99 yuan, instrumentation 551.72 yuan, metal products out of the warehouse 1955.16 yuan.

Second, the flow of machine maintenance

This month on time to complete the maintenance of key equipment, maintenance of mechanical failure 128 times, of which the maintenance of electrical failures 45 times, the maintenance of the completion rate of 96.09% of the assignment.

1. complete the forklift 4 # steering cylinder oil seepage repair;

2. complete the frontal crane 1 # operating handle and gear switch replacement;

3. complete the sweeper 1 # brush replacement;

4. complete the crane 2 # outriggers support the repair;

5. complete the forklift 5 # right tilt cylinder oil seepage repair;

6. complete the forklift 5 # right tilt cylinder repair;

7. complete the forklift 5 # right tilt cylinder oil seepage repair;

7. complete the forklift 5 # right tilt cylinder repair; < /p>

8.

6. Completing the replacement of the right steering wheel bearing of forklift 2#;

7. Completing the replacement of the left rear tire of tractor 6#, and the replacement of the right front tire of tractor 5#;

8. Completing the repair of oil seepage from the left steering cylinder of bucket truck 5#;

9. Completing the work related to the sealing up of tractor 1#, 2#, and 3#;

10. Completing the 205 field generator use of security maintenance.

Third, the door machine maintenance

this month on time to complete the maintenance plan of the door machine and the maintenance plan of the work appliance, timely repair of the door machine failure 86 times, 31 times the grapple failure; door machine maintenance sent to complete the rate of 95.35%, the work appliance sent to complete the maintenance rate of 90.32%.

1. Completed KS25-04 # balance beam fracture repair work;

2. Completed 11 # door machine walking gearbox oil seepage treatment;

3. Completed 2 # door machine front left wire rope replacement;

4. Completed 5 # door machine centralized lubrication pump repair;

5. Completed 16 # door machine wire rope head repair;

6. Completed one door machine maintenance completed 95.35%.

6. Completed a container stabilizer transformation work;

7. Completed 4 sets of sub-timber grab repair plastic repair;

8. Completed three sets of nickel ore elevated hopper bucket cracking repair welding;

9. Completed 3 sets of nickel ore grab a coal grab a timber grab the replacement of steel wire rope.

10. Completion of a nickel ore grab bucket body weld repair, a nickel ore grab under the bearing beam of the accumulator plate weld repair

Fourth, safety and environmental protection

1. Meet the group equipment inspection center to actively cooperate with the operation of the department to carry out the daily use of the workshop and the terminal machinery and equipment checking activities, in addition to the hidden dangers of ensuring safety. Do a detailed inspection of the door machine flow machine and grab tools, etc., on the discovery of faults and the existence of hidden dangers in a timely manner to repair and deal with.

2. Sprint to keep the whole year, 100 days of production safety without accident activities in the last month, all aspects of the workshop and dock maintenance operations to enhance the safety supervision, comprehensive investigation and management of hidden accidents, to enhance the awareness of self-protection of workers, the implementation of safety precautions, and strive to achieve the year without all types of reported accidents.

3. December 17, the center organized the door machine repair class members to use the noon time for port machinery maintenance and repair of basic knowledge learning, focusing on combing the daily maintenance tasks in the various basic points and site operation specifications, improve the maintenance of the personnel operation of the self-safety precautionary awareness to enhance the implementation of the regional closure and the responsibility of the person responsible for the system;

4. The pre-holiday fire inspection, *** found three bottles of underpressure fire extinguishers, reported and replaced in a timely manner, to ensure that "safety first, prevention first" guidelines, by clarifying the safety responsibilities, strengthen the implementation of the responsibility to enhance the safety management, and to further promote the implementation of all safety work

< strong> 2022 maintenance work summary sample 4

First of all, I thank the leadership of the Tower Electric Company in the first half of 20__ the strong support and affirmation of the air conditioning work of the Engineering Department, and at the same time, I thank the various departments in the first half of the year on the air conditioning work of the Ministry of Engineering to give positive cooperation and understanding! Here, I put the Ministry of Engineering 20__ first half of the air conditioning work completed to the company to make a report.

20__ the first half of the company's leadership in the care and love and strong support, in the engineering department of the hard work of all employees and unremitting efforts, to overcome the small number of personnel, the workload increases and other difficulties, vigorously carry out repair and maintenance and digging the potential for technological transformation work, proactive solution to the equipment and facilities exist in a variety of problems, and energy saving and reduction of energy consumption has made a major breakthrough.

First, maintenance

plant air conditioning equipment running time is long, varying degrees of aging state, maintenance and operation is the main work of the air conditioning class. Therefore, to strengthen the maintenance of equipment, improve the service life of the equipment, the development of scientific and reasonable complete operation program, is to improve the operational efficiency of the important links. We improve the skills of personnel on the basis of the development of equipment operation plan, strengthen the maintenance, so that the air conditioning equipment and facilities are in the best operating condition, so as to achieve a reasonable use of energy, the purpose of saving money.

In 20__, we painted and anticorrosive work on the aging and corroded pipes and fans of the air conditioning and ventilation system, insulated some air conditioning pipelines, maintained the smoke exhauster and air blower of the office building, replaced the filling material of the two cooling towers of centrifugal and screw machines, and replaced the butterfly valve of water supply to the cooling tower of the screw machine (DN200). Do a good job of moisture-proof air conditioning room, repair the air conditioning room due to moisture short-circuit damage to the control box switch, repair the transformer room deformation damage to the air conditioning master switch, the air conditioning room of all the electrical equipment maintenance, centrifugal machine charged with refrigerant R1340, screw machine charged with refrigerant R22, the 22-meter steam room 1 #, 2 #, 3 # circulating pumps transformed into vertical pumps, the machine room to replace the 4 pressure gauges, 5 temperature gauges, calibrated the heat accumulator and flow sensors, maintained the heat piping and valves, and maintained the piping, valves, and end equipment of the air conditioning equipment and facilities. In the spring and fall twice on the indoor air conditioning to clean the return air filters, filter filters and other maintenance work, will not open all the use of air-conditioning valves closed to reduce energy loss, and do a good job in winter anti-freeze work, which is the largest and most arduous work before and after the use of more than four months of time. Usually, this work requires two people to work with a group to complete, but because of the engineering department staff, heavy tasks, heavy workload, in the spring maintenance work is basically completed by a person, which undoubtedly increases the difficulty of the work, but the staff overcame all kinds of difficulties, quality and quantity of the completion of this work task, the plant 175 units of air conditioning maintenance.

Second, the transformation project

The transformation of the central air conditioning is divided into two areas of four major projects.

Plant central air conditioning transformation, divided into two projects.

Plant 1 project: 22 meters of chilled water circulating pump transformation.

Before remodeling: because of the use of three old centrifugal pumps (IS125-100-315), because of the role of the equipment rubber cushion coupling, vibration is more serious, the noise is relatively large, the set of control room there is a sense of obvious vibration and noise. And the old water pump using oil lubricated packing water seal, and water leakage, oil leakage. Invite pump manufacturers to power plant guidance and maintenance, no significant improvement.

After the transformation: After changing to vertical pumps, the phenomenon of vibration, noise, water leakage, oil leakage is completely solved.

Plant 2 project: 41 meters of air-cooled screw machine overhaul. Before overhaul: Because of long-term work, there are the following defects.1. There is water in the refrigerant, poor refrigeration effect, low energy efficiency ratio.2. There are impurities in the freezer oil, affecting the suction capacity and lubrication.

3. Compressor motor in the yin and yang rotor wear, exhaust pressure is low, high and low pressure string gas, refrigeration capacity is reduced.

4. Cooling fan working continuously for a long time, parts aging, poor exhaust capacity.

5. condenser, radiator work for a long time, there are debris and scaling on the tube wall, resulting in poor heat exchange capacity, seriously affecting the heat dissipation and refrigeration.

6. Electrical components in the distribution box for a long time, there is heat and action inflexible phenomenon. Some control and protection circuits transmit unstable signals, and the equipment has the phenomenon of malfunction.

After the transformation: greatly improve the efficiency of the compressor motor, completely improve the screw machine heat exchange, control and protection of the phenomenon of instability.

Office area central air conditioning transformation, also divided into two projects.

Office area project No. 1: hospitality building water-cooled screw machine overhaul. Before the overhaul:

1. The cooling tower has been working for a long time, and the filler material is aging and scaling, which seriously affects heat dissipation. At the same time, the condenser in the pipeline scaling, seriously affecting the heat exchange. 2. Water in the refrigerant, poor refrigeration, low energy efficiency ratio. 3. Impurities in the freezer oil, affecting the suction ability and lubrication. 4.

4. Compressor motor star wheel serious wear and tear, noise, exhaust pressure is low, high and low pressure string gas, reduced refrigeration capacity.

5. The control module in the distribution box is updated, the equipment is upgraded, and the control module is also updated. After the transformation: a complete solution to the phenomenon of poor heat dissipation, high noise, low efficiency, oil leakage.

Office Area 2 project: hospitality building centrifuge overhaul. Before overhaul: because of long-term work, there are the following defects.

1. Working for a long time, there is a serious lack of freezer oil, which affects the suction capacity and lubrication, as well as noisy refrigeration is poor and the current is high.

2. Cooling tower working for a long time, filler aging, scaling, seriously affecting heat dissipation. At the same time, the pipeline in the condenser produces scaling. Seriously affect the heat exchange. 3. There is water in the refrigerant, poor refrigeration effect, low energy efficiency ratio.

4. Compressor motor star wheel serious wear and tear, noise, exhaust pressure is low, high and low pressure string gas, refrigeration capacity is reduced.

5. The control module in the distribution box is updated, the equipment is upgraded, and the control module is also updated.

After the transformation: greatly improve the compressor refrigeration capacity. Completely solve the high-temperature situation for the office area cooling tension.

20__ the latter half of the year, all of our staff will be a new mental outlook to meet new challenges, and other departments of the staff together committed to the tower power to provide a safe, comfortable, fast work, production environment, to ensure that the key maintenance location (centralized control room electronic equipment room, excitation of the small room, inverter room, etc.) ambient temperature, so that the unit to play a higher degree of efficiency. We will continue to grow under the leadership of Tower Power. We are confident that with practical action to air conditioning work to a new height, a new starting point, to the company to hand over a qualified answer sheet!

2022 maintenance work summary sample 5

____ graduated from ___ Technical School, the same year at the end of September assigned to ___ Thermal Power Plant dust desulfurization workshop work. During this period, under the guidance of the leaders and team leaders and the help of the whole workshop, I carefully study the theoretical knowledge of dust removal and desulfurization operation and equipment maintenance technology, and quickly familiarize and master the second, the actual operation of the secondary equipment on site, the operation of the equipment of the abnormalities, accidents, judgments and treatment, and as a maintenance duty personnel should know and should be some basic knowledge, routine and various regulations and rules and regulations, in order to do a good job of maintenance work. Laid a solid foundation for good maintenance work. In a few years of working life, the superior leadership of the cordial care and work colleagues of the enthusiasm to help, so that my ability to work quickly grow, mature, and become a qualified maintenance personnel. To work as the center of the circle, with hard work, continuous learning, conscientious and responsible work attitude as the radius is my understanding of personal career, in the cause, I heartily pursued their dreams, waving youthful sweat. Personal qualities also get progress to improve. Summarize the main points are as follows:

First, the correct work attitude

In recent years, with the rapid development of electric power technology, the requirements of the overall development of employees, all aspects of the higher quality. In order to adapt to the new situation in the whole of the need to do a good job, strengthen their theoretical learning, and constantly enhance the consciousness of love and dedication is my long-term requirements for their own. Always put the continuous learning, comprehensive learning as the great joy of life, use spare time to learn relevant professional knowledge, and through the learning in the enterprise network online to improve their knowledge reserves, and strive to train themselves to adapt to the needs of enterprises specializing in multi-competent composite talents. Actively participate in various professional skills and business training organized by the plant, in the process of constantly improving personal skills, self-improvement, development. Since joining the work, no matter in the operation or overhaul, I first find my own correct position, make work objectives and work plan for myself. Ask yourself how to do to master comprehensive business knowledge, how to do to play a good grasp of their own skills and knowledge, a series of how to do from time to time will urge me to set up a correct attitude to work, do a good job in each of their own work. In their own continuous efforts finally came to the leadership of the praise, has been awarded the workshop ''sub-seat staff award'', ''Advanced Individual Award'', ''Advanced Individual Award'', ''Advanced Individual Award'', ''Advanced Individual Award'', ''Advanced Individual Award'' and ''Advanced Individual Award''. '', '' spiritual civilization award '' honorary title.

Second, good work style and skilled maintenance skills

20__, I was assigned to the maintenance class work, responsible for dust removal and desulfurization maintenance management. In the face of heavy and trivial daily work, the hard working environment I rose to the challenge, using all available time, comprehensive and detailed study of the workshop procedures and maintenance knowledge, careful and reasonable arrangements for each job, each detail. At that time, I was mainly responsible for maintenance tasks, in order to enable the normal operation of the equipment, the work, I do my duty, and strive to study the business knowledge, seriously fill out the repair records and maintenance task list, carefully counting the various maintenance reports of the team, and reported in a timely manner. After work, I actively communicate with the person in charge of the workshop, and learn from them with an open mind the management methods of the maintenance team. Efforts, through the efforts of colleagues *** with efforts, finally summarized a set of more adapted to the normal operation of the equipment overhaul process. In their own continuous learning, had participated in the group company welder skills competition, won the sixth prize.

Third, good teamwork spirit

In the modern work environment with teamwork is very important. Effective teamwork can improve work efficiency. For this reason, in the work I not only work hard, but also with colleagues to deal with each other very well. In addition to learning from each other in the workplace, I often talk to my colleagues in life to understand their inner thoughts, and come up with ideas and solutions for each other. As an ordinary maintenance worker, I have been integrated into this big family of the power plant for more than 4 years without realizing it. Looking back at the road, that is not far from the flash is still blue flame, rising up and clearly is a beautiful purple and red. Stopping a long time to look at, concentrate and meditate, accompanied by the hurried steps of the power plant, watching the distinctive flag of China Coal Gasification Group Corporation, at this moment, I am proud of you, proud of you, all my passion is burning for you. I still remember the first time I put on the blue professional clothes of the power plant, the joy in my heart that could not be hidden, my dream came true, bathing in the morning sunrise I proudly walked to the work station. After work, quietly feel the joy of dedication, quietly enjoy the joy of work, my soul in the purification. Busy is the main theme of my work, with love and dedication in the joy of shaping me, the name of the ordinary repairman regretless life.

2022 maintenance work summary sample 5 related articles :

★ 2022 electrician work summary sample 10

★ The latest 2022 year-end summary of the work of the model template 10 selected

★ year-end 2022 individual work summary sample (10)

★ 2022 equipment management work summary 5 sample

★ electrician 2022 annual individual work summary 10

★ 2022 electrician individual year-end work summary selected 10

★ 2022 sanitation employee work summary latest 5

★ 2022 first half of the work summary (12)

★ 2022 Year-end summary of personal summary of 10

★ 2022 work summary sample template of 12